| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.2 Cr+₹10.7 L (10.0%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹1.2 Cr+₹10.7 L (10.0%) | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹1.2 Cr+₹16.5 L (15.4%)Rejected-Finance A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹1.2 Cr+₹16.5 L (15.4%) | L3 | Rejected-Finance Not L1 bidder |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified in techno commercial evaluation |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L2 | ABADH KISHOR SHARMA L3 | NAMO FOUNDATION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 24.75 | Cubic Meter | 7,084.21 ₹1,75,334.19 | 7,490 ₹1,85,377.5 | 6,811.74 ₹1,68,590.57 Lowest |
| 2.00 | Groove cutting in roof/ floor (Soft Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 24.75 | Cubic Meter | 5,665.87 ₹1,40,230.23 | 5,990 ₹1,48,252.5 | 5,447.95 ₹1,34,836.76 Lowest |
| 3.00 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 75 | Cubic Meter | 2,517.37 ₹1,88,802.9 | 2,660 ₹1,99,500 | 2,420.55 ₹1,81,541.25 Lowest |
| 4.00 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 405 | Cubic Meter | 786.55 ₹3,18,553.56 | 830 ₹3,36,150 | 756.3 ₹3,06,301.5 Lowest |
| 5.00 | Loading of material (Cement) into tub on surface within a lead of 50m. | 188.85 | Metric Tonne | 233.34 ₹44,067.17 | 245 ₹46,268.25 | 224.37 ₹42,372.27 Lowest |
| 6.00 | Loading of material (Sand ) into tub on surface within a lead of 50m. | 205.02 | Cubic Meter | 402.75 ₹82,571.89 | 425 ₹87,133.5 | 387.26 ₹79,396.05 Lowest |
| 7.00 | Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m. | 376.99 | Cubic Meter | 402.75 ₹1,51,832.87 | 425 ₹1,60,220.75 | 387.26 ₹1,45,993.15 Lowest |
| 8.00 | Loading of material (Steel) into tub on surface within a lead of 50m. | 28.64 | Metric Tonne | 233.34 ₹6,683.93 | 244 ₹6,989.14 | 224.37 ₹6,426.85 Lowest |
| 9.00 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 188.85 | Metric Tonne | 212.24 ₹40,082.13 | 222 ₹41,924.7 | 204.08 ₹38,540.51 Lowest |
| 10.00 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 205.02 | Cubic Meter | 366.34 ₹75,107.03 | 384 ₹78,727.68 | 352.25 ₹72,218.29 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹1.7 L
Closing Date
9 Mar 2026, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 100 Nos. Isolation stopping for different panels (CMP-L3, L4, J4, J5, J6 and J7) and to seal off old depillaring panel-J3 at Rajgamar 6and7 Incline, Rajgamar Sub Area.
2026_SECL_353808_1
SECL/KB/GM/SO(M)/eNIT/25-26/23
Open Tender
Civil Works - Others
Item Rate
730 days
Korba
As per NIT
5 documents required · 5 mandatory
₹1.7 L
27 Aug 2026
20 Feb 2026
10 Mar 2026
20 Feb 2026
9 Mar 2026
21 Feb 2026
20 Feb 2026 - 2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 24.75 | Cubic Meter | 6,811.74 | ₹1,68,590.57 |
| 2 | Groove cutting in roof/ floor (Soft Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 24.75 | Cubic Meter | 5,447.95 | ₹1,34,836.76 |
| 3 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 75 | Cubic Meter | 2,420.55 | ₹1,81,541.25 |
| 4 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) | 405 | Cubic Meter | 756.3 | ₹3,06,301.5 |
| 5 | Loading of material (Cement) into tub on surface within a lead of 50m. | 188.85 | Metric Tonne | 224.37 | ₹42,372.27 |
| 6 | Loading of material (Sand ) into tub on surface within a lead of 50m. | 205.02 | Cubic Meter | 387.26 | ₹79,396.05 |
| 7 | Loading of material (stone aggregate below 40mm nominal size) into tub on surface within a lead of 50m. | 376.99 | Cubic Meter | 387.26 | ₹1,45,993.15 |
| 8 | Loading of material (Steel) into tub on surface within a lead of 50m. | 28.64 | Metric Tonne | 224.37 | ₹6,426.85 |
| 9 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 188.85 | Metric Tonne | 204.08 | ₹38,540.51 |
| 10 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) | 205.02 | Cubic Meter | 352.25 | ₹72,218.3 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 0.43 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_366622.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .