Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance | -35.57% | ₹3.1 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance | -33.99% | ₹3.1 L | L2 | Admitted-Finance |
| 3 | L3₹3.3 LAdmitted-Finance | -30.99% | ₹3.3 L | L3 | Admitted-Finance |
| 4 | L4₹3.5 LAdmitted-Finance | -26.09% | ₹3.5 L | L4 | Admitted-Finance |
| 5 | L5₹3.8 LAdmitted-Finance | -20.99% | ₹3.8 L | L5 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,500
Closing Date
23 Mar 2026, 6:00 pmClosed
Er Parvez Malik
PWD Div Jammu East
Up-gradation of Link road at Lane No. 04, Chinore, Jammu.
2026_PWDJK_306310_2
138 of 2025-26 dated 16-03-2026
Open Tender
Civil Works
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
as per NIT
₹9,500
30 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Demolishing cement concrete manually/by mechanical means 1:3:6 or richer mix
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil
P/L in position Cement conc. 1 cement:4fine sand:8graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level.
P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
Centring and shuttering including strutting, propping etc and removal of form work for.-
foundation, footing, base of columns
Suspended floor/slab
Edges of slab ( Above 20cm wide )
Providingand and laying in position specified grade of reinforced cement concrete (1:1.5:3) excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level.
Reinforcement for RCC works including straightening, cutting, bending, placing in position and binding all complete
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
P/L in position Cement conc. 1 cement:2fine sand:4graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level.
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand complete all as per direction of Engineer-in-Charge. 16.94.1 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
Carriage of Material
Disposal of mulba by an avg lead of 5 Km by M.T
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_994619.pdf
techsummary_994619.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_994619.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid