Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Accepted-Technical | Accepted-Technical Responsive |
| 4 | Accepted-Technical | Accepted-Technical Responsive |
Tender Value
₹22 L
EMD Value
₹44,000
Closing Date
10 Aug 2026, 12:00 pmClosed
Sada Chitrakoot
Sada Chitrakoot
Construction of interlocking-block road from the gate of the Karwi Court complex in Chitrakoot district to the Chief Veterinary Officers office
2026_CSADA_1172745_1
742/Nirman/2026-27 Dt. 25-07-2026
Open Tender
Civil Works
Percentage
60 days
Sada Chitrakoot
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Sada
₹44,000
14 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. | 648 | Sqm | 98 | ₹63,504 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. | 25.6 | Cum | 2,574 | ₹65,894.4 |
| 3 | Providing and Laying of Interlocking Concrete Block Pavements (Grade-M40) having thickness 80 mm as per drawings and Technical Specification Clause 1504. | 1,024 | Sqm | 848 | ₹8,68,352 |
| 4 | Excavation in foundation ordinary soil. (Including royalty) | 126 | Cum | 133 | ₹16,758 |
| 5 | Providing and laying Cement concrete 1:3:6 (1 cement : 3coarse sand : 6 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation | 15.75 | Cum | 6,983 | ₹1,09,982.25 |
| 6 | Centering and shuttering including strutting, propping etc. and removal
of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 252 | Sqm | 631 | ₹1,59,012 |
| 7 | Reinforcement Cement concrete with 2 cm. gauge approved stone, ballast, approved coarse sand and cement in the proportion of 3:1.5:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. | 59.32 | Cum | 8,139 | ₹4,82,846.18 |
| 8 | Steel reinforcment for R.C.C work including strainghtening cutting bending placing in position & binding all complete up to plinth level. Thermo machanically treated bars of grade Fe-500D or more. | 46.57 | Qtl | 8,088 | ₹3,76,659.17 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
BOQ_2202279.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .