| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹8.2 L+₹8,034.20 (0.98%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.6 L+₹48,000 (5.88%)Admitted-Finance DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN WEST BENGAL 713367 | 713367 | L3 | Admitted-Finance | |
| 4 | L4₹8.8 L+₹59,995.44 (7.35%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHATRUGHAN TRADERS L3 | M D CHATTARAJ L4 | TAPAS KUMAR MUKHERJEE L2 | PRADIP ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|
| 1.00Items Description | |||||||
| 2.001. Requirement of outside manpower for the various jobs at Narsamuda Colliery under Sodepur Area. | |||||||
| 2.01 | Lifting of gate end box, starter, motor etc. from 56D/S7L to surface, 10 heads per shift x 4 shifts = 40 heads | 40 | Nos. | 1,402.6 ₹56,104 Lowest | 1,402.6 ₹56,104 Lowest | 1,430 ₹57,200 | 1,402.6 ₹56,104 Lowest |
| 2.02 | Lowering of 3.3kV motor and pump from 28D/50L to 28D/56L, fixing of bed plate, laying of pipe line installation. 10 heads per shift X 4 shifts = 40 heads | 40 | Nos. | 1,402.6 ₹56,104 Lowest | 1,402.6 ₹56,104 Lowest | 1,430 ₹57,200 | 1,402.6 ₹56,104 Lowest |
| 2.03 | 1800 mtr 22 mm haulage rope laying of rope, removal of old rope at from 28D/1L to 2D/3L endless haulage - 8 heads per shift X 2 shifts = 16 heads. | 16 | Nos. | 1,402.6 ₹22,441.6 Lowest | 1,402.6 ₹22,441.6 Lowest | 1,430 ₹22,880 | 1,402.6 ₹22,441.6 Lowest |
| 2.04 | loading unloading in Coal tubs and laying of 3.3kV, 70 sq.mm cable for 200 meters. 4 heads per shift X 4 shifts = 16 heads | 16 | Nos. | 1,402.6 ₹22,441.6 Lowest | 1,402.6 ₹22,441.6 Lowest | 1,430 ₹22,880 | 1,402.6 ₹22,441.6 Lowest |
| 2.05 | Replacing of 2 nos. 11kV OCB with 11kV VCB at surface substation. 8 heads per shift X1 shift =8 heads | 8 | Nos. | 1,402.6 ₹11,220.8 Lowest | 1,402.6 ₹11,220.8 Lowest | 1,430 ₹11,440 | 1,402.6 ₹11,220.8 Lowest |
| 2.06 | Shifting of Gate end box for SDL, UDM - 8 heads per shift X 3 shifts - 24 | 24 | Nos. | 1,402.6 ₹33,662.4 Lowest | 1,402.6 ₹33,662.4 Lowest | 1,430 ₹34,320 | 1,402.6 ₹33,662.4 Lowest |
| 2.07 | Overhead Cost & others | 1 | Nos. | 28,457.76 ₹28,457.76 | 32,450 ₹32,450 | 20,592 ₹20,592 Lowest | 25,457.76 ₹25,457.76 |
| 2.08 | Add. CMPF/EPF @ 12% on Labour charges | 1 | Nos. | 27,236.64 ₹27,236.64 | 27,236.64 ₹27,236.64 | 24,710 ₹24,710 | 24,236.64 ₹24,236.64 Lowest |
Tender Value
₹8.7 L
EMD Value
₹10,900
Closing Date
27 Nov 2025, 6:00 pmClosed
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
1. Requirement of outside manpower for the various jobs at Narsamuda Colliery under Sodepur Area. 2. Replacement of 22mm Haulage rop
2025_ECL_347591_1
ECL/SDPA/AE(EnM)/e/25-26/239 dt.13.11.2025
Open Tender
Miscellaneous Works
Item Rate
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,900
30 Dec 2025
17 Nov 2025
28 Nov 2025
17 Nov 2025
27 Nov 2025
17 Nov 2025
17 Nov 2025 - 20 Nov 2025
Amount
Items Description
1. Requirement of outside manpower for the various jobs at Narsamuda Colliery under Sodepur Area.
Lifting of gate end box, starter, motor etc. from 56D/S7L to surface, 10 heads per shift x 4 shifts = 40 heads
Lowering of 3.3kV motor and pump from 28D/50L to 28D/56L, fixing of bed plate, laying of pipe line installation. 10 heads per shift X 4 shifts = 40 heads
1800 mtr 22 mm haulage rope laying of rope, removal of old rope at from 28D/1L to 2D/3L endless haulage - 8 heads per shift X 2 shifts = 16 heads.
loading unloading in Coal tubs and laying of 3.3kV, 70 sq.mm cable for 200 meters. 4 heads per shift X 4 shifts = 16 heads
Replacing of 2 nos. 11kV OCB with 11kV VCB at surface substation. 8 heads per shift X1 shift =8 heads
Shifting of Gate end box for SDL, UDM - 8 heads per shift X 3 shifts - 24
Overhead Cost & others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
2. Replacement of 22mm Haulage rope for X cut direct haulage 28D direct Haulage 3L Endless Haulage and 52L Endless Haulage at Narsamuda Colliery under Sodepur Area.
2000 mtr 22mm haulage rope collection. unloading, hanging at support girder, laying of 1600 mtr rope, removal of old rope at 4 X cut direct haulage - 8 heads per shift X 2 shifts = 16 heads.
2000 mtr 22 mm haulage rope collection, unloading, hanging at support girder, laying of rope, removal of old rope at 28D direct haulage -- 10 heads per shif X 2 shifts = 20 heads.
1500 mtr 19 mm haulage rope collection, unloading, hanging at support girder, loading in the two no of empty tubs, transporting up-to 45D/52 L, laying along 52L endless route, removal of old ropes. 8 heads per shift X 3 shifts = 24 heads.
22mm old and used haulage rope transporting at the 3L/14D, laying the haulage rope, remove the old rope 8 heads per shift X 2 shifts = 16 heads.
Overhead cost and others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
3. Dismantling, loading, transporting, unloading & filling of two nos. of Simplex make Standard Hight SDL machine at Narsamuda Colliery under Sodepur Area.
Dismantling Loading transporting of SDL machine no 719 - 4 heads per shift X 8 shifts =32 heads.
Unloading & fitting SDL machine no 719 at 36L/8D -2 heads per shift X 4 Shift = 8 Heads.
Dismantling Loading transporting of SDL machine no 717 - 4 heads per shift X 8 shifts = 32 heads.
Unloading & fitting SDL machine no 717 at 36L/8D --- 2 heads per shift X 4 Shift = 8 Heads.
Overhead Cost & others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
4. Requirement of out side manpower for the installation of pumps at 28D/56L and lifting of unsued starter & motor at Narsamuda Colliery under Sodepur Area.
Lifting of 3.3KV starter (01 no.), 3.3KV motor from 28D/56L. to surface. 10 heads per shift X 6 shifts = 60 heads.
Lowering of 3.3kV motor and pump from 28D/50L to 28D/56L, fixing of bed plate, laying of pipe line installation. 10 heads per shift X 4 shifts = 40 heads.
Lowering of 550V motor and pump from 28D/5OL to 28D/56L, fixing of bed plate, laying of pipe line installation. 10 heads per shift X 2 shifts = 20 heads.
Overhead Cost & others
Add. CMPF/EPF @ 12% on Labour charges
Add. Bonus @ 8.33% on Labour charges 8.33%
Add. Pension @ 7% on Labour charges
Total impact of GST for the purpose of CTC
TAPAS KUMAR MUKHERJEE (BID ID -1200156)
SHATRUGHAN TRADERS (BID ID -1199236)
M D CHATTARAJ (BID ID -1199249)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.16 MB
BOQ_360295.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .