| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | ₹13.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹13.8 L+₹6,879.40 (0.50%)Rejected-AOC KERADAMATTAM KOTAGIRI | ₹13.8 L+₹6,879.40 (0.50%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹15.1 L+₹1.4 L (10.4%)Rejected-AOC | ₹15.1 L+₹1.4 L (10.4%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹16.5 L+₹2.8 L (20.4%)Rejected-AOC | ₹16.5 L+₹2.8 L (20.4%) | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M.MAHENDIRAN L3 | Raghu L4 | R Dayanithi L1 | Purushothaman L2 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of 30000 Liters OHT at Udayarpalayam H/O Pandiyanallore Panchayat in Sholinghur Union Ranipet District | |||||||
| 2.00Earthwork excavation and dwposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | |||||||
| 3.00 | Ist Depth | 63.54 | m3 | 224 ₹14,233 | 215 ₹13,661 | 203 ₹12,899 Lowest | 204 ₹12,962 |
| 4.00 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bd officers | 2.7 | m3 | 1,644 ₹4,445 | 1,500 ₹4,056 | 1,489 ₹4,026 Lowest | 1,497 ₹4,048 |
| 5.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | 2.7 | m3 | 4,778 ₹12,920 | 5,068 ₹13,704 | 4,329 ₹11,706 Lowest | 4,351 ₹11,765 |
| 6.00 | RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | 13.52 | m3 | 8,073 ₹1,09,147 | 8,880 ₹1,20,058 | 7,314 ₹98,885 Lowest | 7,352 ₹99,399 |
| 7.00 | Upto GL | 1.75 | m3 | 7,955 ₹13,921 | 8,880 ₹15,540 | 7,207 ₹12,612 Lowest | 7,244 ₹12,677 |
| 8.00 | Above Gl and Upto 4.50m Height | 2.83 | m3 | 8,075 ₹22,852 | 8,880 ₹25,130 | 7,316 ₹20,704 Lowest | 7,354 ₹20,812 |
| 9.00 | Above 4.50m and upto 7.32m Ht from GL | 2.22 | m3 | 8,312 ₹18,453 | 9,100 ₹20,202 | 7,530 ₹16,717 Lowest | 7,569 ₹16,803 |
| 10.00 | Above 7.32m and upto 10.98m Ht from GL | 2.53 | m3 | 8,548 ₹21,626 | 9,350 ₹23,656 | 7,744 ₹19,592 Lowest | 7,794 ₹19,719 |
Tender Value
Refer Docs
EMD Value
₹17,950
Closing Date
21 Aug 2026, 3:05 pmClosed
President Pandianallore
The Village President
Construction of 30000 Litre Capacity Over Head Tank with 12m Staging for udayarpalayam Village in Pendianallore Panchayat in Sholinghur Union
2026_RDTN_692062_1
A2/751/2026
Open Tender
Civil Works
Item Rate
President Pandianallore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹17,950
Yes
1 Sept 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 30000 Liters OHT at Udayarpalayam H/O Pandiyanallore Panchayat in Sholinghur Union Ranipet District | - | - | - | - |
| 2 | Earthwork excavation and dwposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | - | - | - | - |
| 3 | Ist Depth | 1 | m3 | - | - |
| 4 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bd officers | - | m3 | - | - |
| 5 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | - | m3 | - | - |
| 6 | RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | 13.52 | m3 | - | - |
| 7 | Upto GL | 1.75 | m3 | - | - |
| 8 | Above Gl and Upto 4.50m Height | 2.83 | m3 | - | - |
| 9 | Above 4.50m and upto 7.32m Ht from GL | 2.22 | m3 | - | - |
| 10 | Above 7.32m and upto 10.98m Ht from GL | 2.53 | m3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_832109.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .