| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹56.1 LAccepted-AOC | ₹56.1 L | L-1 | Accepted-AOC Accepted as L-1 |
| 2 | L-2₹60.4 LRejected-Finance | ₹60.4 L | L-2 | Rejected-Finance Rejected as L-2 |
| 3 | L-3₹65.3 LRejected-Finance VILL RUNGTA COLLIRY P O RUNGTA COLLIRY DISTT SHAHDOL MP PIN 484110 | SHAHDOL | MADHYA PRADESH | 484110 | ₹65.3 L | L-3 | Rejected-Finance Rejected as L-2 |
| Sl No | Description | Qty | Unit | VIKASH KUMAR VISHWAKARMA | MUNSHI RAM | MAHENDRA SINGH |
|---|---|---|---|---|---|---|
| 1.00work description | ||||||
| 1.01 | General cleaning/house keeping not exceeding 5cm in depth Including disposal of cleaned muck/debris to be stacked upto50m. or to be | 431.5 | m3 | 1,80,194.4 ₹2.1 L | 1,90,550.4 ₹2.2 L | 1,72,600 ₹2.0 L |
| 1.02 | Groove cutting for stopping and manhole by chisel/pickaxe and hammer
(a)in soft stone (In floor) | 10.79 | m3 | 13,912.63 ₹16,416.90 | 48,155.77 ₹56,823.81 | 59,345 ₹70,027.10 |
| 1.03 | (c) In Coal | 42.49 | m3 | 73,847.62 ₹87,140.19 | 78,088.97 ₹92,144.98 | 93,478 ₹1.1 L |
| 1.04 | (RCC) Reinforced cement concrete(1:2:4) In wall/roof ceiling of alr crossing/ stopping (any thickness) in u/g (Excluding,shuttering, reinforcement cutting, bending. placing In position and binding etc) | 242.4 | m3 | 9,14,332.8 ₹10.8 L | 9,66,933.6 ₹11.4 L | 11,87,760 ₹14.0 L |
| 1.05 | Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, prapping etc complete.
(6.00 x 2.00x2x165) = 3960.00 m2 | 2,521.5 | m2 | 17,72,614.5 ₹20.9 L | 19,03,732.5 ₹22.5 L | 12,85,965 ₹15.2 L |
| 1.06 | 6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material) | 2,521.5 | m3 | 6,48,025.5 ₹7.6 L | 7,02,162.11 ₹8.3 L | 2,01,720 ₹2.4 L |
| 1.07 | Loading of all kind building materials In to tub at Inc. mouth-
a) Cement | 1,679 | bag | 12,760.4 ₹15,057.27 | 13,180.15 ₹15,552.58 | 15,111 ₹17,830.98 |
| 1.08 | b) Sand + stone chips(182.38+334.37m3) | 516.75 | m3 | 1,11,535.32 ₹1.3 L | 1,21,741.13 ₹1.4 L | 1,49,857.5 ₹1.8 L |
| 1.09 | c) Steel rod(8 mm) | 7.29 | Te | 539.46 ₹636.56 | 586.12 ₹691.62 | 721.71 ₹851.62 |
Tender Value
₹80.4 L
EMD Value
₹1.0 L
Closing Date
23 Jan 2026, 5:00 pmClosed
STAFF OFFICER MINING SECL SOHAGPUR
OFFICE OF STAFF OFFICER MINING SECL SOHAGPUR
Construction of 80 Nos. RCC Ventilation Stopping in 21R,14R and -23LE in CM Panel and 26D LHD panel at Seam- VI(B) of Rajendra U.G. Mine.
2026_SECL_350735_1
SECL/SGP/SO(M)/25-26/NIT-720 dt 07.01.2026
Open Tender
Civil Works - Others
365 days
RAJENDRA UG MINE
as per NIT
8 documents required · 8 mandatory
₹1.0 L
Yes
9 Mar 2026
7 Jan 2026
24 Jan 2026
7 Jan 2026
23 Jan 2026
8 Jan 2026
7 Jan 2026 - 16 Jan 2026
General cleaning/house keeping not exceeding 5cm in depth Including disposal of cleaned muck/debris to be stacked upto50m. or to be
Groove cutting for stopping and manhole by chisel/pickaxe and hammer (a)in soft stone (In floor)
(c) In Coal
(RCC) Reinforced cement concrete(1:2:4) In wall/roof ceiling of alr crossing/ stopping (any thickness) in u/g (Excluding,shuttering, reinforcement cutting, bending. placing In position and binding etc)
Centring, shuttering, finishing and reinforcement including cutting,bending, placing in position and binding and strutting, prapping etc complete. (6.00 x 2.00x2x165) = 3960.00 m2
6mm thick cement plaster(1:4) to RCC/PCC work in u/g (exclusive material)
Loading of all kind building materials In to tub at Inc. mouth- a) Cement
b) Sand + stone chips(182.38+334.37m3)
c) Steel rod(8 mm)
Un-loading of all kinds of building materlals at destination In UG, a) Cement
b) Sand + stone chips(295.47+539.06m3)
c) Steel rod(10 mm)
Transportaion of material with tramming & pushing coupling & uncoupling with haulages for a distance 01 lead or part there of and bringing the empty tub to the surface a) Cement
b) Sand + stone chips(182.38+334.37m3)
c) Steel rod(8 mm)
Lead for transportation/ carriage of all kinds of building materials by manually (75m)
supply and stacking of material Including cost of material, Transportatlon, Royaity etc. complete (a) Cement
(b)Sand
(C)Stone metal (20 mm)
(d)steel (8 mm)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 1.37 MB
BOQ_363493.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid