Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC Accept |
| 2 | L2₹8.4 LRejected-AOC | ₹8.4 L | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | Rajakumaresh S L1 | K.MOHAN L2 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF KITCHEN SHED AT GOVT BOYS HIGHER SECONDARY SCHOOL IN POTHAKUDI PANCHAYAT | |||||
| 2.00 | Providing 230 mm dia RCC pile hole using hand bore drill and RCC 1:2:4 mix using 20mm ISS HBG Metal including cost and conveyance of all materials and all labour charges etc.,complete | 1.72 | Cum | 14,340 ₹24,664.8 Lowest | 14,340.79 ₹24,666.16 |
| 3.00 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete | 3.6 | Cum | 263 ₹946.8 Lowest | 263.78 ₹949.61 |
| 4.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 3.26 | Cum | 2,547 ₹8,303.22 Lowest | 2,547.77 ₹8,305.73 |
| 5.00 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. | 10.8 | Cum | 120 ₹1,296 Lowest | 120.99 ₹1,306.69 |
| 6.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 3.85 | Cum | 6,493 ₹24,998.05 Lowest | 6,493.88 ₹25,001.44 |
| 7.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. A) Below Basement | 5.2 | Cum | 6,327 ₹32,900.4 Lowest | 6,327.04 ₹32,900.61 |
| 8.00 | . B) Above Basement | 23.41 | Cum | 6,419 ₹1,50,268.79 Lowest | 6,419.91 ₹1,50,290.09 |
| 9.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete I) Below Basement | 18.34 | Sqm | 547 ₹10,031.98 Lowest | 547.5 ₹10,041.15 |
| 10.00 | II) LINTELS, RCC SLABS, BEAMS, TEE or ELL BEAMS, | 39.46 | sqm | 1,095 ₹43,208.7 Lowest | 1,095 ₹43,208.7 Lowest |
Tender Value
₹8.4 L
EMD Value
₹8,440
Closing Date
31 Oct 2025, 3:00 pmClosed
BLOCK DEVELPOMENT OFFICER (B.PT)
BLOCK DEVELOPMENT OFFICE ,NEEDAMANGALAM
Construction of Kitchen shed building at Govt Boys Higher secondary School, Pothakudi in Pothakudi Panchayat
2025_RDTN_616883_1
3966/2025/A5
Open Tender
Civil Works
Item Rate
NEEDAMANGALAM
Construction of Kitchen shed building at Govt Boys Higher secondary School, Pothakudi in Pothakudi Panchayat
3 documents required · 3 mandatory
₹0
₹8,440
11 May 2026
24 Oct 2025
31 Oct 2025
24 Oct 2025
31 Oct 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
PothakudiPricebid.pdf
Tender Documents • 0.92 MB
PothakudiTechBid.pdf
Additional Documents • 0.87 MB
BOQ_737140.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].