Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹44.9 CrAccepted-AOC 3 4 FIRST FLOOR A WING PINJAN SATAV APARTMENT RING ROAD LAXMINAGAR PHALTAN | PUNE | MAHARASHTRA | 412206 | 1 | Accepted-AOC Work Order | |
| 2 | 2₹52.6 Cr+₹4.5 Cr (9.43%)Rejected-Finance CTS NO 495 A 45 PLOT NO 46 SHIVSAMPADA MUTHA COLONY SADAR BAZAR SATARA | SATARA | SATARA | MAHARASHTRA | 415001 | 2 | Rejected-Finance Reject | |
| 3 | 3₹55.6 Cr+₹7.5 Cr (15.7%)Rejected-Finance 39 PRATAPGANJ PETH SATARA TALUKA DISTRICT SATARA | PUNE | MAHARASHTRA | 412206 | 3 | Rejected-Finance Reject | |
| 4 | Not Admitted-Fee/PreQual/Technical G 8 PANDURANG BHAVAN BORADE PETROL PUMP CHOWK MALKAPUR KARAD SATARA DISTRICT | PUNE | MAHARASHTRA | 412206 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹42.8 Cr
EMD Value
₹21.4 L
Closing Date
16 Aug 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer (PMGSY) MRRDA, Pune Region
Superintending Engineer (PMGSY) MRRDA, Pune Region Pune Administrative Bldg 3 rd Floor Block No 306 opp. Council Hall Pune 411001
Package NO. RD-SAT-A255 Tal. Phaltan, Dist. Satara Total 11 Work
2024_MMGSY_1060602_4
E-Tender NO.15/2024-25
Open Tender
Civil Works - Roads
Percentage
730 days
Satara
As Per Tender
8 documents required · 8 mandatory
₹29,500
₹21.4 L
Superintending Engineer (PMGSY) MRRDA, Pune Region
1 Oct 2024
29 Jul 2024
19 Aug 2024
29 Jul 2024
16 Aug 2024
29 Jul 2024
5 Aug 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.00 Andrud Sheericha mala To Karavewasti Road,Phaltan,Satara (0/000 TO 02/905km) Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (B) In area of thorny jungle | 0.46 | One Hector | 36,243.92 | ₹16,672.2 |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Mord 2014 Clause 201. (A) In area of Non-thorny jungle | 0.7 | One Hector | 29,157.61 | ₹20,410.33 |
| 3 | Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 618.75 | One Cubic Meter | 36.15 | ₹22,367.81 |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lead lifts m as per Technical Specification Clause 202.Rubble Stone Masonry in Cement Mortar, as directed by Engineer in Charge. | 63.77 | One Cubic Meter | 253.36 | ₹16,156.77 |
| 5 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lead lifts m as per Technical Specification Clause 202.Cement Concrete , as directed by Engineer in Charge. | 1.62 | One Cubic Meter | 1,030.09 | ₹1,668.75 |
| 6 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and croun-sections, and transporting to the embankment location with a lift upto 1.5 m and lead above 1000 m as per Technical Specification MORD 2014 Clause 302.3 | 4,619.27 | One Cubic Meter | 81.29 | ₹3,75,500.46 |
| 7 | Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site with a lift upto 1.5 m and lead above 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and croun-sections as per Technical Specification MORD 2014 Clause 302.3.5 | 1,003.8 | One Cubic Meter | 119.44 | ₹1,19,893.57 |
| 8 | Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and croun-sections, loading and disposal of cut rock with a lift upto 1.5 m and with all leads as per Technical Specification MORD 2014 Clause 302.3.5 | 200.76 | One Cubic Meter | 100.05 | ₹20,085.99 |
| 9 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 1,907.22 | One Cubic Meter | 92.25 | ₹1,75,941.05 |
| 10 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting with vibratory roller to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. For Lead Up To 1 KM | 1,223.69 | One Cubic Meter | 651.77 | ₹7,97,564.43 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_1851521.xls
BOQ • 0.60 MB
149193127.pdf
Tender Documents • 0.74 MB
149193129.html
Tender Documents • 0.06 MB
RDSATA255other.rar
Tender Documents • 7.37 MB
SBDRDSATA255.pdf
Tender Documents • 1.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .