Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.3 LAccepted-Finance MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | ₹84.3 L | L1 | Accepted-Finance Quoted Amount is Lowest. Bidder is L1 |
| 2 | L2₹87.5 L+₹3.2 L (3.77%)Rejected-Finance | ₹87.5 L+₹3.2 L (3.77%) | L2 | Rejected-Finance Quoted Amount is not Lowest. Bidder is L2 |
| 3 | L3₹90.7 L+₹6.4 L (7.65%)Rejected-Finance | ₹90.7 L+₹6.4 L (7.65%) | L3 | Rejected-Finance Quoted Amount is not Lowest. Bidder is L3 |
| 4 | Rejected-Technical PURANA BETWA GHAT DISTRICT HAMIRPUR | HAMIRPUR | UTTAR PRADESH | 210301 | - | - | Rejected-Technical Non Responsive Because Experience Certificate Required for New RCC Frame Construction but submitted experience certificate is of maintenance work |
| 5 | Rejected-Technical 233 ANAND NAGAR RATAPUR KANPUR UTTAR PRADESH | KANPUR | KANPUR | UTTAR PRADESH | - | - | Rejected-Technical Non Responsive Because Experience Certificate submitted but not as per requirement) |
| Sl No | Description | Qty | Unit | M/S K M CONSTRUCTION L3 | Anil Kumar L1 | S.D. ENGINEERS CONTRACTORS AND SUPPLIERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 1km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 223.29 | Cum | 101.75 ₹22,719.76 | 103.75 ₹23,166.34 | 70 ₹15,630.3 Lowest |
| 2.00 | Jungle clearance of IH compound including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 20,000 | Sq m | 4.07 ₹81,400 | 4.15 ₹83,000 | 2 ₹40,000 Lowest |
| 3.00 | Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loan clay or sand) including lift upto 1.5 m and lead of 50m with dressing of sides and ramming of bottom sand, disposal of surplus excavated earth including cost of all Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 134.14 | Cum | 70 ₹9,389.8 | 71.38 ₹9,574.91 | 65 ₹8,719.1 Lowest |
| 4.00 | Providing and laying of cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 40 mm nominal size) including cost of mixing, placing and with curing for proper completion of work in foundation and floors. | 7.95 | Cum | 4,650.79 ₹36,973.78 | 4,748.18 ₹37,748.03 | 4,400 ₹34,980 Lowest |
| 5.00 | Making drain along Apron including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 68.65 | RM | 1,005.37 ₹69,018.65 | 1,025.13 ₹70,375.17 | 975 ₹66,933.75 Lowest |
| 6.00 | Providing and injecting chemical for pre-constructional anti-termite treatment and creating chemical barrier under and around the colourn pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding of pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per I.S 6313(part 111981) Aldrine emulsifiable concentrate or any other approved material such as Hepthachlor of Chlordane will be used. The rate of application of chemical emulsion Treatment for masonry and foundation 5 liters per Sq.M. including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 256.43 | Sq m | 105.01 ₹26,927.71 | 107.07 ₹27,455.96 | 70 ₹17,950.1 Lowest |
| 7.00 | Providing and laying in position machanical mixed of 1:1.5:3 ( 1 cement, 1.5 course sand and 3 aggregate) concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. | 77.63 | Cum | 6,417.9 ₹4,98,221.58 | 6,549.53 ₹5,08,440.01 | 5,500 ₹4,26,965 Lowest |
| 8.00 | Class M-150 brick work in 1:4 cement and coarse sand of 1.25 fineness modulus mortar in foundation and plinth super-structure above plinth level including supply of all materials, labour and tools and plants etc. required for proper completion of the work. | 207.05 | Cum | 5,061.7 ₹10,48,024.99 | 5,161.19 ₹10,68,624.39 | 5,000 ₹10,35,250 Lowest |
| 9.00 | Providing and laying of damp proof coarse 25 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand :4 graded stone aggregates 12.5 mm nominal size) and curing complete including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 33.98 | Sq m | 227.92 ₹7,744.72 | 232.4 ₹7,896.95 | 200 ₹6,796 Lowest |
| 10.00 | Providing and applying a coat of residual bitumen of grade of VG- 10 of approved quality using 1.7 kg/sqm on DPC after cleaning the surface with brushes and finally with a piece of cloth lightly soacked in kerosene oil including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 33.98 | Sq m | 75.95 ₹2,580.78 | 77.44 ₹2,631.41 | 70 ₹2,378.6 Lowest |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
20 Aug 2026, 3:00 pmClosed
Superintending Engineer
Superintending Engineer 2nd Circle Irrigation Works Kanpur.
Janpad Fatehpur ke antargat Koda Nirikshan Bhawan ka Nirman Karya
2026_UPIDC_1176370_1
15/S.E.-II/2026-27
Open Tender
Civil Works - Buildings
Item Wise
270 days
District Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,800
₹2.2 L
Kanpur
27 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
20 Aug 2026
12 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 1km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 223.29 | Cum | - | - |
| 2 | Jungle clearance of IH compound including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 20,000 | Sq m | - | - |
| 3 | Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loan clay or sand) including lift upto 1.5 m and lead of 50m with dressing of sides and ramming of bottom sand, disposal of surplus excavated earth including cost of all Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 134.14 | Cum | - | - |
| 4 | Providing and laying of cement concrete 1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 40 mm nominal size) including cost of mixing, placing and with curing for proper completion of work in foundation and floors. | 7.95 | Cum | - | - |
| 5 | Making drain along Apron including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 68.65 | RM | - | - |
| 6 | Providing and injecting chemical for pre-constructional anti-termite treatment and creating chemical barrier under and around the colourn pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the external per meter of binding expansion joints surrounding of pipes and conduit etc. complete (plinth area of the building at ground floor only shall be measured as per I.S 6313(part 111981) Aldrine emulsifiable concentrate or any other approved material such as Hepthachlor of Chlordane will be used. The rate of application of chemical emulsion Treatment for masonry and foundation 5 liters per Sq.M. including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 256.43 | Sq m | - | - |
| 7 | Providing and laying in position machanical mixed of 1:1.5:3 ( 1 cement, 1.5 course sand and 3 aggregate) concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. | 77.63 | Cum | - | - |
| 8 | Class M-150 brick work in 1:4 cement and coarse sand of 1.25 fineness modulus mortar in foundation and plinth super-structure above plinth level including supply of all materials, labour and tools and plants etc. required for proper completion of the work. | 207.05 | Cum | - | - |
| 9 | Providing and laying of damp proof coarse 25 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand :4 graded stone aggregates 12.5 mm nominal size) and curing complete including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 33.98 | Sq m | - | - |
| 10 | Providing and applying a coat of residual bitumen of grade of VG- 10 of approved quality using 1.7 kg/sqm on DPC after cleaning the surface with brushes and finally with a piece of cloth lightly soacked in kerosene oil including cost of all material, Labour, T&P etc required for proper completion of Work as per ID specification & as per direction of Engineer in Charge. | 33.98 | Sq m | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
BOQ_2210625.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .