Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LQualified Make: PROSTARM
Model: CH2KS B9 8 AIR INDIA COLONY SAHYADRI CHS SECTOR 27 NEAR WONDERS PARK NAVI MUMBAI THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | Make: PROSTARM
Model: CH2KS | L1 | Qualified | |
| 2 | L2₹1.0 L+₹188 (0.19%)Qualified Make: NUMAX
Model: DOU2K 50 51 NARAYANASWAMY NAGAR CHERLAPALLY CHERLAPALLY HYDERABAD HYDERABAD TELANGANA 500051 | MEDCHAL MALKAJGIRI | TELANGANA | 500051 | Make: NUMAX
Model: DOU2K | L2 | Qualified MSE, Category: General | |
| 3 | L3₹1.0 L+₹2,308 (2.31%)Qualified Make: NUMAX
Model: DOU2K 11 54 MAHAMANAPURI EXT ADITYANAGAR ADITYANAGAR VARANASI UTTAR PRADESH 221005 UDYAM UP 75 0040200 | VARANASI | UTTAR PRADESH | 221005 | Make: NUMAX
Model: DOU2K | L3 | Qualified | |
| 4 | L4₹1.2 L+₹19,508 (19.5%)Qualified Make: Techser
Model: TECHGLARE 2000 12 1 TECHSER HOUSE JALAHALLI MES RING ROAD SHARADAMBANAGAR BENGALURU BANGALORE KARNATAKA 560013 | BENGALURU URBAN | KARNATAKA | 560013 | Make: Techser
Model: TECHGLARE 2000 | L4 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
3 Dec 2025, 2:00 pmClosed
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6853316 Dated : 21-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8545453
GEM/2025/B/6853316
Two Packet Bid
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
60 days
K Chowdary507116STORES UNIT, HWP MANUGURU, P.O. GAUTAMINAGAR, ASWAPURAM, KHAMMAM
Total value wise evaluation
PRODUCT
1 document required · 1 mandatory
Exempted
21 Nov 2025
21 Nov 2025
3 Dec 2025
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6853316 Dated : 21-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8545453.pdf
GEM_BID
XII_ad3146ac-932d-417d-98d31762232459959_aporpum.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .