| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.2 LAccepted-AOC | ₹33.2 L | 1 | Accepted-AOC As per TC recommendation, L1 bidder. |
| 2 | 2₹33.6 L+₹41,491.33 (1.25%)Rejected-Finance JME COLONY SHAKTINAGAR DIST SONEBHADRA UP | SHAKTINAGAR | SONEBHADRA | UTTAR PRADESH | ₹33.6 L+₹41,491.33 (1.25%) | 2 | Rejected-Finance As per TC Recommendation |
| 3 | 3₹34.1 L+₹90,335.56 (2.72%)Rejected-Finance VILL BASI PO BINA DISTT SONEBHADRA UP 231220 | BINA | SONEBHADRA | UTTAR PRADESH | 231220 | ₹34.1 L+₹90,335.56 (2.72%) | 3 | Rejected-Finance As per TC Recommendation |
| 4 | 4₹38.5 L+₹5.3 L (15.9%)Rejected-Finance | ₹38.5 L+₹5.3 L (15.9%) | 4 | Rejected-Finance As per TC Recommendation |
Tender Value
₹52.5 L
EMD Value
₹65,700
Closing Date
13 Apr 2026, 10:00 amClosed
Area staff officer
Office of AGM krishanshila Area, PO- Bina, Anapara Dist. Sonebhdra
Renovation along with providing parking shed of union bank at Krishanshila Project.
2026_NCL_357628_1
KSL/Civil/Tender/2025-26/ETN- 23 Dated. 27.03.2026
Open Tender
Civil Works - Buildings
Percentage
150 days
Krishnashila Area
As per NIT
6 documents required · 6 mandatory
₹65,700
12 Aug 2026
27 Mar 2026
14 Apr 2026
27 Mar 2026
13 Apr 2026
28 Mar 2026
28 Mar 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 20 | Cum | 1,130.7 | ₹22,614 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 30 | Cum | 1,337.3 | ₹40,119 |
| 3 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 60 | Sqm | 41.45 | ₹2,487 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 58 | Cum | 206.7 | ₹11,988.6 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 42 | Cum | 5,402.95 | ₹2,26,923.9 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | - | Kg | 115.05 | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 6,908.3 | - |
| 8 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) | - | Cum | 8,147.5 | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | - | Cum | 8,482.4 | - |
| 10 | Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates,
anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate
20 mm nominal size derived from natural sources). | 0.5 | Cum | 7,876.45 | ₹3,938.23 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_370490.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .