| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAdmitted-Finance NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | ₹24.9 L | L1 | Admitted-Finance |
| 2 | L2₹25.1 LAdmitted-Finance NO 32 BAJANAI KOIL STREET PUDUPADI POST KILAMBADI VILLAGE ARCOT | ARCOT | RANIPET | TAMIL NADU | ₹25.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S RK CONSTRUCTIONS L2 | MPANDCO L1 |
|---|---|---|---|---|---|
| 1.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 20 | 1 Cubic Meter | 4,150 ₹83,000 | 4,132 ₹82,640 |
| 2.00 | Providing and laying tack coat of 2.5 kgs/10 sqm over the BT surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 2,262 | 1 Squre Meter | 20 ₹45,240 | 20.09 ₹45,443.58 |
| 3.00 | Providing and laying 50 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0..25 cum of 13.20 - 2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20Kgs of VG30 / VG40 bitumen for pre-mixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50 mm with paver to the specified grade sand crosssections and compacted by Vibratory / Pneumatic Roller to the required densityetc., including labour for attending to paveratsiteetc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paverfinisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP asperclause 505 MORTH Rev-5. | 113.6 | 1 Cubic Meter | 10,500 ₹11,92,800 | 10,398 ₹11,81,212.8 |
| 4.00 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 67.96 | 1 Cubic Meter | 10,937.5 ₹7,43,312.5 | 10,937.4 ₹7,43,305.7 |
| 5.00 | Raising the Manhole Covers using PCC 1:1.5:3 Mix using 20 mm ISS size HBG Metal with 1.5 necessary centering arrangement including cost and Conveyance of all materials and labour charges etc all complete as per standard specification | 15 | 1 Numbers | 4,200 ₹63,000 | 3,800 ₹57,000 |
| 6.00 | GST 18% | 1 | L.S | 3,82,923.45 ₹3,82,923.45 | 3,79,728.37 ₹3,79,728.37 |
Tender Value
₹25.4 L
EMD Value
₹25,400
Closing Date
13 Mar 2026, 3:00 pmClosed
THE COMMISSIONER ARAKKONAM MUNICIPALITY
110 GANDHI ROAD ARAKKONAM
Relaying of BT Surface Road at Anna Street Extension (024001R004) and Nehruji Nagar 4th St 2nd Cross Street (024005R152), at Ward No. 01,03,05,in Arakkonam Municipality
2026_MAWS_673522_1
864-2024-e1-8
Open Tender
Civil Works - Roads
ARAKKONAM MUNICIPALITY
-
3 documents required · 3 mandatory
₹0
₹25,400
Yes
1 Jul 2026
11 Mar 2026
13 Mar 2026
11 Mar 2026
13 Mar 2026
11 Mar 2026
11 Mar 2026 - 13 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 20 | 1 Cubic Meter | - | - |
| 2 | Providing and laying tack coat of 2.5 kgs/10 sqm over the BT surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Specifications | 2,262 | 1 Squre Meter | - | - |
| 3 | Providing and laying 50 mm consolidated thick Dense Bituminous Macadam using 0.24 cum of 26.50-13.20mm, 0..25 cum of 13.20 - 2.36 mm and 0.23 cum of 2.36 mm & below and with 53.20Kgs of VG30 / VG40 bitumen for pre-mixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50 mm with paver to the specified grade sand crosssections and compacted by Vibratory / Pneumatic Roller to the required densityetc., including labour for attending to paveratsiteetc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paverfinisher, Vibratory/ Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP asperclause 505 MORTH Rev-5. | 113.6 | 1 Cubic Meter | - | - |
| 4 | Providing and laying Bituminous concrete to 40mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications. | 67.96 | 1 Cubic Meter | - | - |
| 5 | Raising the Manhole Covers using PCC 1:1.5:3 Mix using 20 mm ISS size HBG Metal with 1.5 necessary centering arrangement including cost and Conveyance of all materials and labour charges etc all complete as per standard specification | 15 | 1 Numbers | - | - |
| 6 | GST 18% | - | L.S | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_809512.xls
BOQ • 0.36 MB
BID8.pdf
Tender Documents • 0.83 MB
Download all tender documents and submit your bid