Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-AOC | L1 | Accepted-AOC Quoted rate stands lowest | |
| 2 | L2₹14.5 L+₹86,893 (6.39%)Rejected-Finance | L2 | Rejected-Finance Quoted rate higher than L1 | |
| 3 | L3₹14.9 L+₹1.3 L (9.33%)Rejected-Finance ARABINDA NAGAR ALIPURDUAR | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736122 | L3 | Rejected-Finance Quoted rate higher than L1 and L2 | |
| 4 | L4₹16.5 L+₹2.9 L (21.6%)Rejected-Finance | L4 | Rejected-Finance Quoted rate higher than L1 L2 and L3 | |
| 5 | L5₹16.8 L+₹3.2 L (23.8%)Rejected-Finance | L5 | Rejected-Finance Quoted rate higher than L1 L2 L3 and L4 |
Tender Value
₹22.7 L
EMD Value
₹45,493
Closing Date
27 May 2020, 5:30 pmClosed
Executive Engineer Alipurduar Irrigation Division
O/o the Executive Engineer Alipurduar Irrigation Division, College Halt, Alipurduar
Protection work by HDPE bags at Khokla bosty area adjacent the Dumping Yard Himalitoll and Gorkha Bhawan for the length of 576 meter along the right bank of river Gaburjyoti in Block Kalchini and PS Jaigaon Dist Alipurduar
2020_IWD_282703_3
WBIW/EE/APD/e-NIT02(e)/20-21
Open Tender
CIVIL WORKS
Percentage
15 days
KhoklabostyBlockKalchiniJaigaonAlipurduar
Please refer Tender documents.
6 documents required · 6 mandatory
₹45,493
Yes
10 Sept 2020
12 May 2020
28 May 2020
12 May 2020
27 May 2020
12 May 2020
eProcurement System of Government of West Bengal Created By: PRIYAM GOSWAMI Created Date/Time: 03-Jun-2020 05:36 PM Tender Title: WBIW/EE/APD/e-NIT02(e)/20-21 Sl03 Tender ID: 2020_IWD_282703_3
Tender Inviting Authority: Executive Engineer Alipurduar Irrigation Division, Irrigation & Waterways Directorate
Name of Work: Protection work by HDPE bags at Khokla bosty area adjacent the Dumping Yard, Himalitoll and Gorkha Bhawan for the length of 576 meter along the right bank of river Gaburjyoti in Block - Kalchini, & P.S.- Jaigaon, Dist.- Alipurduar.
Contract No: e-NIT No: WBIW/EE/APD/e-NIT-02(e)/2020-21 (Sl-03)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 DEY CONSTRUCTION AND CO. 2274672.30 -26.00 1683257.00 Sixteen Lakh Eighty Three Thousand Two Hundred and Fifty Seven
2.00 CHINMOY BHATTACHERJEE 2274672.30 -19.33 1834978.00 Eighteen Lakh Thirty Four Thousand Nine Hundred and Seventy Eight
3.00 BABUN RAKSHIT 2274672.30 -40.21 1360026.00 Thirteen Lakh Sixty Thousand Twenty Six
4.00 M/S BASU CONSTRUCTION AND CO 2274672.30 -34.63 1486953.00 Fourteen Lakh Eighty Six Thousand Nine Hundred and Fifty Three
5.00 MRIDUL BASAK 2274672.30 -27.28 1654141.00 Sixteen Lakh Fifty Four Thousand One Hundred and Fourty One
6.00 DIPANKAR MITRA AND COMPANY 2274672.30 -36.39 1446919.00 Fourteen Lakh Fourty Six Thousand Nine Hundred and Ninteen
7.00 PARITOSH GHOSH 2274672.30 -19.99 1819965.00 Eighteen Lakh Ninteen Thousand Nine Hundred and Sixty Five
Lowest Amount Quoted BY: BABUN RAKSHIT(1360026.00)
BOQ Summary Details Tender Title: WBIW/EE/APD/e-NIT02(e)/20-21 Sl03 Tender ID: 2020_IWD_282703_3
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 BABUN RAKSHIT 1360026.00 L1
2 DIPANKAR MITRA AND COMPANY 1446919.00 L2
3 M/S BASU CONSTRUCTION AND CO 1486953.00 L3
4 MRIDUL BASAK 1654141.00 L4
5 DEY CONSTRUCTION AND CO. 1683257.00 L5
6 PARITOSH GHOSH 1819965.00 L6
7 CHINMOY BHATTACHERJEE 1834978.00 L7
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .