| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.7 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹13.1 Cr+₹38.4 L (3.03%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹13.1 Cr+₹44.3 L (3.50%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹13.1 Cr+₹44.7 L (3.53%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹13.7 Cr+₹1.0 Cr (8.18%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹19.0 Cr
EMD Value
₹38.1 L
Closing Date
17 Oct 2025, 4:00 pmClosed
ER R K Gupta
Office of the Chief Engineer PWD R and B Department Jammu Zone Lok Nirman Bhawan Rail Head Complex Jammu
Refer to BOQ
2025_PWDJK_290727_1
e-NIT No.14 of 2025-26 Dated 04.10.2025
Open Tender
Civil Works
Percentage
730 days
PWD Lok Nirman Bhawan
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Chief Accounts Officer PWD R and B Jammu Zone
₹38.1 L
PWD Lok Nirman Bhawan
3 Nov 2025
4 Oct 2025
18 Oct 2025
4 Oct 2025
17 Oct 2025
4 Oct 2025
13 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalitites not exceeding 15cm deep and disposal of rubbish, lead upto 50 and lift upto 1.5m in all kind of soil. | 21.08 | / 100 SQM | 2,412 | ₹50,840.01 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge in all kind of soil. | 11,671.91 | CUM | 187.3 | ₹21,86,148.38 |
| 3 | Extra for every additional lift of 1.5 M or part therefore in all kinds of soil. | 6,103.96 | CUM | 89.75 | ₹5,47,830.51 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate) 40mm nominal size crushed. | 336.04 | CUM | 5,202.9 | ₹17,48,372.63 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 295.44 | CUM | 5,733.6 | ₹16,93,938.13 |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as perapproved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All works upto plinth level. | 1,254.72 | CUM | 8,021.1 | ₹1,00,64,235.25 |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as perapproved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge.All works above plinth level upto floor V level. | 1,185.28 | CUM | 9,412.05 | ₹1,11,55,956.41 |
| 8 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete TMT bars.((Thermo-Mechanically Treated bars of grade Fe-500D or more.)) | 4,47,879.39 | KG | 123.2 | ₹5,51,78,740.42 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for :- | - | - | - | - |
| 10 | Foundations, footings, bases of columns etc. For mass concrete. | 886.56 | SQM | 286.35 | ₹2,53,865.18 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
2.46 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_932925.xls
BOQ • 0.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .