| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAdmitted-Finance | ₹39.1 L | L1 | Admitted-Finance |
| 2 | L2₹40.7 LAdmitted-Finance | ₹40.7 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Work Experience certificate not enclosed as per NIT |
| Sl No | Description | Qty | Unit | Astonish Engineering And Marketing L2 | Shivalik Engineering and Marketing L1 |
|---|---|---|---|---|---|
| 1.00WTP Hingna | |||||
| 1.01 | Calibration & testing of 25 mm Master flowmeters @ CWPRS Pune /IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI Mumbai , installation, dismantling , Testing at CWPRS/IDEMI and re-transportation to site etc complete | 2 | Nos | 55,000 ₹1,10,000 | 54,000 ₹1,08,000 Lowest |
| 1.02 | Calibration & testing of 80 mm Master flowmeters @ CWPRS Pune / IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI
Mumbai, installation, dismantling ,Testing at
CWPRS / IDEMI and re transportation to site etc
complete. | 2 | Nos | 72,000 ₹1,44,000 Lowest | 72,000 ₹1,44,000 Lowest |
| 1.03 | Calibration & testing of 150 mm Master flowmeters @ CWPRS Pune / IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI Mumbai, installation, dismantling ,Testing at CWPRS/IDEMI and re transportation to site etc complete. | 2 | Nos | 90,000 ₹1,80,000 | 81,000 ₹1,62,000 Lowest |
| 1.04 | Comprehensive annual maintenance of 25 mm Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | 2 | Nos | 60,000 ₹1,20,000 Lowest | 60,000 ₹1,20,000 Lowest |
| 1.05 | Comprehensive annual maintenance of 80 mm Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | 2 | Nos | 80,000 ₹1,60,000 Lowest | 80,000 ₹1,60,000 Lowest |
| 1.06 | Comprehensive annual maintenance of 150 mm
Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all
parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | 2 | Nos | 1,15,000 ₹2,30,000 | 1,05,000 ₹2,10,000 Lowest |
| 1.07 | Supply of 150mm Electromagnetic Flowmeter as
spare Master Meter with CWPRS / IDEMICalibration | 1 | Nos | 3,46,000 ₹3,46,000 Lowest | 3,48,000 ₹3,48,000 |
| 1.08 | Supplying, and installing of Manual Scissor Table of 500 Kg Capacity with platform Size of 500mm (W) x 900mm (L) and Maximum Height of 1500
mm, foot pump operated with PU Wheels, etc complete. | 1 | Nos | 85,000 ₹85,000 | 80,850 ₹80,850 Lowest |
| 1.09 | Comprehensive annual maintenance of testing facility during first and second year for each quarter, quarterly visit to site for checking / inspection of normal operation of all devices, piping, valves, vessels etc. operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material such as Rubber Gaskets , O‘rings, Nuts bolts Valves and any other required spares, labour, necessary spares, travel charges etc complete | 8 | Nos | 48,000 ₹3,84,000 | 45,000 ₹3,60,000 Lowest |
Tender Value
₹39.1 L
EMD Value
₹39,200
Closing Date
20 Aug 2026, 11:00 amClosed
Chief Engineer MIDC Nagpur
Chief Engineer MIDC Nagpur
DG HINGNA INDUSTRIAL AREA M and R to Hingna and Amravati PWSS Annual Maintenance of meter testing facility at WTP Hingna and ESR Sump Amravati
2026_MIDC_1327255_1
Tender Notice 5 of 2026-2027
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
Hingna Indl Area
As per Tender Document
2 documents required · 2 mandatory
₹10,030
₹39,200
25 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
14 Aug 2026
12 Aug 2026 - 14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WTP Hingna | |||||
| 1.01 | Calibration & testing of 25 mm Master flowmeters @ CWPRS Pune /IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI Mumbai , installation, dismantling , Testing at CWPRS/IDEMI and re-transportation to site etc complete | - | Nos | 54,000 | - |
| 1.02 | Calibration & testing of 80 mm Master flowmeters @ CWPRS Pune / IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI
Mumbai, installation, dismantling ,Testing at
CWPRS / IDEMI and re transportation to site etc
complete. | - | Nos | 72,000 | - |
| 1.03 | Calibration & testing of 150 mm Master flowmeters @ CWPRS Pune / IDEMI Mumbai including transportation from site to CWPRS Pune / IDEMI Mumbai, installation, dismantling ,Testing at CWPRS/IDEMI and re transportation to site etc complete. | - | Nos | 81,000 | - |
| 1.04 | Comprehensive annual maintenance of 25 mm Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | - | Nos | 60,000 | - |
| 1.05 | Comprehensive annual maintenance of 80 mm Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | - | Nos | 80,000 | - |
| 1.06 | Comprehensive annual maintenance of 150 mm
Electro- Magnetic flowmeter during first and second year for each quarter, quarterly visit for checking / inspection of normal operation for all
parameters, carrying out all necessary repairs cropped up during this quarter, including all material,labour, necessary spares, travel charges,etc complete | - | Nos | 1,05,000 | - |
| 1.07 | Supply of 150mm Electromagnetic Flowmeter as
spare Master Meter with CWPRS / IDEMICalibration | - | Nos | 3,48,000 | - |
| 1.08 | Supplying, and installing of Manual Scissor Table of 500 Kg Capacity with platform Size of 500mm (W) x 900mm (L) and Maximum Height of 1500
mm, foot pump operated with PU Wheels, etc complete. | - | Nos | 80,900 | - |
| 1.09 | Comprehensive annual maintenance of testing facility during first and second year for each quarter, quarterly visit to site for checking / inspection of normal operation of all devices, piping, valves, vessels etc. operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material such as Rubber Gaskets , O‘rings, Nuts bolts Valves and any other required spares, labour, necessary spares, travel charges etc complete | - | Nos | 45,000 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
itemspecifi.pdf
Other Document • 0.03 MB
tenderdocu.pdf
Tender Documents • 0.25 MB
BOQ_2272861.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].