All Bids
RequiredValid civil contract registration as per GOMs.No.66, I & CAD (Reforms) Deptt, dt. 20-04-2015
RequiredEMD Payment proof document / details
RequiredTransaction fee details
RequiredCopy of GST Registration
OptionalCopy of GST clearance
RequiredSelf declaration in the given format
RequiredInformation of litigation history in the given format
RequiredBid capacity calculation sheet in the given format
RequiredCopy of PAN card
RequiredInformation on existing commitments in the prescribed format (Please refer SBD), the contractor shall submit the information invariably failing which the tender will be rejected
RequiredQualification certificates of technical personal 1 Graduate Civil and 1 Diploma civil engineers
Requiredhe processing fee for the work is Rs.4000.00. The bidder shall remit the fee through online (SBI ZPP A/c No.37342596656 IFSC Code SBIN0020780) and a copy of the remittance slip shall be uploaded
RequiredProof of liquid assets in the shape of solvency certificate for the required amount Rs.54.69 Lakhs not earlier than One Year , should be in the prescribed Proforma ( as uploaded along with this NIT) as per GOMs.No.94 I & CADD (PW-COD), dt. 01- 07-2003. Other formats & conditional formats are not considered for evaluation
RequiredLatest Indian Income Tax acknowledgement proof for the assessment year 2025-26
RequiredKey and Critical equipment document proof (owned/leased) i.e., Machinery Self Declaration shall be in the given format and also submit on Rs.100.00 Non judicial stamp paper, the Name of the work shall invariably mentioned. Other format are not accepted for evaluation
RequiredSelf declaration of the bidder on ownership or lease of drum type hot mix plant 40-60 TPH (within 70km distance from workspot)/batch type hot mix plant (100-120 TPH within 100 kms distance from work spot) on Rs.100.00 non judicial stamp paper along with location & ownership details of the plant.
RequiredIf the machinery and HMP are owned the ownership certificate of the contractor or leased , the lease agreement along with ownership certificate issued by EE of the lessor shall be uploaded invariably
RequiredAnnual Turn over certificate certified by CA with a block period of 5 years with break up of civil engineering turn over or Experience certificate of civil engineering works completed by the contractor within a block period of 5 years 2021-22 to 2025-26.