Loading…
Loading…
Tender Value
₹7.4 Cr
EMD Value
₹14.8 L
Closing Date
1 Oct 2026, 6:00 pm
Sr Mgr EE, Agra Airport
Office of GM Engg , Agra Project , Dhanauli
Dismantling, shifting, Reinstallation, Testing and Commissioning including refurbishment of PBBs at Agra Airport and its Operation and AICMC
2026_AAI_290482_1
AAI/NR/Engg(E)/Agra/PBB/26-27
Open Tender
Electrical Works
Item Rate
90 days
Agra Airport Dhanauli
As per Tender Document
15 documents required · 15 mandatory
₹1,180
₹14.8 L
11 Sept 2026
11 Sept 2026
6 Oct 2026
11 Sept 2026
1 Oct 2026
11 Sept 2026
11 Sept 2026 - 18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SH-I: Dismantling, Shifting, Re-installation with refurbishment | |||||
| 1.01 | Dismantling of 03 Nos existing PT Bukaka make Passenger Boarding Bridges complete unit including UPS, batteries , rotunda , AC units , panel ( Type: B3-18/36- Qty-02 Nos, B3-19/37-Qty-01 Nos) at Vizag Airport etc complete as required. | 1 | Job | 1.25 | ₹1.25 |
| 1.02 | Shifting / Transportation of 03 Nos dismantled PT Bukaka make Passenger Boarding Bridge complete unit including UPS, batteries , rotunda , AC units , panel ( Type: B3-18/36- Qty-02 Nos, B3-19/37-Qty-01 Nos) from Vizag Airport to Agra Airport including packing, insurance of complete material etc complete as required. | 1 | Job | - | - |
| 1.03 | Reinstallation, testing and commissioning of complete unit of PBB at Agra Airport along with rotunda foundation work and SITC of anchor bolts etc complete as required. | 3 | Job | 100 | ₹300 |
| 1.04 | Refurbishment work required in PBB unit including replacement of 4 Ton capacity rotunda AC unit, floor mats with beading, canopy without frame, all lights, bay signages, step ladder door hinges, auto leveller, sensors, door closer and minor roofing works required to avoid leakage during rain, gaskets, rain guards, re-wiring of distribution & operator panel as required, software updation, painting of all parts of PBB, oiling & greasing etc complete as required | 3 | Job | 53 | ₹159 |
| 1.05 | Replacement of existing 20KVA online UPS and 12V, 42AH batteries 32 Nos Complete etc as required | 1 | Job | 10 | ₹10 |
| 2Annual Operation and routine maintenance of complete PBB systems as mentioned under SH:I in 01 shift of 08 hrs by providing requisite man-power, tools, equipments, consumables and technical support etc. during operations as specified in SCC, Technical Specification and particular specifications of operation & AICMC with complete in all respect. | |||||
| 2.01 | Year 1 (During DLP) | 1 | Job | 10 | ₹10 |
| 2.02 | Year 2 (1st Year after DLP) | 1 | Job | 22 | ₹22 |
| 2.03 | Year 3 (2nd Year after DLP) | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
tenderdocument.pdf
Tender Documents • 15.99 MB
BOQ_338917.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .