Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
31 Dec 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
HQ CWE MEERUT
29J The Mall Road Meerut Cantt Uttar Pradesh 250001
REPAIR/MODIFICATION OF ELECTRIC ELECTRIFICATION SYSTEM NETWORK FOR IMPROVEMENT INCL ALLIED SYSTEM AT GE (U) MEERUT CANTT
2025_MES_735043_2
94278/MRT/2025-26/E8
Open Tender
Civil Works
Item Rate
120 days
MEERUT CANTT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GE (U) MEERUT
₹96,000
Yes
9 Dec 2025
9 Dec 2025
5 Jan 2026
9 Dec 2025
31 Dec 2025
17 Dec 2025
Homogenous Mixture of naturally occurring highly conductive element compounds that enhances the effectiveness of the earthling to a great extent especially in the area of poor conductivity to be placed around the earth electrode in the pit to improve the conductivity of earth electrode and ground conduct area. Each earth must have hygroscopic in nature thereby retaining moisture around earth electrode during dry seasons. It is nontoxic, non-explosive, non-reactive, noncorrosive, and thermally stable and swells considerably. Earth Pit Chambers are made of Heavy Duty Polyethylene/Polyplastic material.
chain Time payload 1 min, 5 min, 15 min configurable remotely with real-time anomaly detection Technical details Real-time KW, KVA, KVAR, phase-wise, consumption KWh, KWh, KVarh, KVAh, PF, phase-wise PF, Hz, I, Ig, In, VLL (phase wise), VLN (phase wise), Vn, Vg, harmonics, voltage and current unbalance User Interface The cloud-based facility management system should enable controlling substations and facilities. The system should support adding more parameters in future with minimal changes. AF should have a mechanism to proactively know when some equipment is not giving data / has errors without coming to site. User interface should be remotely accessible on internet, with secure login credentials. User interface should work on secure https. Communication between data gathering, and data storage should be over a secure encrypted channel. IIOT controller must have inbuild local control capability to operate in case of network unavailability. However, control logics must be configurable remotely. The user-interface should have minimum of following tabs (all dashboards, reports must be self-configurable without any scripting or OEM intervention): Dashboard - To evaluate captured parameters at a glance with current, hourly, daily, weekly, monthly, & yearly. End-user should be able to create Dashboards on their own, without AF involvement. End user should be able to define number of rows / columns in dashboard, merge cells of dashboard to make some areas small / large, configure row heights to provide flexibility in how data is displayed (ex. multiple numerical KPIs in a smaller row, and graphs in a larger row to utilize displayed area of dashboard optimally)
data in charts / dashboard comparing against these benchmarks System should support saving frequently used analytics charts for later users. All saved charts should be available to choose with a single-click. System should support showing analy
tics data in graphical and tabular form. Facility to export data over a custom time interval to Excel shall be available. Reports should be user-defined and not fixed (hardcoded into the system). System should support sending daily, weekly and monthly reports. Daily reports should be sent next day morning over email incorporating all data from previous day. There should be a mechanism to turn reporting sending of scheduled reports ON/OFF There should be a mechanism to send a pre-created report on-demand (and not just as scheduled daily / weekly / monthly report) Settings - To view the metadata related to the system, such as the site name and installation date, details of equipment at site etc. Alarms and event logs – Alarm should Issue a system update that the system has detected. Passwords should be stored in encrypted format. Website should be accessible on all platforms and be compatible with popular browsers such as IE, Chrome, Firefox, Safari etc. Online Administration: All administration is handled online via a current web browser Audit Trail: Administrators can access logs in the backend on need-basis where they can view changes that have been made to the database for critical information. Data Backup
Dismantling of old u/s fuse units & replacement with new H.R.C. Cartridge fuse 5 Amp to 10 Amp Su
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TD1.pdf
Tender Documents • 0.39 MB
TD2.pdf
Tender Documents • 0.21 MB
TD3.pdf
Tender Documents • 0.24 MB
TD4.pdf
Tender Documents • 0.57 MB
BOQ_832835.xls
BOQ • 3.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .