Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical VIII NALHATI MISSION PARA WARD 07 P O P S NALHATI DIST BIRBHUM PIN 732143 | 732143 | Admitted-Fee/PreQual/Technical |
Tender Value
₹7.5 L
EMD Value
₹15,039
Closing Date
23 Sept 2026, 2:00 pmClosed
EXECUTIVE ENGINEER-II BIRBHUM DIVISION PWD
SURI
As Per NIeT Sl-2
2026_WBPWD_5022789_2
WBPWD/EE/BIR/NIeT-14/2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
Rampurhat
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,039
Yes
25 Sept 2026
8 Sept 2026
25 Sept 2026
8 Sept 2026
23 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including
stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 4 | m3 | 3,551.25 | ₹14,205 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 24.83 | m3 | 177.5 | ₹4,407.33 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 12.49 | m2 | 2,123.75 | ₹26,525.64 |
| 4 | Separation Membrane of impermeable plastic sheeting 125 micron
thick | 93.46 | m2 | 15 | ₹1,401.9 |
| 5 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.36 | m3 | 7,294.7 | ₹68,278.39 |
| 6 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.54 | m3 | 8,340.85 | ₹2,13,025.31 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 44.2 | m2 | 961.3 | ₹42,489.46 |
| 7.01 | Lintels, beams, plinth beams, girders, bressumers and
cantilevers | 37.55 | m2 | 736.4 | ₹27,651.82 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level. 5.22A.1 Mild steel and Medium Tensile steel bars | 2,004.89 | kg | 107.1 | ₹2,14,723.72 |
| 9 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 1.58 | m3 | 9,105.95 | ₹14,387.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 1.05 MB
BOQ_5104984.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .