| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹52,107 (0.32%)Admitted-Finance | ₹1.6 Cr+₹52,107 (0.32%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SURYA ELECTRICALS L1 | Shiva Electricals Company L2 |
|---|---|---|---|---|---|
| 1.00Safe loading, carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of ESD Aligarh to dump site proper stacking. | |||||
| 1.01 | ST Pole 13 Mtr long | 260 | No. | 800 ₹2,08,000 Lowest | 810 ₹2,10,600 |
| 1.02 | Earthing complete | 260 | No. | 25 ₹6,500 | 22 ₹5,720 Lowest |
| 1.03 | Stay complete | 154 | No. | 25 ₹3,850 | 20 ₹3,080 Lowest |
| 1.04 | 33 KV XLPE Cable 3x300 sq.mm. (for underground) | 4,580 | Mtr | 45 ₹2,06,100 | 40 ₹1,83,200 Lowest |
| 1.05 | ACSR Dog Conductor | 24,500 | Mtr | 6 ₹1,47,000 | 5 ₹1,22,500 Lowest |
| 1.06 | 33 KV Pin Insulator with pin | 714 | No. | 20 ₹14,280 Lowest | 25 ₹17,850 |
| 1.07 | 33KV Disc Fitting | 120 | No. | 25 ₹3,000 Lowest | 25 ₹3,000 Lowest |
| 1.08 | 33KV Disc Insulator 70KN | 480 | No. | 30 ₹14,400 Lowest | 32 ₹15,360 |
| 1.09 | 33 KV PG Clamp | 228 | No. | 10 ₹2,280 Lowest | 15 ₹3,420 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
11 Mar 2024, 6:00 pmClosed
SE EUDC ALIGARH
LAL DIGGI ALIGARH
CONSTRUCTION OF 33 KV LINE SASNI GATE ALIGARH
2024_DVVNL_880038_3
EUDCA-63/2023-24
Open Tender
Electrical Works
Turn-key
90 days
EUDD-1 ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
DVVNL
₹1.8 L
16 Mar 2024
6 Mar 2024
12 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
Amount
Safe loading, carriage and then safe unloading of the following material from Store Centres Under the jurisdiction of ESD Aligarh to dump site proper stacking.
ST Pole 13 Mtr long
Earthing complete
Stay complete
33 KV XLPE Cable 3x300 sq.mm. (for underground)
ACSR Dog Conductor
33 KV Pin Insulator with pin
33KV Disc Fitting
33KV Disc Insulator 70KN
33 KV PG Clamp
GI Wire 6 swg
GI Wire 10 swg
33 KV Line Isolator
Supply of following of material :
HDPE , PN-6 Pipe (200mm. Dia) with Clamps etc.
33 KV cable Jointing Kit 3x300sq.mm. (outdoor)
Stone Pad
33 kV F- Bracket
33 kV V Type Cross Arm
Top Channel size 125x65x2240 mm.
Dropper Channel size 100x50x2028 mm.
Tee off Chennal size 125x65x1300 mm.
Cross Bracing Angle MS Angle Iron (65x65x6, 4300mm.)
Cross Arm Holding Clamp
Gaurding Angle
Pole Clamp with bolt & nut
Barbed wire
Danger Board with Clamp
Nut Bolt & Washer
Number Plate with clamp
Alluminum Paint
Red Oxide Paint
Alluminum Binding Wire
I Bolt
Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection of Single Pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 1 no Channel Cross Arm/ F-Braket, 3 No. Pin insulator as per norms.
Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Sectional Double pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 1 No Top channel of 125x65x6 mm size 3200 mm, 6 No. Disc. Fitting , Bracing angle 1 set., Disc insulator 6 No. and 3 No. Pin insulator as per norms.
Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Exposure Double pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 3 No Top channel of 125x65x6 mm size 3200 mm, Bracing angle 1 set., and 9 No. Pin insulator as per norms.
Safe Dragging/ Loading - unloading from dump site to pit site and Fabrication & erection for Four pole for 33 KV Line on 13.0 Mtr S.T. Pole with fitting of necessary clamp & other acessories like 4 No Top channel of 125x65x6 mm size 3200 mm, 4 set Bracing angle, 8 No. Pin insulator, 24 No. Disc Insulator, 06 No. Disc Fitting and 08 No. E-Braket as per norms.
Grouting of 13 Mtr. ST Pole by digging of pit 1.83 Mtr deep, placing stone pad at bottom 450x450 size foundation is provided with help of steel or wooden formers, groutung with 1:4:8 Ratio cement, sand & first class brick ballast 0.268/0.285 cu mtr for 9.0 mtr PCC Pole & 11 mtr STP, plinthing 0.3 Mtr above G/L and proper plastering.
Cradle Guarding of 33 KV line at road crossing, 11 KV line crossing, canal/telephone line crossing by fixing Guarding Angle 65x65x6 mm, 3500 mm at double pole and 2600 mm long at single pole by stringing and sagging of 3 No. G.I.wire with lacing and tightening with mounting.
Nozeling and grouting of stay at sectional pole and extra stay sets at angle locations (All the civil material will be arranged by the contractor )
Earthing of Pole ST Pole by 6 SWG Wire by providing and fixing of 20 mm dia' earthing rod 2.550 Mtr. long as per norms complete in all respect.
Stringing, sagging, binding and Jumpering of ACSR Dog conductor. 3 Phase of 33 KV Line including fixing, mounting of P.G.clamp suitable for Dog Conductor at sectional point.
Digging of trench and laying of 3x300 sq. mm XLPE Cable underground Double Circuit in HDPE Pipe : Laying of Double circuit 3x300 sq .mm XLPE Cable (2x1530 Mtr.) in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required materials, as 1st class Bricks, Stone slabs and fine sand. Providing 150 mm fine sand cusion beneath, and 150 mm sand cusion above the cable. The cable shall be duly protected by Bricks, sand and stone slab. The inter axial spacing between two cables should be in between 0.25 to 0.40 M. After laying the cable in HDPE pipe refilling and ramming of the left out soil,closing the trench and leveling.
Installation of 33 KV 3x300 sq. mm Outdoor End Terminations for 33 kV XLPE Cable
Fixing of barbed wire on the pole above 2750 mm ground level. Barbed wire wrapped for a distance of 0.9 mtr. with a pitch of 13.mm at a height.
Fixing of Danger board of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55
Fixing of Number plate of size 250x200x2 mm 3650 mm above ground level as per Respo norms. RESPO Drawing No-55
Line Isolator Structure Fabrication of isolator structures 3.5mtr in height as per drawing No. RES 39 Digging of two Nos. Pits of size 1.075 x 0.9 x0.3 Mtr providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC ( cement, coarse sand and stone grit of 20 mm gauge) of ratio 1:4:8 in block of 1.075 mtX 0.3 Mtr including supply of all T&P complete in all respect. The work includes dragging, Shifting upto 40 Mtr. Raising and erecting the two legs with runner of isolator in proper allingment level and plumb. Plinths of the Isolator structure shall be properly finished with champering of edges.(All the material will be supplied by the Contractor like M.S Flat etc.)
Installation of Line Isolators Assembling and installation of Line isolator on the Isolator structure , adjusting of opening mechanism in proper alignment so as to ensured smooth operation of the same. In case of line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Laying of cable & HDPE Pipe Laying of Single circuit 33 KV 3x300 Sq mm XLPE cable and HDPE Pipe by drilling method below NHAI Road / Railway crossing. Twin cables be laid parallelly (2x760 Mtr) at the depth of 3 mtr from the under surface in HDPE pipe (200 mm. dia.) casing.
NOC will be granted from Central/ state Electrical safety department.( Final settlement of the payment will be on the basis of Quotation of expenditure of proovided by the contractor in BOQ or cost of expenditure provided by electrical saftey which is low).
Permission of NHAI/PWD/RAILWAY etc. for road crossing. .( Final settlement of the payment will be on the basis of Quotation of expenditure provided by the contractor in BOQ or cost of expenditure provided by NHAI Depaartment whichever is low.)
permission of cutting and chopping of tree from forest deppt. ( (.Final settlement of the payment will be on the basis of Quotation of expenditure provided by the contractor in BOQ or Quotation of expenditure provided by FOREST department which is low))
Restoring the road as it is before after completion of work
Painting of poles Painting of poles with one coat of red oxide, two coats of enamel paint ISI mark.
Shiva Electricals Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .