Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAccepted-AOC | L1 | Accepted-AOC DUE TO L1 | |
| 2 | L2₹48.3 L+₹3.6 L (7.93%)Rejected-Finance | L2 | Rejected-Finance Due to L2 | |
| 3 | L3₹48.7 L+₹3.9 L (8.72%)Rejected-Finance | L3 | Rejected-Finance Due to L3 | |
| 4 | L4₹49.7 L+₹4.9 L (11.0%)Rejected-Finance | L4 | Rejected-Finance Due to L4 | |
| 5 | L5₹49.9 L+₹5.1 L (11.4%)Rejected-AOC | L5 | Rejected-AOC REJECTED DUE TO L5 |
| Sl No | Description | Qty | Unit | RAJGURU & CO L3 | M/S AK SINGH L4 | A M CHOUDHURY AND CO L5 | MS J B CONSTRUCTION AND CO L1 | M/S D J ENTERPRISE L7 | SUBHAS CONSTRUCTIONS L8 | M/S GOPAL ROY AND CO L2 | M/S RK SAHA AND CO L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) exc. 1.5 Sqm but not exc. 4.0 Sqm each, complete all as directed. | 2 | Each | 470 ₹940 | 472 ₹944 | 475 ₹950 | 120 ₹240 Lowest | 490 ₹980 | 130 ₹260 | 472 ₹944 | 473 ₹946 |
| 2.00 | Taking down chowkhats or frame with shutters (without taking off shutters from the frame) not exc. 1.5 Sqm each, complete all as directed. | 2 | Each | 370 ₹740 | 372 ₹744 | 378 ₹756 | 120 ₹240 Lowest | 390 ₹780 | 130 ₹260 | 372 ₹744 | 380 ₹760 |
| 3.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings not exc 15 cm thickness (below or above ground level), complete all as directed. | 4.73 | Cum | 1,800 ₹8,514 | 1,810 ₹8,561.3 | 1,812 ₹8,570.76 | 400 ₹1,892 Lowest | 1,820 ₹8,608.6 | 500 ₹2,365 | 500 ₹2,365 | 1,815 ₹8,584.95 |
| 4.00 | Demolition of reinforced cement concrete of roofs, floors (other than ground floors), beams, staircases, landing, chajjas and similar suspended work, complete all as directed. | 5 | Cum | 3,800 ₹19,000 | 3,800 ₹19,000 | 3,805 ₹19,025 | 600 ₹3,000 | 3,815 ₹19,075 | 700 ₹3,500 | 390 ₹1,950 Lowest | 3,810 ₹19,050 |
| 5.00 | Demolition of brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as directed. | 28 | Cum | 770 ₹21,560 | 775 ₹21,700 | 778 ₹21,784 | 500 ₹14,000 Lowest | 785 ₹21,980 | 600 ₹16,800 | 650 ₹18,200 | 780 ₹21,840 |
| 6.00 | Dismantling of plain or corrugated steel sheeting, any gauge, thickness, including Nainital or similar pattern roof coverings complete all as directed. | 250 | Sqm | 38 ₹9,500 Lowest | 40 ₹10,000 | 42 ₹10,500 | 38 ₹9,500 Lowest | 50 ₹12,500 | 55 ₹13,750 | 40 ₹10,000 | 45 ₹11,250 |
| 7.00 | Dismantling structural steel work including doors, gates but excluding framed truss etc., complete all as directed. | 9.5 | Qtl | 830 ₹7,885 | 840 ₹7,980 | 843 ₹8,008.5 | 600 ₹5,700 Lowest | 850 ₹8,075 | 700 ₹6,650 | 850 ₹8,075 | 845 ₹8,027.5 |
| 8.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as directed. | 205 | Sqm | 118 ₹24,190 | 120 ₹24,600 | 122 ₹25,010 | 110 ₹22,550 | 130 ₹26,650 | 130 ₹26,650 | 25 ₹5,125 Lowest | 125 ₹25,625 |
| 9.00 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc., complete all as directed. | 1,650 | Sqm | 125 ₹2,06,250 | 127 ₹2,09,550 | 128 ₹2,11,200 | 110 ₹1,81,500 | 135 ₹2,22,750 | 130 ₹2,14,500 | 24 ₹39,600 Lowest | 130 ₹2,14,500 |
| 10.00 | Hacking out old broken glass (any thickness, size, quality or description) from wooden frames or stone, concrete or brick surrounds, glazed with putty or fixed with beads, complete all as directed. | 10 | Sqm | 122 ₹1,220 | 125 ₹1,250 | 127 ₹1,270 | 100 ₹1,000 Lowest | 132 ₹1,320 | 200 ₹2,000 | 120 ₹1,200 | 129 ₹1,290 |
Tender Value
₹44.5 L
EMD Value
₹89,000
Closing Date
9 Jul 2025, 6:00 pmClosed
GARRISON ENGINEER
GARRISON ENGINEER JORHAT
SPECIAL REPAIR TO BAFFLE FIRING RANGE PLASTERING PAINTING AND BRICK WORK PROVN OF 01 TOILET ALONGWITH SANITARY FITTINGS NEAR BLDG NOP77 AT 402 LT AD TRGTCAMP AND PROVISION OF 15 PEDESTAL FAN FOR GE 583 ENGR PARK AT BHALUKMARA IN JORHAT M
2025_MES_715600_1
8253/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE JORHAT
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER JORHAT
₹89,000
Yes
18 Oct 2025
19 Jun 2025
10 Jul 2025
19 Jun 2025
9 Jul 2025
3 Jul 2025
19 Jun 2025 - 25 Jun 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .