Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.9 L+₹292.03 (0.15%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹5,820
Closing Date
21 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Const of culvert near BMS Naga
2026_RDPR_315899_8
NIT NO 54 OF 2026-27 ADF KEREN
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹5,820
1 Aug 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
21 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches upto 1.5 m depth i/c disposal | - | Cum | 436 | - |
| 2 | Providing/Laying of dry stone soling, tightly hand packed | - | Cum | 1,000 | - |
| 3 | Providing and Laying cement conc. of specified grade M 7.5 (1:4:8) mix using n/s nallah agg size 40mm. | - | Cum | 4,600 | - |
| 4 | P/F formwork of ordinary timber planks so as get rough finish | 0.9 | sqm | 262.3 | ₹236.07 |
| 5 | Providing and Laying of cement concrete of specified grade M10(1:3:6) mix using n/s nallah agg size 40mm. | 0.9 | Cum | 5,200 | ₹4,680 |
| 6 | Providing and Laying of RCC cement concrete of specified grade M10(1:1.5:3) mix using n/s nallah agg size 20 mm. | 0.9 | Cum | 7,200 | ₹6,480 |
| 7 | Reinforcement of RCC work including cutting strighting fixing in position all complete job | 0.9 | qtls | 11,500 | ₹10,350 |
| 8 | labour chrges for laying of excavated material including levelling ,dressing Avialable at site | 0.9 | Cum | 198.7 | ₹178.83 |
| 9 | Carriage of material by MT & HL fine /course Agg for MT 15 km & HL 800m. | 25.54 | cum | 1,100 | ₹28,094 |
| 10 | Add provision for Signboard and rectification of doors and windows. | - | LS | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1026993.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .