Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance NO 26 ANGELS COMPLEX TVS TOLGATE TIRUCHIRAPALLI TAMIL NADU 620 020 | TIRUCHIRAPALLI | TIRUCHIRAPALLI | TAMIL NADU | 620020 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹44 L
EMD Value
₹44,000
Closing Date
4 Dec 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Advisor (E and M)
Chennai Metro Rail Limited, METROS, Nandanam, Chennai 600035
Civil Enabling Works for Additional Escalators (C1 and 2) Erection Work
2024_CMRL_836350_1
CMRL/PHASE I and PHASE I EXT/ESC/CIVIL/01/2024
Limited
Miscellaneous Works
Works
CHENNAI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹44,000
Yes
5 Dec 2024
25 Nov 2024
5 Dec 2024
25 Nov 2024
4 Dec 2024
29 Nov 2024
25 Nov 2024 - 29 Nov 2024
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 Sq.m on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed : All Kind of soils
Earth work by deploying Machinery or manual in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc.,complete. lead beyond 100 meter will be paid separately
Earth work by deploying Machinery or manual in all soils except hard rock requiring blasting and conveying for formation of bund with an extra lead of every 1 KM or part thereof deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete for Extra lead beyond 100 meter for every 1 Km lead
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Dismantling tile work in floors, walls and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm
Demolishing Plain cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement Mortar
Raking out joints in lime or cement mortar and preparing the surface for re-pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
Removing and replacement of Damaged Aluminium/SS Supporting System for Aluminium Composite Panel Works.the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer- in-Charge.
Supervisor
Coolie
Supplying and fixing Shade net(Green net) for under construction of high raised building
SCAFFOLDING Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a erviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Item will be Certified only for Maintenance Work carried out above 5 Mtr.
Core Cutting: Core Cutting on Existing RCC Structure and Block Work using Standard Core Cutting Machine of Size 100 to 200 mm Dia and depth of 150 to maximum 450 mm.
Core Cutting Core Cutting on Existing RCC Structure and Block Work using Standard Core Cutting Machine of Size 100 to 200 mm Dia and depth above 450 to maximum 800 mm.
adya enterprises (BID ID -3130721)
Creators Engineers and Interiors Pvt Ltd (BID ID -3131343)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .