| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.7 LAccepted-AOC 21 333 031 | JHUNJHUNU | RAJASTHAN | 333031 | ₹14.7 L | 1 | Accepted-AOC L1 |
| 2 | 2₹15.0 L+₹31,740 (2.16%)Rejected-Finance | ₹15.0 L+₹31,740 (2.16%) | 2 | Rejected-Finance L2 |
| 3 | 3₹17.2 L+₹2.5 L (16.8%)Rejected-Finance | ₹17.2 L+₹2.5 L (16.8%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | sihag construction L1 | m/s Ratan lal jangir L2 | MANIS AND COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth a lead within CEERI campus and lift upto 1.5 m, as directed by Engineer-in- Charge: | - | - | - | - | - |
| 1.10 | All kinds of soil | 80 | Sqm | 50 ₹4,000 | 35 ₹2,800 Lowest | 89 ₹7,120 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, a lead within CEERI campus as per direction of Enginner In Charge. | - | - | - | - | - |
| 2.10 | All kinds of soil | 3 | Cum | 260 ₹780 | 600 ₹1,800 | 249 ₹747 Lowest |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering,lead within CEERI campus and for all lift | 2 | Cum | 185 ₹370 | 450 ₹900 | 180 ₹360 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - | - |
| 4.10 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | Cum | 6,400 ₹12,800 Lowest | 7,000 ₹14,000 | 6,899 ₹13,798 |
| 4.20 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 8 | Cum | 5,350 ₹42,800 | 5,300 ₹42,400 Lowest | 5,999 ₹47,992 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - | - |
| 5.10 | Foundations, footings, bases of columns, etc. for mass concrete | 8 | sqm | 550 ₹4,400 | 500 ₹4,000 | 349 ₹2,792 Lowest |
Tender Value
₹14.1 L
EMD Value
₹28,500
Closing Date
1 Jul 2026, 3:00 pmClosed
Director
CSIR CEERI PILANI
Miscellaneous repair works of civil in institute campus at CSIR-CEERI Pilani
2026_CSIR_281688_1
14/506/2026-CE
Open Tender
Civil Works
Item Rate
90 days
CSIR CEERI PILANI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
DIRECTOR CSIR CEERI
₹28,500
14 Jul 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth a lead within CEERI campus and lift upto 1.5 m, as directed by Engineer-in- Charge: | - | - | 100 | - |
| 1.1 | All kinds of soil | 80 | Sqm | 10 | ₹800 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, a lead within CEERI campus as per direction of Enginner In Charge. | - | - | 100 | - |
| 2.1 | All kinds of soil | 3 | Cum | 10 | ₹30 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering,lead within CEERI campus and for all lift | 2 | Cum | 10 | ₹20 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | 100 | - |
| 4.1 | 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | Cum | 10 | ₹20 |
| 4.2 | 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 8 | Cum | 10 | ₹80 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | 100 | - |
| 5.1 | Foundations, footings, bases of columns, etc. for mass concrete | 8 | sqm | 10 | ₹80 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.46 MB
BOQ_328694.xls
BOQ • 0.78 MB
TenderCorrigendum.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .