Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.6 L+₹7.4 L (102.6%)Rejected-Finance | ₹14.6 L+₹7.4 L (102.6%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹14.6 L+₹7.4 L (103.3%)Rejected-Finance VILL BACHURDOBA P O JHARGRAM P S JHARGRAM DIST JHARGRAM PIN 721507 | JHARGRAM | JHARGRAM | WEST BENGAL | 721507 | ₹14.6 L+₹7.4 L (103.3%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAMANTA ELECTRICAL AND DECORATORS L3 | New Chaitali Decorators L1 | ASHIRBAD DECORATORS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Single slope strong bamboo( 3”to 4” dia) frame work shed with Tarpaulin cover, height 8'-6" to 9'-0" at the end and the post of strong bamboo (4” dia) @ 6'-0” C/C and embedded sufficiently in the ground, supplied fitted fixed with Coir rope with refits runners, ties, stiffeners and crossing etc. of full bamboos runner to be fixed with pillar or posts as protection of work. Nylon / Coir rope and half-split or full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting of the work and to be completed as per direction of authority.- Three ( 3) Sides Covering
A) For Duration of 1(One ) Day | 1 | Sqft. | 10 ₹10 | 8 ₹8 Lowest | 9 ₹9 |
| 2.00 | B) For Duration of 3(Three) Day | 1 | Sqft. | 30 ₹30 | 24 ₹24 Lowest | 27 ₹27 |
| 3.00 | C) For Duration of 7(Seven) Day | 1 | Sqft. | 40 ₹40 | 32 ₹32 Lowest | 35 ₹35 |
| 4.00 | D) For Duration of 15(Fifteen) Day | 1 | Sqft. | 60 ₹60 | 45 ₹45 Lowest | 50 ₹50 |
| 5.00 | Double slope strong bamboo (3” to 4”) dia frame work shed with Tarpaulin cover hight center 18”-0” and end 12”-0” and embedded sufficiently in the ground supplied fitted fixed with coir rope with refits corners. Ties, stiffening and crossing etc, of full bamboo. A full bamboo runner/Bracing,tie, to be fixed with pillar or post as protection of work Nilon/Coir rope and full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will no be allowed in any circumstance. The ground to be labeled and dressed before starting the work. With side covering and celing including all labour and other incidental charges. All complete as per direction of Engineer/Officer inchange. Removal of the same after completion of Election process and the fill up the all Dig Hole of bamboo filling by earth and clearing the all respect complete. (Payment wil;l be made on the basis of finished.Area.(Sq.ft./Sqm.) of the structure.
A) For Duration of 1(One ) Day | 1 | Sqft. | 12 ₹12 | 9 ₹9 Lowest | 10 ₹10 |
| 6.00 | B) For Duration of 3(Three) Day | 1 | Sqft. | 40 ₹40 | 27 ₹27 Lowest | 30 ₹30 |
| 7.00 | C) For Duration of 7(Seven) Day | 1 | Sqft. | 50 ₹50 | 35 ₹35 Lowest | 40 ₹40 |
| 8.00 | D) For Duration of 15(Fifteen) Day | 1 | Sqft. | 70 ₹70 | 50 ₹50 Lowest | 60 ₹60 |
| 9.00 | C.G.I.sheet Fencing 10'-0" height vertically and fixed with bamoo post (4") dia @ 6'-0" apart and strongly embeded into the ground and to construct where necessary as per direction of authority.-
A) For Duration of 1(One ) Day | 1 | Sqft. | 8 ₹8 | 5 ₹5 Lowest | 6 ₹6 |
| 10.00 | B) For Duration of 3(Three) Day | 1 | Sqft. | 17 ₹17 | 15 ₹15 Lowest | 15 ₹15 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
13 Mar 2026, 6:00 pmClosed
DE, Paschim Medinipur Zilla Parishad
Paschim Medinipur Zilla Parishad
Construction of pandals, sheds, barricades, drop gates to setup training centres, strong rooms and other allied works related to WBLA Election-2026 including temporary installation of Mike sets, Generator sets, Lights, Fans, A/C machine etc
2026_ZPHD_1018980_1
PMD/INF/DEO/2
Open Tender
CIVIL WORKS
Item Rate
3 days
Paschim Medinipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
₹20,000
Paschim Medinipur Zilla Parishad
16 Sept 2026
7 Mar 2026
16 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
9 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single slope strong bamboo( 3”to 4” dia) frame work shed with Tarpaulin cover, height 8'-6" to 9'-0" at the end and the post of strong bamboo (4” dia) @ 6'-0” C/C and embedded sufficiently in the ground, supplied fitted fixed with Coir rope with refits runners, ties, stiffeners and crossing etc. of full bamboos runner to be fixed with pillar or posts as protection of work. Nylon / Coir rope and half-split or full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will not be allowed in any circumstances. The ground to be labeled and dressed before starting of the work and to be completed as per direction of authority.- Three ( 3) Sides Covering
A) For Duration of 1(One ) Day | 1 | Sqft. | - | - |
| 2 | B) For Duration of 3(Three) Day | 1 | Sqft. | - | - |
| 3 | C) For Duration of 7(Seven) Day | 1 | Sqft. | - | - |
| 4 | D) For Duration of 15(Fifteen) Day | 1 | Sqft. | - | - |
| 5 | Double slope strong bamboo (3” to 4”) dia frame work shed with Tarpaulin cover hight center 18”-0” and end 12”-0” and embedded sufficiently in the ground supplied fitted fixed with coir rope with refits corners. Ties, stiffening and crossing etc, of full bamboo. A full bamboo runner/Bracing,tie, to be fixed with pillar or post as protection of work Nilon/Coir rope and full bamboo to be fixed on the roof of the shed to avoid the wind blow. The covering must sun/rain water tight, leakage of rain water will no be allowed in any circumstance. The ground to be labeled and dressed before starting the work. With side covering and celing including all labour and other incidental charges. All complete as per direction of Engineer/Officer inchange. Removal of the same after completion of Election process and the fill up the all Dig Hole of bamboo filling by earth and clearing the all respect complete. (Payment wil;l be made on the basis of finished.Area.(Sq.ft./Sqm.) of the structure.
A) For Duration of 1(One ) Day | 1 | Sqft. | - | - |
| 6 | B) For Duration of 3(Three) Day | 1 | Sqft. | - | - |
| 7 | C) For Duration of 7(Seven) Day | 1 | Sqft. | - | - |
| 8 | D) For Duration of 15(Fifteen) Day | 1 | Sqft. | - | - |
| 9 | C.G.I.sheet Fencing 10'-0" height vertically and fixed with bamoo post (4") dia @ 6'-0" apart and strongly embeded into the ground and to construct where necessary as per direction of authority.-
A) For Duration of 1(One ) Day | 1 | Sqft. | - | - |
| 10 | B) For Duration of 3(Three) Day | 1 | Sqft. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_2503815.xls
BOQ • 0.33 MB
DEO-2.rar
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .