Loading
Loading…
Loading…
Tender Value
Refer Docs
Closing Date
27 Apr 2023, 3:00 pmClosed
PR & CC
This tender is floated for supply, fabrication , transportation and installation of 17 MT and 22 MT
23000011-HD-10157
23000011-HD-10157
Open Tender
Unknown (Unspecified Location)
₹0
Exempted
27 Apr 2023
6 Apr 2023
27 Apr 2023
27 Apr 2023
6 Apr 2023 - 13 Apr 2023
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | 17M_HR_FAB AND SPLY OF | 17M_HR_FAB AND SPLY OF — DESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FOR RETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC. FABRICATION SHALL BE AS PER DRAWINGS/SPECIFICATIONS AS MENTIONED IN THE TENDER.THE SCOPE OF JOB INCLUDES PROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW NUMBER OF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESE ARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING.INSPECTION AND TESTING HIGH MAST POLE:1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL & CHEMICAL PROPERTIES ACCEPTANCE CRITERIA : MANUFACTURER’S TEST CERTIFICATE FORMAT OF RECORD : MATERIAL INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : SAMPLE FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW & WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : NO. OF SIDES ACCEPTANCE CRITERIA : TWENTY FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WIDTH OF SIDES ACCEPTANCE CRITERIA : SHOULD NOT DIFFER MORE THAN 2 MM FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD6.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING PROCESS ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD7.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING GEOMATRY ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD8.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORDINSPECTION AND TESTING FOR SIGNAGE MOUNTING BRACKET1. DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS2 .DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR FOUNDATION BOLT1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : AS PER DRAWING ONE SAMPLE PER RO TO BE TESTED FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR SIGNAGE1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :SUBSTRATE ACCEPTANCE CRITERIA :MAKE, PURCHASE INVOICE, THICKNESS FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :REFLECTIVE SHEETING ACCEPTANCE CRITERIA :PURCHASE INVOICE, LOT CERTIFICATE, WARRANTEE CERTIFICATE. FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :OVERLAY ACCEPTANCE CRITERIA :PURCHASE INVOICE LOT CERTIFICATE WARRANTEE CERTIFICATE FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :APPLICATION ACCEPTANCE CRITERIA :AS PER MANUFACTURER’S RECOMMENDATION FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :DIMENSIONAL CHECK ACCEPTANCE CRITERIA :AS PER DRAWINGTESTING PROCEDURE SHALL BE AS MENTIONED IN THE TENDER. | - | Each |
| 2 | 17M_HR_CONST FOUNDATION 11114-Gurgaon Retail RO | 17M_HR_CONST FOUNDATION 11114-Gurgaon Retail RO — PROVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAIL OUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PER THE DRAWING ATTACHED AND ALSO TO SUPPLY THE FOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED & PAID BY HPCL. COST OF TPI NOT TO BE INCLUDED IN OFFER. THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFORE INSTALLATION OF HIGH MAST. | - | Each |
| 3 | 17M_HR_INSTLN AND | 17M_HR_INSTLN AND — ERECTING, INSTALLATION AND COMMISSIONING OF HIGH MAST / ANCILLARIES. RATE INCLUDES HOISTING, LAUNCHING, TOOLS, TACKLES, MACHINERY, JIGS, SCAFFOLDING, FRAMEWORK ETC. ALL NEEDED FOR ERECTION. CARE SHALL BE TAKEN TO NOT TO DISTURB OUTLET OPERATION AND TO ENSURE NO DAMAGE TO THE HIGH MAST OR OUTLET FACILITIES. ALL SAFETY MEASURES SHALL BE TAKEN WHILE ERECTION. SCOPE INCLUDES UNPACKING AND CONNECTION OF EARTHING WITH HIGH MAST TO EARTH PITS COST QUOTED TO INLCUDE THE SAME. | - | Each |
| 4 | 17M_HR_TRANSPT OF HIGH | 17M_HR_TRANSPT OF HIGH — INSURANCE, LOADING, TRANSPORTATION, UNLOADING AND STACKING OF HIGH MAST AT RETAIL OUTLETS OR AS ADVISED BY THE REGIONS. Punjab 17 Mtr Manadatory: No | - | Each |
| 1 | 17M_PB_FAB AND SPLY OF | 17M_PB_FAB AND SPLY OF — DESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FOR RETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC. FABRICATION SHALL BE AS PER DRAWINGS/SPECIFICATIONS AS MENTIONED IN THE TENDER.THE SCOPE OF JOB INCLUDES PROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW NUMBER OF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESE ARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING.INSPECTION AND TESTING HIGH MAST POLE:1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL & CHEMICAL PROPERTIES ACCEPTANCE CRITERIA : MANUFACTURER’S TEST CERTIFICATE FORMAT OF RECORD : MATERIAL INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : SAMPLE FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW & WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : NO. OF SIDES ACCEPTANCE CRITERIA : TWENTY FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WIDTH OF SIDES ACCEPTANCE CRITERIA : SHOULD NOT DIFFER MORE THAN 2 MM FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD6.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING PROCESS ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD7.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING GEOMATRY ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD8.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORDINSPECTION AND TESTING FOR SIGNAGE MOUNTING BRACKET1. DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS2 .DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR FOUNDATION BOLT1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : AS PER DRAWING ONE SAMPLE PER RO TO BE TESTED FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR SIGNAGE1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :SUBSTRATE ACCEPTANCE CRITERIA :MAKE, PURCHASE INVOICE, THICKNESS FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :REFLECTIVE SHEETING ACCEPTANCE CRITERIA :PURCHASE INVOICE, LOT CERTIFICATE, WARRANTEE CERTIFICATE. FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :OVERLAY ACCEPTANCE CRITERIA :PURCHASE INVOICE LOT CERTIFICATE WARRANTEE CERTIFICATE FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :APPLICATION ACCEPTANCE CRITERIA :AS PER MANUFACTURER’S RECOMMENDATION FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :DIMENSIONAL CHECK ACCEPTANCE CRITERIA :AS PER DRAWINGTESTING PROCEDURE SHALL BE AS MENTIONED IN THE TENDER. | - | Each |
| 2 | 17M_PB_CONST FOUNDATION 11115-Bhatinda Retail RO | 17M_PB_CONST FOUNDATION 11115-Bhatinda Retail RO — PROVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAIL OUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PER THE DRAWING ATTACHED AND ALSO TO SUPPLY THE FOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED & PAID BY HPCL. COST OF TPI NOT TO BE INCLUDED IN OFFER. THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFORE INSTALLATION OF HIGH MAST. | - | Each |
| 3 | 17M_PB_INSTLN AND | 17M_PB_INSTLN AND — ERECTING, INSTALLATION AND COMMISSIONING OF HIGH MAST / ANCILLARIES. RATE INCLUDES HOISTING, LAUNCHING, TOOLS, TACKLES, MACHINERY, JIGS, SCAFFOLDING, FRAMEWORK ETC. ALL NEEDED FOR ERECTION. CARE SHALL BE TAKEN TO NOT TO DISTURB OUTLET OPERATION AND TO ENSURE NO DAMAGE TO THE HIGH MAST OR OUTLET FACILITIES. ALL SAFETY MEASURES SHALL BE TAKEN WHILE ERECTION. SCOPE INCLUDES UNPACKING AND CONNECTION OF EARTHING WITH HIGH MAST TO EARTH PITS COST QUOTED TO INLCUDE THE SAME. | - | Each |
| 4 | 17M_PB_TRANSPT OF HIGH | 17M_PB_TRANSPT OF HIGH — INSURANCE, LOADING, TRANSPORTATION, UNLOADING AND STACKING OF HIGH MAST AT RETAIL OUTLETS OR AS ADVISED BY THE REGIONS. Punjab 22 Mtr Manadatory: No | - | Each |
| 1 | 22M_PB_FAB AND SPLY OF | 22M_PB_FAB AND SPLY OF — DESIGN, FABRICATION, TESTING, PACKING OF HIGH MAST FOR RETAIL OUTLETS UNDER SPECIFIED LOCATION BY HPCL EIC. FABRICATION SHALL BE AS PER DRAWINGS/SPECIFICATIONS AS MENTIONED IN THE TENDER.THE SCOPE OF JOB INCLUDES PROVISION OF ONE STANDARD LIGHTNING ARRESTOR AND TOW NUMBER OF EARTH PITS HAVING PLATE ELECTRODES. THE COST OF THESE ARE TO BE INCLUDED IN HIGH MAST SIGNAGE WHILE QUOTING.INSPECTION AND TESTING HIGH MAST POLE:1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL & CHEMICAL PROPERTIES ACCEPTANCE CRITERIA : MANUFACTURER’S TEST CERTIFICATE FORMAT OF RECORD : MATERIAL INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : SAMPLE FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : REVIEW & WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : NO. OF SIDES ACCEPTANCE CRITERIA : TWENTY FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WIDTH OF SIDES ACCEPTANCE CRITERIA : SHOULD NOT DIFFER MORE THAN 2 MM FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD6.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING PROCESS ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD7.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : WELDING GEOMATRY ACCEPTANCE CRITERIA : ONE LONGITUDINAL WELD AS PER TENDER TERMS SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORD8.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & RECORDINSPECTION AND TESTING FOR SIGNAGE MOUNTING BRACKET1. DETAIL OF INSPECTION/TEST TO BE CONDUCTED : GALVANIZATION CHECK ACCEPTANCE CRITERIA : BS EN ISO 1461 FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS2 .DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR FOUNDATION BOLT1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : MECHANICAL PROPERTIES ACCEPTANCE CRITERIA : AS PER DRAWING ONE SAMPLE PER RO TO BE TESTED FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESS & REVIEW2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED : DIMENSIONAL CHECK ACCEPTANCE CRITERIA : AS PER DRAWING FORMAT OF RECORD : INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL : WITNESSINSPECTION AND TESTING FOR SIGNAGE1.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :SUBSTRATE ACCEPTANCE CRITERIA :MAKE, PURCHASE INVOICE, THICKNESS FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS2.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :REFLECTIVE SHEETING ACCEPTANCE CRITERIA :PURCHASE INVOICE, LOT CERTIFICATE, WARRANTEE CERTIFICATE. FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS3.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :OVERLAY ACCEPTANCE CRITERIA :PURCHASE INVOICE LOT CERTIFICATE WARRANTEE CERTIFICATE FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS4.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :APPLICATION ACCEPTANCE CRITERIA :AS PER MANUFACTURER’S RECOMMENDATION FORMAT OF RECORD :INSPECTION REPORT SCOPE OF INSPECTION BY 3RD PARTY/HPCL :WITNESS5.DETAIL OF INSPECTION/TEST TO BE CONDUCTED :DIMENSIONAL CHECK ACCEPTANCE CRITERIA :AS PER DRAWINGTESTING PROCEDURE SHALL BE AS MENTIONED IN THE TENDER. | - | Each |
| 2 | 22M_PB_CONST FOUNDATION 11115-Bhatinda Retail RO | 22M_PB_CONST FOUNDATION 11115-Bhatinda Retail RO — PROVIDING FOUNDATION FOR HIGH MAST AT ADVISED RETAIL OUTLETS USING RCC M20. VENDOR TO CAST THE FOUNDATION AS PER THE DRAWING ATTACHED AND ALSO TO SUPPLY THE FOUNDATION BOLTS. THIRD PARTY INSPECTION (TPI) OF BOLTS TO BE ARRANGED & PAID BY HPCL. COST OF TPI NOT TO BE INCLUDED IN OFFER. THE FOUNDATION TO BE CASTED WELL IN ADVANCE BEFORE INSTALLATION OF HIGH MAST. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
23000011-HD-10157.pdf
TENDER_DOCUMENT • 19.97 MB
Download all tender documents and submit your bid