Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1228313.85₹12.3 LAccepted-Finance | ₹12.3 L | 1228313.85 | Accepted-Finance Least Quote Value |
| 2 | 1230379.55₹12.3 LRejected-Finance | ₹12.3 L | 1230379.55 | Rejected-Finance Highest Quote Value |
| Sl No | Description | Qty | Unit | R.Perumal Constructions L1 | RAJARAM CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Construction of Compound Wall in Panchayat Office Building @ Chinnakallapadi Panchayat | |||||
| 1.01 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 53.33 | Cum | 263.78 ₹14,067.39 | 263.78 ₹14,067.39 |
| 1.02 | Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification. | 7.79 | Cum | 5,351.04 ₹41,684.60 | 5,351.04 ₹41,684.60 |
| 1.03 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(BGL) | 102.87 | Sqm | 547.5 ₹56,321.33 | 547.5 ₹56,321.33 |
| 1.04 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(AGL) | 75.9 | Sqm | 1,095 ₹83,110.50 | 1,095 ₹83,110.50 |
| 1.05 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 2.07 | Cum | 91,887.94 ₹1.9 L | 91,887.94 ₹1.9 L |
| 1.06 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.(BGL) | 25.3 | Cum | 8,969.79 ₹2.3 L | 8,969.79 ₹2.3 L |
| 1.07 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.(AGL) | 4.37 | Sqm | 9,108.86 ₹39,805.72 | 9,108.86 ₹39,805.72 |
| 1.08 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 25.01 | Cum | 6,121.37 ₹1.5 L | 6,191.37 ₹1.5 L |
| 1.09 | Plastering with Cement Mortar 1:5 (One Cement and five M.Sand) 12mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 432.59 | Cum | 283.25 ₹1.2 L | 283.25 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹12,508
Closing Date
9 Mar 2026, 3:00 pmClosed
Block Development Office(BP),Tiruvannamalai
BLOCK DEVELOPEMENT OFFICE,Tiruvannamalai
Construction of Compound Wall in Panchayat Office Building at Chinnakallapadi panchayat
2026_RDTN_670529_1
A3/2040/2025 Dt 09.02.2026
Open Tender
Civil Works
90 days
TIRUVANNAMALAI
Rer to Tender Document
2 documents required · 2 mandatory
₹0
₹12,508
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
9 Mar 2026
4 Mar 2026
Construction of Compound Wall in Panchayat Office Building @ Chinnakallapadi Panchayat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Base course concrete with C.C.1:4:8 mix using 40mm I.S.S. size HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing for base course as per standared specification.
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(BGL)
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.(AGL)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.(BGL)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.(AGL)
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One Cement and five M.Sand) 12mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
ChinnakallappadiTenderDoument.pdf
Tender Documents • 0.89 MB
BOQ_805786.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid