| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.7 LAdmitted-Finance N 72 SODEPUR 2ND LANE P O P S HARIDEVPUR NEAR HARIDEVPUR SAMMILANI CLUB KOLKATA 700 082 | KOLKATA | KOLKATA | WEST BENGAL | 700082 | -0.25% | ₹4.7 L | L1 | Admitted-Finance |
| 2 | L2₹4.7 L+₹191 (0.04%)Admitted-Finance | -0.21% | ₹4.7 L+₹191 (0.04%) | L2 | Admitted-Finance |
| 3 | L3₹4.8 L+₹476 (0.10%)Admitted-Finance | -0.15% | ₹4.8 L+₹476 (0.10%) | L3 | Admitted-Finance |
| 4 | L4₹4.9 L+₹10,706 (2.26%)Admitted-Finance | +2.00% | ₹4.9 L+₹10,706 (2.26%) | L4 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
14 Mar 2026, 11:00 amClosed
Executive Engineer (C)
Executive Engineer (C ) HQ at 48, Market Street, Kolkata - 87
NECESSARY ARRANGEMENT FOR REPAIRING OF DAMAGED CEILING OF BUILDING DEPARTMENT, 3RD FLOOR OF CMO BUILDINGS.
2026_KMC_1018311_1
KMC/DG(C)/EEC/HQ/25-26
Open Tender
CIVIL WORKS
Percentage
21 days
KMC AREA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,600
3 Jul 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
14 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (G) WOOD AND PVC WORKS E. REPAIR WORKS 43.Taking out existing partition/ceiling of particle board, masonite board, ply board, soft board etc. of any thickness and refixing same in new position with necessary clamps making holes in walls, floor, roof and mending damages if any.[concrete plaster will be paid separately] | - | SQM | 55 | - |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 0.4 | SQM | 19 | ₹7.6 |
| 3 | PAGE -322/ IT -16.22
ROADS & BRIDGE 2018
CLEANING THE EXPOSED CORRODED REINFORCEMENT AS WELL AS WORN OUT CONCRETE BY SAND BLASTING WITH AIR COMPRESSOR INCLUDING ALL MATERIALS, HIRE CHARGES OF MACHINERIES AND LABOUR ETC. ALL COMPLETE AS PER TECHNICAL SPECIFICATION AND DIRECTION OF THE ENGINEER-IN-CHARGE. | 0.4 | SQM | 604 | ₹241.59 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | 1 | SQM | 782 | ₹782 |
| 5 | REPAIR AND REHABILITATION 16.(11)Epoxy bonding of new concrete to old concrete. | 0.4 | SQM | 517 | ₹206.75 |
| 6 | REPAIR AND REHABILITATION 16.(3)Guniting concrete surface with cement mortar (25 mm nominal thick) applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification. | 0.4 | SQM | 912 | ₹364.79 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.III.OTHER MANUFACTURER NOT SPECIFIED (10th Corrigenda & addenda dated 22.01.2020) | 0.2 | MT | 60,102 | ₹12,019.8 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar (c) 10 mm thick plaster (3rd Corrigenda & addenda dated 04.06.2018) | 0.4 | SQM | 151 | ₹60.38 |
| 9 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER B. MISCELLANEOUS ITEMS 5 (a)Rendering the Surface of walls and ceiling with White Cement base WATER PROOF wall putty of approved make & brand.(1.5 mm thick) | 1 | %SQ | 124.16 | ₹124.16 |
| 10 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 7 Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) (b) Two Coats ii) Solvent based interior grade Acrylic Primer [This item to be done under specific instruction of the Superintending Engineer] | 0.6 | %SQ | 4,850 | ₹2,910 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_2502250.xls
BOQ • 0.30 MB
form_166.pdf
Tender Documents • 1.18 MB
C1.pdf
Additional Documents • 4.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .