Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.6 CrAccepted-Finance | ₹6.6 Cr | 1 | Accepted-Finance 1 |
| 2 | 2₹6.7 Cr+₹9.5 L (1.44%)Accepted-Finance | ₹6.7 Cr+₹9.5 L (1.44%) | 2 | Accepted-Finance 2 |
| 3 | 3₹6.8 Cr+₹22.1 L (3.35%)Accepted-Finance | ₹6.8 Cr+₹22.1 L (3.35%) | 3 | Accepted-Finance 3 |
Tender Value
₹6.3 Cr
EMD Value
₹3.3 L
Closing Date
28 Feb 2022, 3:00 pmClosed
the Superintending Engineer H C and M Madurai
the Superintending Engineer H C and M Madurai
Improvements, Dip raising, construction of Retaining wall works in the Government roads of Periakulam Highways C and M Sub-Division MDU059
2022_HWAY_221692_1
MDU 059 TNO 33 2021 22 HDO Dated 22012022
Open Tender
Civil Works - Roads
Percentage
180 days
Theni
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹3.3 L
8 Nov 2022
7 Feb 2022
1 Mar 2022
7 Feb 2022
28 Feb 2022
10 Feb 2022
8 Feb 2022 - 9 Feb 2022
eProcurement System Government of Tamil Nadu Created By: Panneerselvam T Created Date/Time: 07-Mar-2022 11:57 AM Tender Title: MDU 059 TNO 33 2021 22 HDO Dated 22012022 Tender ID: 2022_HWAY_221692_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Madurai Circle
Schedule of quantities to accompany the Tender for the work of Improvements, Dip raising, construction of Retaining wall works in the Government roads of Periakulam (Highways) C&M Sub-Division (MDU-059) LIST OF ROAD ATTACHED IN PRICE BID DOCUMENT.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 A P CONSTRUCTIONS(GSTN-33AAHFA7980N1ZY) 56256117.257 6.000 66787262.000 Six Crore Sixty Seven Lakh Eighty Seven Thousand Two Hundred and Sixty Two
2.00 R SABEER ALI(GSTN-33AXBPS5293B1ZL) 56256117.257 8.000 68047399.000 Six Crore Eighty Lakh Fourty Seven Thousand Three Hundred and Ninty Nine
3.00 AMR CCONSTRUCTION(GSTN-NA) 56256117.257 4.500 65842159.000 Six Crore Fifty Eight Lakh Fourty Two Thousand One Hundred and Fifty Nine
Lowest Amount Quoted BY: AMR CCONSTRUCTION(65842159.000)
BOQ Summary Details Tender Title: MDU 059 TNO 33 2021 22 HDO Dated 22012022 Tender ID: 2022_HWAY_221692_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 AMR CCONSTRUCTION 65842159.000 L1
2 A P CONSTRUCTIONS 66787262.000 L2
3 R SABEER ALI 68047399.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .