Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-Finance VPO NAINIKHAD TEHSIL BHATTIYAT DISTT CHAMBA VPO NAINIKHAD NAINIKHAD CHAMBA HIMACHAL PRADESH 176301 | CHAMBA | HIMACHAL PRADESH | 176301 | ₹3.0 Cr | L1 | Accepted-Finance Ist Lowest |
| 2 | L2₹3.1 Cr+₹3.9 L (1.29%)Rejected-Finance | ₹3.1 Cr+₹3.9 L (1.29%) | L2 | Rejected-Finance 2nd Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
25 Jul 2026, 11:00 amClosed
Executive Engineer Chamba Division HPPWD., Chamba
Executive Engineer Chamba Division HPPWD., Chamba
Construction of District Drug Ware House-cum-Vaccination Store at Leprosy Hospital Sarol District Chamba (SH Construction of Building Portion W.S. and S.I. ,Rain Water Harvesting ,Septic Tank, Site development Work and Boundary Wall)
2026_PWD_139338_1
NO. WA-II-Cha/26- 12735-84 dated 15.07.2026
Open Tender
Civil Works - Buildings
Percentage
540 days
Chamba
Please refer Tender documents.
14 documents required · 14 mandatory
₹7,000
₹5.8 L
13 Aug 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Excavation work /cutting by mechanical means (Hydraulic excavator)/ manual means in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rock, chiseling / wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailing out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-in-charge and disposal of all surplus excavated soil in acquired width or at an approved dumping site including its stacking leveling dressing including all leads and lifts by head-load, mechanical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HPPWD specification. Any loss to the public and private property during the course of execution and disposal of unserviceable material shall be absolute responsibility of the contractor which shall have to be compensated by him in all cases.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 704.55 | Per Cubic metre | 170.5 | ₹1,20,125.78 |
| 2.01 | Excavation in foundation and trenches in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, pick jumper work, blasting work both in soft and hard rock, chiseling / wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil setting out true to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable diversion pumping or bailing out and excavation shall be kept dry wherever so required by the contractor at his own cost as directed by the Engineer-in-charge and disposal of all surplus excavated soil in acquired width or at an approved dumping side including its stacking leveling dressing including all leads and lifts by head-load, mechanical transportation or by any other mode of transportation with all cost of labours, machineries and other incidentals to complete the work as per HPPWD specification. Any loss to the public and private property during the course of execution and disposal of unserviceable material shall be absolute responsibility of the contractor which shall have to be compensated by him in all cases.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 873.17 | Per Cubic metre | 332.3 | ₹2,90,154.39 |
| 3.01 | Excavation in drains and channels etcetra in all heights and depths and in all kinds of soil including saturated soils comprising of pick work, jumper work, blasting work both in soft and hard rock, chiesling / wedging out of rock (Where blasting is prohibited) and their intermediate classification of soil setting out ture to the required lines, grade, width, cutting and trimming of side slopes as shown in the drawing and if water is met within the excavation due to springs, seepage, rain and other causes it shall be removed by the suitable divertion pumping or bailing out and excavation shall be kept dry whereever so required by the contractor at his own cost as directed by the Engineer-in-charge and disposal of all surplus excavated soil in acquired width or at an approved dumping side including its stacking leveling dressing in all leads and lifts by head-load, mechanical transportation or by any other mode of transportation with all cost of labours, machinaries and other incidentals to complete the work as per HPPWD specification 1990 Vol.I. Any loss to the public and private property during the course of execution and disposal of unserviceable material shall be absolute responsibility of the contractor which shall have to be compensated by him in all cases.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 62.11 | Per running metre | 334.2 | ₹20,757.16 |
| 4.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in foundation, footing, basis of columns etcetera and mass concrete including carriage of material within all leads,lifts and other incidentals as per the direction of the engineer-in -charge.The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 316.4 | Per Square metre | 277 | ₹87,642.8 |
| 5.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Columns, pillars, posts and struts square rectangular or polygonal in plan including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 398.64 | Per Square Metre | 702.7 | ₹2,80,124.33 |
| 6.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Beams, cantilever, girders and lintels. Sides and soffits of beams, beam haunchings, cantilevers, bressumers and lintels upto all depth and in all heights from floor including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 595.28 | Per Square Metre | 544.1 | ₹3,23,891.85 |
| 7.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Flat surfaces such as soffits of suspended floors, roofs, landings and the like floor etcetera upto any thickness including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 357.66 | Per Square Metre | 672 | ₹2,40,347.52 |
| 8.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling and removal of the same for insitu-reinforced concrete and plain concrete work in Stair cases with sloping or stepped soffits excluding landing including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 29.34 | Per Square Metre | 578.4 | ₹16,970.26 |
| 9.01 | Providing form work with steel plates 3.15 mm (three point fifteen millimetre) thick welded with angle iron in frame 30 X 30 X 5 mm (thirty into thirty into five millimetre) so as to give a fair finish including centring, shuttering, strutting and propping etcetera with wooden battens and ballies, in all heights of propping and centring below supporting floor to ceiling upto any heights and removal of the same for insitu-reinforced concrete and plain concrete work in Edges of slabs and breaks in floors and walls upto all width and heights including carriage of material within all leads, lifts and other incidentals as per the direction of the engineer-in -charge. The rate is including the octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government. | 169.6 | Per Running metre | 164 | ₹27,814.4 |
| 10.01 | Providing and laying in position machine batched and machine mixed cement concrete work of grade M-25 (twenty five) design mix to obtain the compressive strength of 25N/mm square ( twenty five newton per square millimetre ) for reinforced cement concrete work, in all work up to plinth level using minimum cement content not less than 360 KG/Cum (Three hundred sixty kilogram per cubic metre) or as per approved design mix to give a smooth surface mechanically mixed and vibrated including curing complete and pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability for reinforced concrete work including carriage of material within all leads ,lifts and other incedental as per specification approved drawing design and as per direction of Engineer-in-charge.The rate is including octroi, royality, Malkana, toll tax, GST and any other taxes imposed by the Government . | 133.09 | Per Cubic metre | 9,940.3 | ₹13,22,954.53 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_206461.xls
BOQ • 0.38 MB
Biddoument.pdf
Tender Documents • 5.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .