| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.0 LAccepted-AOC | ₹77.0 L Quoted ₹81.3 L | L1 | Accepted-AOC The lowest and negotiated bidder M/s. AMD Engineering construction, Krishnagiri is accepted by the Chief Engineer PWD, Coimbatore Region, Coimbatore Letter No. HDO/ DB/ F.11(SLM )/ 2025/ dt.25.09.2025 |
| 2 | L2₹83.7 L+₹2.4 L (2.96%)Rejected-AOC | ₹83.7 L+₹2.4 L (2.96%) | L2 | Rejected-AOC Other than lowest tenderer |
| 3 | L3₹85.1 L+₹3.8 L (4.69%)Rejected-AOC | ₹85.1 L+₹3.8 L (4.69%) | L3 | Rejected-AOC Other than lowest tenderer |
| Sl No | Description | Qty | Unit | A.Alagesan L3 | Karpaga Vinayagar Engineer Construction L2 | AMD engineering construction L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away and carefully stacking materials useful for RCC etc., Complete | 1.25 | M³ | 4,743 ₹5,928.75 | 4,665 ₹5,831.25 | 4,395 ₹5,493.75 Lowest |
| 2.00 | Dismantling, clearing away and carefully stacking materials useful for Brick / stone masonry in Cement mortar walls under 3m hight etc., Complete | 12 | M³ | 311 ₹3,732 | 306 ₹3,672 | 288 ₹3,456 Lowest |
| 3.00 | Dismantling, clearing away and carefully stacking materials useful for Pressed tiles & weathering course etc., Complete | 87.1 | M³ | 51 ₹4,442.1 | 50 ₹4,355 | 47 ₹4,093.7 Lowest |
| 4.00Brick work in following Cement Mortar 1:6 using best quality Burnt Clay Brick of size 9” x 4-3/8” x 2¾” with class designation of 7.5 conforming to IS 1077-1992 including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 4.01 | For Superstructure in First Floor | 13 | M³ | 8,367 ₹1,08,771 | 8,229 ₹1,06,977 | 7,754 ₹1,00,802 Lowest |
| 4.02 | For Superstructure in Second Floor | 51.5 | M³ | 8,559 ₹4,40,788.5 | 8,418 ₹4,33,527 | 7,932 ₹4,08,498 Lowest |
| 4.03 | For Superstructure in Third Floor | 27.5 | M³ | 8,753 ₹2,40,707.5 | 8,609 ₹2,36,747.5 | 8,111 ₹2,23,052.5 Lowest |
| 5.00 | Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 181 | M² | 1,170 ₹2,11,770 | 1,151 ₹2,08,331 Lowest | 1,200 ₹2,17,200 |
| 6.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) , etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 236 | M² | 1,468 ₹3,46,448 | 1,444 ₹3,40,784 Lowest | 1,500 ₹3,54,000 |
| 7.00 | Supplying and erecting steel centering including necessary supports For plane surfaces such as rectangular or square RCC columns etc. which require only nominal strutting using mild steel sheets made of 10 gauge thick welded with MS angle size 40mm x 40mm x 5 mm and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick).etc..complete in all floors complying with standard specifcation. Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 216 | M² | 653 ₹1,41,048 | 642 ₹1,38,672 | 605 ₹1,30,680 Lowest |
Tender Value
₹77.3 L
EMD Value
₹49,000
Closing Date
18 Aug 2025, 3:00 pmClosed
The Superintending Engineer PWD
Buildings C and M Circle Salem
Construction of 4 Class rooms in Government Higher Secondary School Under NABARD RIDF XXXI for the year 2025-26 at Anchetty in Krishnagiri District.
2025_PWD_584322_1
21/3/2025-26
Open Tender
Civil Works - Buildings
Lump-sum
150 days
Anchetty in Krishnagiri District
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹49,000
6 Nov 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_698110.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .