Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 302 APOLLO ARCADE APOLLO ARCADE 7819 AHMEDABAD GUJARAT 380061 | AHMADABAD | GUJARAT | 380061 | ₹1.2 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹1.2 Cr
EMD Value
₹2.5 L
Closing Date
26 May 2022, 5:00 pmClosed
R.Nagender Singh
XEN(E)
Construction of Govt. Unani College and Hospital at village Akera, Nuh _Mewat(Pdg. Lift in Hospital building and houses only)
2022_HRY_218740_2
PWD/HRY/APR-006
Open Tender
Electrical Works
Works
90 days
XEN(E)
Refer DNIT
2 documents required · 2 mandatory
₹15,000
₹2.5 L
3 Nov 2023
17 May 2022
27 May 2022
17 May 2022
26 May 2022
17 May 2022
Amount
Supply, erection ,testing and commissioning of electric traction passenger elevator of OTIS / KONE / MITUSUBHSHI / KINETIC HYUNDAI / SCHINDLER / HITACHI / JOHNSON / ORBIS make suitable for 20 persons (1360 kg. weight) having speed @ 1meter per second to travel from ground floor + 3 upper floors with 4 stops,4 opening with ARD system and full height infra red safety and as per technical specifications attaced, upto the entire satisfaction of the Engineer -in- charge of work.
Supply, erection ,testing and commissioning of electric traction passenger elevator of OTIS / KONE / MITUSUBHSHI / KINETIC HYUNDAI / SCHINDLER / HITACHI / JOHNSON / ORBIS make suitable for 8 persons (544 kg. weight) having speed @ 1meter per second to travel from ground floor + 3 upper floors with 4 stops,4 opening with ARD system and full height infra red safety and as per technical specifications attaced, upto the entire satisfaction of the Engineer -in- charge of work.
Supply, erection ,testing and commissioning of electric traction passenger elevator of OTIS / KONE / MITUSUBHSHI / KINETIC HUNDAI / SCHINDLER / HITACHI / JOHNSON / ORBIS make suitable for 13 persons (884 kg. weight) having speed @ 1meter per second to travel from ground floor + 3 upper floors with 4 stops,4 opening with ARD system and full height infra red safety and as per technical specifications attaced, upto the entire satisfaction of the Engineer -in- charge of work.
For 1st year after guarantee and free mtc. period
For 2nd year
For 3rd year
For 4thyear
For 5thyear
For 6thyear
For 7thyear
For 8th year
For 9th year
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .