Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC MOB BAJDAARIPURA DISTRICT BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L1 | Accepted-AOC LOWEST RATE BIDDER | |
| 2 | L2₹18.0 L+₹6,333.30 (0.35%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE BIDDER | |
| 3 | L3₹18.6 L+₹65,609.30 (3.67%)Rejected-Finance 205L MODEL TOWN LUDHIANA | LUDHIANA | LUDHIANA | PUNJAB | L3 | Rejected-Finance HIGH RATE BIDDER | |
| 4 | L4₹20.9 L+₹3.0 L (16.6%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE BIDDER |
Tender Value
₹20.8 L
EMD Value
₹42,000
Closing Date
22 Oct 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE SNK 4 BAHRAICH
OFFICE OF THE EE SNK 4 BAHRAICH
Construction of D.R.B. cum fall at Km. 4.320 of Arnahwa Minor.
2020_UPIDC_510957_16
02/EE/SNK-4/2020-21
Open Tender
Civil Works
Item Rate
90 days
ARNAHWA BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
EE SNK 4
₹42,000
16 Jan 2021
17 Oct 2020
22 Oct 2020
17 Oct 2020
22 Oct 2020
17 Oct 2020
90 days
Amount
E/W in digging foundation in all type of soil including all lead, lift and back filling and disposal of surplus earth for proper completion of work.
Laying plain cement concrete in 1:3:6 in foundation with 20 to 40 mm size crushed kabrai stone ballast & hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T & P etc. With manual compaction required for proper completion of work.
1st Class brick work in 1:4 C.M. with hamirpur coarse sand of F.M not less than 2.0 including all taxes, cost of all material, labour and T&P. required for proper completion of work.
Centering & shuttering for C.C. and R.C.C work upto 10 m span including all taxes, cost of all material labour and T&P. etc. required for proper completion of work.
2 Coats of bitumen painting with 2 layers of Tarfelt again followed by 2 Coats of bitumen painting before laying R.C.C slab including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
Cutting, bending, binding & placing of Steel reinforcement in proper position including all taxes, cost of binding wire, steel, labour and T&P. etc. required for proper completion of work.
S/F 20 mm thick Joint filler board in construction joint including all taxes, cost of material, labour and T&P. etc. required for proper completion of work.
Laying R.C.C. 1:1½ :3 using 4.75 mm to 20 mm size crushed Kabarai stone grit with Hamirpur coarse sand having F.M not less than 2.0 including all taxes, cost of all material, labour & T&P etc. except steel. with Mechanical compaction required for proper completion of work.
Cement Pointing (Struck deep) in 1:2 CM with Hamirpur fine coarse sand including all taxes, cost of all material, labour & T&P. required for proper completion of work.
E/W in embankment in making road diversion in all type of soil including all leads, lifts, royalty with proper dressing & mechanical compaction for proper completion of work.
E/W in embankment in making ramp in all type of soil including all leads, lifts, royalty with proper dressing & compaction for proper completion of wor
S.O.B. Brick on edge soling on diversion/ramps including preperation of subgrade and filling joints with local sand including all taxes, cost of all labour and T&P. required for proper completion of work.
Dewatering with all cost of power, P.O.L., machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work.
Laying C.C. 1:2:4 using 4.75 mm. to 20 mm. size crushed kabrai stone grit with Hamirpur coarse sand and having F.M. not less than 2.0. including all taxes, cost of all material, labour, T&P etc. with mechanical compaction required for proper completion of work.
S/F Wheel guard stone including cost of all material, labour & T&P. by manufacturing at site including all taxes, cost of all material, labour and T&P etc.required for proper completion of work.
M/S SHRI BALA JI CONSTRUCTION
M/S S K CONSTRUCTION COMPANY
Jabir Khan
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .