Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2481 CrAccepted-AOC 756 TITAGARH TOWERS ANANDAPUR E M BYPASS ANANDAPUR KOLKATA WEST BENGAL 700107 | KOLKATA | WEST BENGAL | 700107 | ₹2481 Cr | L1 | Accepted-AOC Lowest Cost L1 |
| 2 | L2₹2994.0 CrRejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹2994.0 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | TITAGARH RAIL SYSTEMS LIMITED | Larsen & Toubro Limited |
|---|---|---|---|---|---|
| 1.00DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT OF LINE 5 (Phase 1 – KAPURBAWADI - KASHELI - DHAMANKAR NAKA & Phase 2 -DHAMANKAR NAKA - BHIWANDI- KALYAN APMC) OF MUMBAI METRO RAIL PROJECT OF MMRDA INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD | |||||
| 1.01 | WLC NPV COST | 1 | LS | 24,81,00,00,000 ₹2481 Cr | 29,94,00,08,344 ₹2994.0 Cr |
| 1.02 | Specific Energy Cost in Whr/GTKM | 1 | Whr/GTKM | - | 50 ₹50 |
Tender Value
₹2640.7 Cr
EMD Value
₹10 L
Closing Date
12 Dec 2024, 3:00 pmClosed
CE
1ST FLOOR, SYSTEM UNIT, METRO PIU, A WING, OLD MMRDA BLD
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF ROLLING STOCK CBTC TELECOMMUNICATION PSD AND DEPOT M AND P OF LINE 5 Phase 1 AND Phase 2 OF MMRDA INCLUDING 15 YEARS OF CMC PLUS 2 YEARS OF DLMP
2024_MMRDA_1015127_1
CA 241
Open Tender
Electrical and Maintenance Works
MUMBAI
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹10 L
MMRDA BKC
10 Nov 2025
26 Feb 2024
13 Dec 2024
26 Feb 2024
12 Dec 2024
26 Feb 2024
26 Feb 2024 - 15 Apr 2024
22 Mar 2024
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT OF LINE 5 (Phase 1 – KAPURBAWADI - KASHELI - DHAMANKAR NAKA & Phase 2 -DHAMANKAR NAKA - BHIWANDI- KALYAN APMC) OF MUMBAI METRO RAIL PROJECT OF MMRDA INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD
WLC NPV COST
Specific Energy Cost in Whr/GTKM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid