Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2481 CrAccepted-AOC 756 TITAGARH TOWERS ANANDAPUR E M BYPASS ANADAPUR KOLKATA WEST BENGAL 700107 | KOLKATA | WEST BENGAL | 700107 | L1 | Accepted-AOC Lowest Cost L1 | |
| 2 | L2₹2994.0 Cr+₹513.0 Cr (20.7%)Rejected-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not Eligible |
| Sl No | Description | Qty | Unit | TITAGARH RAIL SYSTEMS LIMITED | Larsen & Toubro Limited |
|---|---|---|---|---|---|
| 1.00DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT OF LINE 5 (Phase 1 – KAPURBAWADI - KASHELI - DHAMANKAR NAKA & Phase 2 -DHAMANKAR NAKA - BHIWANDI- KALYAN APMC) OF MUMBAI METRO RAIL PROJECT OF MMRDA INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD | |||||
| 1.01 | WLC NPV COST | 1 | LS | 24,81,00,00,000 ₹24,81,00,00,000 Lowest | 29,94,00,08,344 ₹29,94,00,08,344 |
| 1.02 | Specific Energy Cost in Whr/GTKM | 1 | Whr/GTKM | - | 50 ₹50 Lowest |
Tender Value
₹2640.7 Cr
EMD Value
₹10 L
Closing Date
12 Dec 2024, 3:00 pmClosed
CE
1ST FLOOR, SYSTEM UNIT, METRO PIU, A WING, OLD MMRDA BLD
DESIGN MANUFACTURE SUPPLY INSTALLATION INTEGRATION TESTING AND COMMISSIONING OF ROLLING STOCK CBTC TELECOMMUNICATION PSD AND DEPOT M AND P OF LINE 5 Phase 1 AND Phase 2 OF MMRDA INCLUDING 15 YEARS OF CMC PLUS 2 YEARS OF DLMP
2024_MMRDA_1015127_1
CA 241
Open Tender
Electrical and Maintenance Works
Lump-sum
MUMBAI
Please refer Tender documents.
8 documents required · 8 mandatory
₹11,800
₹10 L
MMRDA BKC
10 Nov 2025
26 Feb 2024
13 Dec 2024
26 Feb 2024
12 Dec 2024
26 Feb 2024
26 Feb 2024 - 15 Apr 2024
22 Mar 2024
DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, INTEGRATION, TESTING AND COMMISSIONING OF ROLLING STOCK, COMMUNICATION BASED SIGNALLING & TRAIN CONTROL, TELECOMMUNICATION, PLATFORM SCREEN DOORS AND DEPOT MACHINERY & PLANT OF LINE 5 (Phase 1 – KAPURBAWADI - KASHELI - DHAMANKAR NAKA & Phase 2 -DHAMANKAR NAKA - BHIWANDI- KALYAN APMC) OF MUMBAI METRO RAIL PROJECT OF MMRDA INCLUDING 15 YEARS OF COMPREHENSIVE MAINTENANCE AFTER 2 YEARS OF DEFECT LIABILITY MAINTENANCE PERIOD
WLC NPV COST
Specific Energy Cost in Whr/GTKM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .