Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Registration card not valid |
Tender Value
₹2 L
Closing Date
6 Dec 2021, 4:30 pmClosed
Er Madan lal chadgal
EXECUTIVE ENGINEER REW RAMBAN
AS PER NIT
2021_RDPR_149887_9
e NIT NO 22 of REW B2v3 Dt.24.11.2021
Open Limited
Civil Works
Item Wise
30 days
RAMBAN DISTRICT
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER REW RAMBAN
Exempted
10 Dec 2021
25 Nov 2021
7 Dec 2021
25 Nov 2021
6 Dec 2021
25 Nov 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 mtr in width ) and for shafts , wells, cesspits and the like not exceeding 10sqm on plan, depth upto1.5 mtr including disposal of excavated earth up to 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kind of soil 90% and 10% soft rock
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering .All work up to plinth level . 1:5:10 ( 1 cement :5 fine sand :10 graded stone aggregate 40 mm nominal size ) Nallah.
REINFORCED CEMENT CONCRETE Provinding and laying in position, specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing and reiforcement. All work up to plinth level. 1:2.4 (1 cement:2 coarse sand :4 graded stone agg. 20 mm nominal )
1:3:6 with 30% boulders.( 1 cement :3coarse sand :6 graded stone aggregate 20 mm nominal size) Crushed
REINFORCED CEMENT CONCRETE Provinding and laying in position, specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing and reiforcement. All work up to plinth level. 1:1.5:3 (1 cement:1.5 coarse sand :3graded stone agg. 20 mm nominal )
STEEL REINFORCEMENT Reinforcement for RCC work including straightening,cutting bending, placing in position and binding all complete upto plinth level Thermo Mechanical Treated bars.
Centring and shuttering including strutting propping etc. and removal of form for :- Foundations, footings, bases of columns etc for mass concrete
Centring and shuttering including strutting propping etc. and removal of form for :- Edges of slabs and breaks in floors and wallsabove 20cm wide
SADDAM HUSSAIN
TARIQ HUSSAIN MALIK
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .