Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹61.3 LAccepted-AOC | ₹61.3 L | 1 | Accepted-AOC 1 |
| 2 | 2₹65.3 L+₹4.0 L (6.56%)Rejected-Finance VILLAGE AND POST SINDURIYA THANA KOTWALI DISTRICT MAHARAJGANJ UTTAR PRADESH | SINDURIYA | MAHARAJGANJ | UTTAR PRADESH | ₹65.3 L+₹4.0 L (6.56%) | 2 | Rejected-Finance 2 |
| 3 | 3₹75.0 L+₹13.7 L (22.3%)Rejected-Finance GRAM BELBHARIYA KARMAHI JANPAD MAHARAJGANJ | BELBHARIYA KARMAHI | MAHARAJGANJ | UTTAR PRADESH | ₹75.0 L+₹13.7 L (22.3%) | 3 | Rejected-Finance 3 |
| 4 | 4₹81.6 L+₹20.3 L (33.2%)Rejected-Finance 0 0 BELTAR BELTAR MIRZAPUR UTTAR PRADESH 231001 | MIRZAPUR | UTTAR PRADESH | 231001 | ₹81.6 L+₹20.3 L (33.2%) | 4 | Rejected-Finance 4 |
Tender Value
₹88.9 L
EMD Value
₹6.5 L
Closing Date
30 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of Vikas Khand Siswa ke Gram Panchayat Harkhpura tola Hadtodahiya Bhatthe tak link road under Rajya Sadak Nidhi Yojana Year 2025-26 in District Mahrajganj 5 Year Maintenance Lot No 01 of 01
2026_CEGKP_1126268_1
1998/33Com-Gkp Circle/2026 Dated 16-03-2026
Open Tender
Civil Works
Percentage
180 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6.5 L
5 Jun 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Embankment with approved Material Obtained from Borrow Pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 As per MORD Specification & Sr. No. 301.5, 3.4 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | |||||
| 2Providing, laying and spreading Material on a prepared sub grade, added OPC Cement @ 2% by weight to the spread material, maunually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub base. As per MORD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty But GST will be paid extra as applicable) | |||||
| 3Providing, laying and spreading Material on a prepared sub Base, added OPC cement @ 4% by weight to the spread Material, manually mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base. As per MORD Specification complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty But GST will be paid extra as applicable) | |||||
| 4Tack Coat Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom, as per MORD Sr. No. 5.2(ii) and Technical Specification Clause 503 Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | |||||
| 520mm. Thick open-graded premix carpet 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per MORD Sr.No. 5.9 Case I(I) and Technical Specification & Sr. 508. Case - I By Manual Means (I) Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | |||||
| 6Seal Coat Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per MORD Sr.No. 5.12 By Manual Case-III-Type c(I) and Technical Specification & Sr. 510 A. By Manual Means Bitumen (S-90) Including cost of Bitumen (Including Labour Cess but GST will be paid extra as applicable) | |||||
| 7Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2. As per MORD Specification & Sr. No. 301.1, 3.14 complete in all respect as per directions of Engineer in charge. (Including Labour Cess & Roylty but GST will be paid extra as applicable) | |||||
| 8Excavation of foundations in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling. Watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplush earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. As per PWD Specification & S.I.No. 251. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) | |||||
| 8.01 | Cement concrete with 4 cm gauge approved stone ballast approved coarse sand and cement in propertion of 8:4:1 including supply of all material labour and T&P etc. required for completion of the work. As per PWD Specification & S.I.No. 275. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) | - | Cum | - | - |
| 8.02 | Class 150 Sub Class "A" brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials labour and T&P etc. required for the proper completion of the work. As per PWD Specification & S.I.No. 305. complete in all respect as per directions of Engineer in charge. (Including Labour Cess but GST will be paid extra as applicable) | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.08 MB
Tendernotice_2.pdf
PDF • 0.68 MB
1998pdm.pdf
Tender Documents • 4.06 MB
BOQ_2100180.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .