Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted for Financial Opening |
| 2 | Accepted-Technical 61 DANDA KHUDANEWALA NEAR GAS GODAM SAHASTRADHARA ROAD DEHRADUN 248001 | DEHRADUN | UTTARAKHAND | 248001 | Accepted-Technical Accepted for Financial Opening |
| 3 | Accepted-Technical | Accepted-Technical Accepted for Financial Opening |
| 4 | Accepted-Technical U26A 1 DLF PHASE 3 WHITE TOWN HOUSES DLF PHASE 3 GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | Accepted-Technical Accepted for Financial Opening |
| 5 | Rejected-Technical | Rejected-Technical Closing dt nd time of submission of hard copy is 24 Aug 2026 at 1500 hrs. Hard copies has been recvd. In office dt. 28 Aug 2026 at 1420 hrs. hence not accepted as per NIT clause 1 (h) and (o) of NIT. |
Tender Value
₹53.3 L
EMD Value
₹1.1 L
Closing Date
21 Aug 2026, 3:00 pmClosed
CCE R N D ESTATES NORTH CHANDIGARH
CCE R N D ESTATES NORTH M-1026 Sector- 29A, Chandigarh - 160030
MAINTENANCE INCLUDING DAY TO DAY OPERATION OF EM INSTALLATION AND HVAC SYSTEM FOR LINEAR ACCELERATOR FACILITY LINAC AND CLEAN ROOM FACILITY OF VAJRA LABORATORY AT RAMGARH
2026_DRDO_921099_1
CCE(EN)/CHD/OM-05 /VAJRA-RMG/26-27/9304
Open Tender
Miscellaneous Works
Percentage
365 days
Ramgarh
All agencies enlisted DCWnE under Composite Class-IV, Class-III, Class-II, Class-I, Class-I(A), Class-I(AA), Class-I(AAA), Class-I(Super) and Estate Management and Maintenance (DRDO - 2024) BIM-IV, BIM-III, BIM-II, BIM-I class as per Appx C of NIT
5 documents required · 5 mandatory
₹0
₹1.1 L
CCE R N D ESTATES NORTH CHANDIGARH
21 Sept 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
21 Aug 2026
14 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part - A (PERCENTAGE TO BE QUOTED ON THIS AMOUNT ONLY WHICH IS INCLUSIVE OF CP&OH)
"Maintenance including Day to Day Operation of E/M installation and HVAC System for Linear Accelerator Facility (LINAC) and Clean Room Facility of Vajra Laboratory at Ramgarh" by providing following Manpower :-
(i) Engineer (Highly Skilled) - 01 Nos
(ii) Electrician Cum HVAC Operator (Skilled) - 03 Nos
(iii) HVAC Operator (Skilled) - 02
(iv) Electrician / DG Set Operator (Skilled) - 01
(v) Support Staff (Un Skilled) - 04 Nos
Total - 11 Nos
Operation and Maintenance of Equipment/ Installation at Site and provision of maintenance services by positioning required manpower as per the scope of work (Refer Appendix-A of NIT) for 12 (Twelve) Months and as per direction of Engineer-in-Charge. The following points mentioned under "Note" from Sl No. (i) to (iiii) shall be considered while quoting the rate (Refer Appendix-B of NIT for details).
NOTE:
(i) The estimated cost is inclusive the following:-
(a) The Current Minimum Fair Wages of the above Manpower (Refer to Letter No. F. No. 1/6(3)/2025-LS-II of office of Chief Labour Commissioner (C), Dated : 30 Mar 2026).
(b) EPF (Employer’s share only) – 13.00% (But not on more than ceiling limit of wages prescribed by EPFO i.e, presently restricted to Rs 15000/-)
(c) ESI (Employer’s share only) – 3.25% (only for employees whose total monthly wages is less than or equal to </=Rs 21000/-). For employees having salary more than Rs. 21,000/- per month Group Health Insurance shall be provided out of CP & OH being quoted by contractor.
(e) Bonus @ 8.33% per month (only for employees whose total monthly wages is less than or equal to </=Rs 21000/-)
(ii) The bidder shall quote (%) percentage above : More than or equal to 5% (Five) percent charges (upto two decimal) over estimated cost of tender for services charges/contractor profit and overhead. If the bidder/firm quotes less than 5% charges, the bid shall be treated as unresponsive and will not be considered for acceptance. No representation in this regard will be entertained.
(iii) However, Only the actual variation in VDA (Increase / Decrease) during contract period and extended period as applicable as notified by Chief Labour Commissioner, Ministry of Labour and Employment, Govt. of India shall be paid seperately as per actual alongwith associated EPF/ESI and Applicable GST on above increased amounts.
(iv) Any variation in the above elements promulgated by the government from time to time shall be paid or deducted accordingly. | 12 | Months | 2,81,075.94 | ₹33,72,911.28 |
| 1.01 | GST @18% on Part - A amount of Rs. 33,72,911.28 | 12 | Months | 50,593.67 | ₹6,07,124.04 |
| 2 | Part - B (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)
Uniform and Accessories: Two sets of normal Uniforms (Shirt & Trouser duly engraved name of particular company on the left pocket of Shirt as approved by Estate Manager) to each and every manpower including Shoes/Boots/Protective Gear/Gloves and winter clothing etc. as applicable to all O&M Staff @ Rs 4720.00 per annum per head.
NOTE:
i) The amount will be reimbursed/ paid against actual expenditure made (restricted to the estimate amount on not exceedable basis) on submission of paid vouchers submitted by contractor of payments duly defaced by Engineer-in-charge / Project Manager to the con-cerned authorities.
ii) The Amount is inclusive of CP & OH, GST@18% will be paid i.e. Rs. 4720.00 Refer Appendix - B. | 11 | Per Person | 4,720 | ₹51,920 |
| 3 | Part - C : Maintenance of E/M Assets at Ramgarh through AMC (Non-Comprehensive AMC) (PERCENTAGE NOT TO BE QUOTED ON THIS AMOUNT)
Brief scope :The annual maintenance contract covers regular servicing, periodical checks to all components, greasing / lubrication to all parts, rectification / tightening of all electrical connections, replacement of gasket and oil seal, and including cleaning and dusting of all components complete all as directed by Engineer-in-Charge to keep the equipment in functional condition. Services further included are complete servicing, replacement of defective /damaged parts, expert assistance for non-performing systems, maintenance scheduling, and annual calibration by carrying General Servicing and maintenance as per standard practices/guidelines to keep the system functional. The modalities would include attending the complaints / breakdowns as and when arisen , repair / replacement of consumables as required for smooth operation of the system. Payment of consumables will be made as per terms and conditions given in the BOQ.
AMC would typically cover entire original / extended contract period and will include regular maintenance visits, labour, etc. Annual maintenance contracts include Monthly / Quarterly preventive maintenance and breakdown maintenance as and when required as per periodicity. Only original spare parts as per approved make list duly approved by Estate manager will be permitted to be used for the maintenance during the entire contract Period. The agency shall have to do agreement with OEM / authorised vendor of OEM / any expert agency approved by CCE (R&D) Estates North Chandigarh based on recommendations of Estate Manager within One (01) month from the date of issue of LOI.
Periodical Checks has to be carried out by Service Engineer of OEM / OEM authorised Vendor /any Expert Agency as approved by CCE(R&D) Estates North based on recommendations of Estate Manager. The Service Engineer will visit once every 03 months (Quarterly) and as and when required for attending breakdown calls and will submit the service report duly signed by stake holders including recommendations / repairs / replacements of any components if required (The rates in the BOQ are inclusive of periodic visit of Service Engineer as referred above). The OEM/OEM authorised system engineer shall inspect quarterly starting 1st month of commencement of contract.
( Continued in 3.001 to 3.018 ) | 1 | Per Annum | 3,77,160.1 | ₹3,77,160.1 |
| 0.999 | 24 TR cap Air cooled water Chilling Machine -02 Nos
company - soft hard automation pvt. Ltd. Pune-43
model No. - MCPACD0L022-V2
capacity - 22 TR A/C
Sr . No. 18/VLSC/12k7-18
Compressor 1 - company (make) - danfoss
Model No. SM18554RC Sr. No. KD2504281103
Compressor 2
Model No. SM18554RC Sr. No. TD251152124
b) 24 TR cap Air cooled water Chilling Machine
company - soft hard automation pvt. Ltd. Pune-43
model No. - MCPACD0L022-V2
capacity - 22 TR A/C
Sr . No. 33/VLSC/2k7-24
Compressor 1 - company (make) - danfoss
Model No. SM18554RC Sr. No. GC2503100445
Compressor 2
Model No. SM18554RC Sr. No. FG2502914493 | - | - | - | - |
| 0.999 | Air Handling Units of 36 TR, 20000 CFM with 8 KV strip heater-01 Nos
Company : ZECO Aircon industries P. Ltd.
Model No. ZDAW-200
Sr. No. 724 101
Three phase indetion motor - A.H,V 25 HP Air Qty.CFM 20,000
Fan Model - BDB-710
pre heater 6 qty 3 kw per heater
after heater 6 qty per heater 3 kw
water Pump - 1.0 HP, Make crompton | - | - | - | - |
| 0.000 | Mono Block Pump Set of 50- USGPM at 20 M HeadCompany - 02 Nos
kiloskar borhters ltd.
Model No. KD5225
H. P -5
Sr. No. A7APXAT671
Head 22.0 m
Model No. KDSs 225
HP - 5
Sr. No. A8AFXE0436
Head - 220 M | - | - | - | - |
| 0.000 | Electrical LT Panel- HVAC -01 Nos
Make - Impact electric
main incomer -
400 Amp -1
Out Going -
125 Amp - 3
100 Amp - 2
63 Amp - 3
32 Amp - 2 | - | - | - | - |
| 0.999 | LINAC TBRL Range Ramgarh | - | - | - | - |
| 0.999 | Main LT panel -01Nos
Incomer
MCCB Incomer 400 A - 02
Outgoing
MCCB 250 A - 01
MCCB 160A - 05
MCCB 125 A - 02
MCCB 100 A - 06
AMF Reley - Make procon - 01 | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
GCC2023.pdf
Additional Documents • 5.78 MB
MFW.pdf
Additional Documents • 0.45 MB
BOQ_967964.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .