| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 443 V P O LIWAN 132001 | KARNAL | HARYANA | 132001 | ₹1.3 L | L1 | Accepted-AOC Lowest Rates |
| 2 | L2₹1.5 LRejected-Finance PIPALTHA ROAD VPO UJHANA TEHSIL NARWANA DISTT JIND 126116 | UJHNA | JIND | HARYANA | 126116 | ₹1.5 L | L2 | Rejected-Finance Financially Evaluated by Committee |
| Sl No | Description | Qty | Unit | RAM MEHAR CONTRACTOR L2 | KRISHAN KUMAR L1 |
|---|---|---|---|---|---|
| 1.00Works Details | |||||
| 1.10 | Job work for scraping of Filter Media Top Layer upto 1/2 inch for per month and placing the same after the cleaning and washing and all other works contingents thereto. | 32.79 | Per Cum | 455 ₹14,919.45 | 350 ₹11,476.5 Lowest |
| 2.00 | Repair and maintenance of all electrical equipment except Pumping Set i.e. Tube light, Street Light, Fan, Flood Light, Switches, Socket, wiring, Capacitors, Volt Meter, Ampere meter, Light Indicator, CT/PT and all other works Contingents thereto. | 6 | Per Month | 1,300 ₹7,800 | 1,200 ₹7,200 Lowest |
| 3.00 | Repair and maintenance of existing inlet channel including watch and ward, de-silting from existing hodies and Channel, detecting/removing blockage, repair the joint as per PHE Norm and all other work contingents thereto. | 103.5 | Per Metre | 8.45 ₹874.57 | 7.5 ₹776.25 Lowest |
| 4.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 100/110 mm AC Pipe per meter | 43,560 | Per Month | 0.04 ₹1,742.4 Lowest | 0.04 ₹1,742.4 Lowest |
| 5.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 100/110 mm DI Pipe per meter | 10,050 | Per Month | 0.51 ₹5,125.5 | 0.44 ₹4,422 Lowest |
| 6.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 150 mm AC Pipe per meter | 15,480 | Per Month | 0.04 ₹619.2 Lowest | 0.04 ₹619.2 Lowest |
| 7.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 150 mm DI Pipe per meter | 5,652 | Per Month | 0.73 ₹4,125.96 | 0.63 ₹3,560.76 Lowest |
| 8.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 200 mm AC Pipe per meter | 13,710 | Per Month | 0.06 ₹822.6 Lowest | 0.06 ₹822.6 Lowest |
| 9.00 | Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 75/80 mm AC Pipe per meter | 46,320 | Per Month | 0.03 ₹1,389.6 Lowest | 0.03 ₹1,389.6 Lowest |
Tender Value
₹1.2 L
EMD Value
₹2,330
Closing Date
8 Jan 2026, 3:00 pmClosed
ADARSH KUMAR SINGLA
Tohana PHED
Comprehensive maintenance of water supply scheme of Village NANGAL,SARDAREWALA.(The Detail scope of work is attached in additional documents)
2026_HRY_494240_1
20264D1C98BB 75D6 4EE2 8429 EF1557D4591D585PUH
Open Tender
Civil Works
Works
180 days
NANGAL SARDAREWALA
2 documents required · 2 mandatory
₹500
₹2,330
Yes
6 Feb 2026
1 Jan 2026
8 Jan 2026
1 Jan 2026
8 Jan 2026
1 Jan 2026
1 Jan 2026 - 8 Jan 2026
Amount
Works Details
Job work for scraping of Filter Media Top Layer upto 1/2 inch for per month and placing the same after the cleaning and washing and all other works contingents thereto.
Repair and maintenance of all electrical equipment except Pumping Set i.e. Tube light, Street Light, Fan, Flood Light, Switches, Socket, wiring, Capacitors, Volt Meter, Ampere meter, Light Indicator, CT/PT and all other works Contingents thereto.
Repair and maintenance of existing inlet channel including watch and ward, de-silting from existing hodies and Channel, detecting/removing blockage, repair the joint as per PHE Norm and all other work contingents thereto.
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 100/110 mm AC Pipe per meter
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 100/110 mm DI Pipe per meter
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 150 mm AC Pipe per meter
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 150 mm DI Pipe per meter
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 200 mm AC Pipe per meter
Repair of Existing water Supply / Head Works pipe line at existing pipe line depth for leakage/Mixing including cost of Hiring of JCB for excavation work, dismantling of CC/Paver block, CID joint, Manual skilled and unskilled labour, carriage of material, loading and unloading, excavation of trenches, dewatering and refiling and restoration to existing surface/ floor the trench after repairing including cost of all required material/Specials as per site condition complete in all respect within RTS Time Limit. for 75/80 mm AC Pipe per meter
Repair of Horizontal Split Casing pumping sets for Raw Water, Clear Water in Water Works/ various Boosting Stations consisting mainly of electrical, mechanical fixtures motor, pump, electrical control panel board, starter, Main switch, CT/PT in for energy meter,MCCB, Earthing, safety protection relay, capacitor, APFS, Bus Bar, Starter oil, cable, wire and change over switch and all accessories sluice valves, non return valves, CI/DI/ GI specials, from Raw Water/ Clear Water suction well to Common Header pipe upto outside pump chamber including consumable items i.e Grease, Glain Dori, Bearing and nut bolts, tool and plants kit, Loading, Unloading carriage Up and down etc. including all appurtenances of Pumping Machinery More Then 20 BHP
Repair of Horizontal Split Casing pumping sets for Raw Water / Clear Water in Water Works and Boosting Stations consisting mainly of electrical, mechanical fixtures motor, pump, electrical control panel board, starter, Main switch, CT/PT in for energy meter,MCCB, Earthing, safety protection relay, capacitor, APFS, Bus Bar, Starter oil, cable, wire and change over switch and all accessories sluice valves, non return valves, CI/DI/ GI specials, from Raw Water/ Clear Water suction well to Common Header pipe upto outside pump chamber including consumable items i.e Grease, Glain Dori, Bearing and nut bolts, tool and plants kit, Loading, Unloading carriage Up and down etc. including all appurtenances of Pump Machinery upto 20 BHP
RAM MEHAR CONTRACTOR (BID ID -1402279)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_572682.xls
BOQ • 0.30 MB
0F5JQGZ134911.pdf
Additional Documents • 0.30 MB
OT0134911.pdf
Other Document • 0.88 MB
Download all tender documents and submit your bid