Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹63.2 LAccepted-AOC | 1 | Accepted-AOC L1 Accepted | |
| 2 | 2₹67.1 L+₹3.9 L (6.11%)Rejected-Finance | 2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | OSM CONSTRUCTIONS L1 | SRI POLINCHI AND CO L2 |
|---|---|---|---|---|---|
| 1.10Strengthening and Five Year Maintanance to the road from Thanjavur sayalkudi road to Rajendrapuram keelakudieruppu link Road Km 0/0 - 1/40 in Rajendrapuram Panchayat | |||||
| 1.20 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. | 1,499.04 | Sqm | 5 ₹7,495.2 Lowest | 7 ₹10,493.28 |
| 1.30 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 626.76 | Cum | 130 ₹81,478.8 Lowest | 135 ₹84,612.6 |
| 1.40 | PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers | 1,751.71 | Sqm | 21 ₹36,785.91 Lowest | 25 ₹43,792.75 |
| 1.50Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 1.60 | Km 0/0 - 1/0 | 562.67 | Cum | 2,424 ₹13,63,912.08 Lowest | 2,525 ₹14,20,741.75 |
| 1.70 | Km 1/0 - 1/400 | 225.6 | Cum | 2,424 ₹5,46,854.4 Lowest | 2,525 ₹5,69,640 |
| 1.80 | Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,255.13 | Sqm | 80 ₹4,20,410.4 Lowest | 95 ₹4,99,237.35 |
| 1.90 | Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,282.13 | Sqm | 18 ₹95,078.34 Lowest | 20 ₹1,05,642.6 |
| 2.00BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | |||||
Tender Value
₹64.9 L
EMD Value
₹65,000
Closing Date
21 Jan 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA PUDUKKOTTAI
Package No. 22 - Aranthangi Panchayat Union - Strengthening and Five Year Maintanance to the road from Thanjavur sayalkudi road to Rajendrapuram keelakudieruppu link Road Km 0/0 - 1/40 in Rajendrapuram Panchayat Under NABARD RIDF XXX-2024-25
2024_RDTN_515168_1
PDKT/DRDA/NABARD/22
Open Tender
Civil Works - Roads
Item Rate
180 days
ARANTHANGI BLOCK
Please refer Tender document
4 documents required · 4 mandatory
₹0
₹65,000
DRDA PUDUKKOTTAI
7 Aug 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
21 Jan 2025
30 Dec 2024
7 Jan 2025
Amount
Strengthening and Five Year Maintanance to the road from Thanjavur sayalkudi road to Rajendrapuram keelakudieruppu link Road Km 0/0 - 1/40 in Rajendrapuram Panchayat
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
PICKING old metalled/BT Surface upto. 10cm thick as directed by the deparmtnetal officers
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and fixing Name board Cum Citizen Board
Provision for sign Board
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Kilometre StoneReinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
Ordinary Kilometer Stone (Precast)
200 m stone (precast)
Construction of Toe wall
Earth work excavation in all classess of except hard rock requiring blasting with initial lead and life etc., complete for foundation as per SS 20 B
Supplying and filling in foundation and besement with Filling m-sand in layers not more 15cm thick well rammed, watered and compacted complying with standard specifications charges complete
CC 1:4: 8 mix using 40mm HBG metal including cost and conveyance labour charges etc
C.C. 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc complete for superstructure
supplying and erecting centering shuttering including for soffits of slab of plan surface including shuttering mild steel of size 90x60 cm for boarding laid 3m high using MS sheets of size 25 x 25 x 3 mm laid over w.joints of size 10 x 6.50 cm spaced 75mm c/c complying with standard specification etc.
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI POLINCHI AND CO (BID ID -1230246)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .