Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 CrAccepted-AOC SHOP NO 10 11 DISHA SQUARE SUTGIRNI CHOWK GARKHEDA AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L1 | Accepted-AOC Accept | |
| 2 | L2₹36.8 Cr+₹1.8 Cr (5.01%)Rejected-Finance 308 302 1ST FLOOR LABH CHAMBERS STATION ROAD CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | L2 | Rejected-Finance Reject | |
| 3 | L3₹37.2 Cr+₹2.2 Cr (6.17%)Rejected-Finance PLOT NO 1 2 AASHIYANA CO OP SOCIETY N 11 CIDCO AURANGABAD | AURANGABAD | AURANGABAD | MAHARASHTRA | L3 | Rejected-Finance Reject | |
| 4 | Rejected-Technical AURANGABAD MAHARASHTRA | AURANGABAD | CHHATRAPATI SAMBHAJINAGAR | MAHARASHTRA | - | Rejected-Technical Reject | |
| 5 | Rejected-Technical 515 NMS ICON PLOT NO 194 SECTOR 19 ULWE PANVEL 410206 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Wonder Construction L3 | N K Construction L1 | Hi Tech Infra, Aurangabad L2 |
|---|---|---|---|---|---|---|
| 1.00CIVIL_PART A | ||||||
| 2.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1,098.09 | Cum. | 294.43 ₹3,23,309.46 | 225.5 ₹2,47,618.39 Lowest | 236.81 ₹2,60,037.75 |
| 3.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (All Depth) By Mechanical Means | 2,127 | Cum. | 322.88 ₹6,86,765.11 | 247.3 ₹5,26,006.61 Lowest | 259.69 ₹5,52,360.11 |
| 4.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (All Depth) By Mechanical Means | 655.43 | Cum. | 610.11 ₹3,99,881.96 | 467.35 ₹3,06,313.34 Lowest | 490.77 ₹3,21,663.42 |
| 5.00 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (All Depth) By Mechanical Means | 708.9 | Cum | 1,323.62 ₹9,38,316.87 | 1,600 ₹11,34,243.2 | 1,181.73 ₹8,37,730.76 Lowest |
| 6.00 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 409.31 | Cum. | 8,616.38 ₹35,26,787.73 | 7,325.4 ₹29,98,374.13 Lowest | 7,692.59 ₹31,48,669.4 |
| 7.00 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | 1,246.3 | Cum | 153.74 ₹1,91,606.01 | 137.3 ₹1,71,116.85 | 137.28 ₹1,71,091.93 Lowest |
| 8.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including all lifts and leads watering and compaction etc. complete. | 659.17 | Cum | 917.17 ₹6,04,567.28 | 865.5 ₹5,70,508.17 Lowest | 908.91 ₹5,99,122.57 |
| 9.00 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. | 248.48 | cu.m | 1,943.7 ₹4,82,970.58 | 1,926.18 ₹4,78,617.21 Lowest | 1,926.19 ₹4,78,619.69 |
| 10.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 4,834.97 | Sqm | 78.47 ₹3,79,400.33 | 70 ₹3,38,448.11 Lowest | 77.76 ₹3,75,967.5 |
Tender Value
₹33.5 Cr
EMD Value
₹16.8 L
Closing Date
20 Nov 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Public Works (West) Division Au
Executive Engineer Public Works (West) Division Aurangabad
CONSTRUCTION OF CIVIL AND CRIMINAL COURT BUILDING AT KANNAD DIST. AURANGANAD
2023_PWR_958825_2
E TENDER NOTICE NO 30 FOR 2023-24
Open Tender
Civil Works
Item Rate
730 days
Aurangabad
CONSTRUCTION OF CIVIL AND CRIMINAL COURT BUILDING AT KANNAD DIST. AURANGANAD
3 documents required · 3 mandatory
₹3,540
₹16.8 L
CHIEF ENGINEER P W REGION AURANGABAD
15 Mar 2024
31 Oct 2023
22 Nov 2023
31 Oct 2023
20 Nov 2023
31 Oct 2023
31 Oct 2023 - 8 Nov 2023
8 Nov 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL_PART A | - | - | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material with all lifts and leads beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means | 1,098.09 | Cum. | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (All Depth) By Mechanical Means | 2,127 | Cum. | - | - |
| 4 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting etc. complete (All Depth) By Mechanical Means | 655.43 | Cum. | - | - |
| 5 | Excavation for foundation in Hard-rock by blasting including trimming and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramming etc. complete. (All Depth) By Mechanical Means | 708.9 | Cum | - | - |
| 6 | Providing and laying Cast in situ/Ready Mix cement concrete in M15 of trap/ granite/quartzite/gneiss metal for foundation and bedding / steps including steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface, only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.),with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) | 409.31 | Cum. | - | - |
| 7 | Filling in plinth and floors with approved excavated material in 15cm. to 20cm. Layers including watering and compacting etc. complete. | 1,246.3 | Cum | - | - |
| 8 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including all lifts and leads watering and compaction etc. complete. | 659.17 | Cum | - | - |
| 9 | Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. | 248.48 | cu.m | - | - |
| 10 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 4,834.97 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1671113.xls
BOQ Document • 0.85 MB
132506088.pdf
Tender Document • 0.08 MB
COURTBUIDINGB2TENDER.pdf
Tender Document • 4.34 MB
132506090.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .