Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹46.3 LAccepted-AOC CONTRACTOR SC 133 A B TYPE COLONY SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | ₹46.3 L | L-1 | Accepted-AOC As evaluated by committee for L-1 bidder Accepted |
| 2 | L-2₹48.5 L+₹2.3 L (4.87%)Rejected-Finance | ₹48.5 L+₹2.3 L (4.87%) | L-2 | Rejected-Finance As evaluated by committee |
| 3 | L-3₹51.1 L+₹4.8 L (10.5%)Rejected-Finance | ₹51.1 L+₹4.8 L (10.5%) | L-3 | Rejected-Finance As evaluated by committee |
| 4 | Rejected-Technical | - | - | Rejected-Technical The firm has not fulfilled the criteria of PQR/EMD/TC Bid (i.e. affidavit of insolvency and bankruptcy and Undertaking of successful execution of contract) and contractor also not fulfil the requirement of MSME registration as desired by this office |
| Sl No | Description | Qty | Unit | DHARMENDRA SINGH CHOUHAN L2 | SHRI DADAJI SUPPLIERS L3 | ANNAPURNA TRADERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of foundation i/c compaction to achieve dry density not less than 95% of the maximum dry density with approved roller (Vibratory) 6-10 ton or any other mechanical means i/c all labour materials equipment, tools & plants all lead lift, safeguard etc. complete as per specification drawing and as directed by the Engineer-in-charge. | 48,800 | Sqm. | 1 ₹48,800 Lowest | 18.5 ₹9,02,800 | 1 ₹48,800 Lowest |
| 2.00 | Transportation of Ash from Ash Dyke of Phase–II SSTPP, MPPGCL, Dongalia including excavation, lifting, loading and covering ash surface in vehicle with tarpaulin for transportation of pond ash, all transportation up to lead 5 Km and unloading up to designated place, stacking, including all fuel charges and overhead charges, engaged for transportation etc. complete as per MPPCB norms/ CPCB/ other statutory norms and direction of Engineer-in-charge. | 68,800 | Cum | 48 ₹33,02,400 | 20.5 ₹14,10,400 Lowest | 45 ₹30,96,000 |
| 3.00 | Ash work in filing in pits/low laying area with Ash from Ash Dyke of Phase-II i/c cleaning of borrow pit/ foundation area by uprooting of all type of vegetation, grass bushes, sapling etc. by any means and stripping of top layer of min 20 cm or such depth as decided by the Engineer-in-charge, depending upon the suitability of ash to be used for filling in pits etc. i/c disposal of all unsuitable materials outside the working zone area with all lead and lifts complete as per direction of Engineer-in-charge i/c filling in pits in layers 250 mm to 300 mm thick (compacted) i/c all lead, lifts breaking clods/ lumps watering compaction with 6 to 10 ton vibratory compactor roller etc. to achieve dry density not less than 95% standard proctor with approved mechanical means, trimming of pits to theoretical profile i/c all other incidental charges such as watering, cost of labour, equipment, T&P and materials etc. complete as per specifications, MPPCB norms, drawing and direction of Engineer-in-charge. But excluding cost excavation loading, transportation unloading of ash. Ash required shall be provided by the MPPGCL free of cost from existing Ash Dyke of Phase-II area at SSTPP. | 68,800 | Cum | 11 ₹7,56,800 | 18.6 ₹12,79,680 | 9 ₹6,19,200 Lowest |
| 4.00 | Earth work in excavation & filling in pits with approved quality of earth i/c cleaning of pit/ area by uprooting of all type of vegetation, grass bushes, sapling etc. by any means and stripping of top layer of min 20 cm or such a depth as decided by the Engineer-in-charge, depending upon the suitability of earth to be used in forming earth embankment / filling in pits etc. i/c disposal of all unsuitable materials outside the working zone area with all lead and lifts complete as per direction of Engineer-in-charge i/c loading, transportation unloading suitable/ selected and excavated earth at site in layers not exceeding 300 mm thick for forming the embankment filling pit etc. all lead, lifts breaking clods/ lumps watering compaction with 6 to 10 ton vibratory compactor roller etc. to achieve dry density not less than 95% standard proctor with approved mechanical means, trimming of pits to theoretical profile i/c all other incidental charges such as watering, cost of labour, equipment T&P and materials etc. complete as per specifications, MPPCB/CPCB/ other Statutory norms, drawings and direction of Engineer-in-charge. | 14,640 | Cum | 32 ₹4,68,480 Lowest | 49 ₹7,17,360 | 36 ₹5,27,040 |
| 5.00 | Supplying & laying in position Random Rubble Masonry (un coursed) of various sizes in works at all levels in cement sand mortar of 1:6 by volume i/c mixing mortar, laying stones, racking out joints, scaffolding, curing all labour material equipment, T&P leads & lift with provision of weep holes testing etc. all complete as per specification drawing & instruction of Engineer-in-charge. | 50 | Cum | 2,000 ₹1,00,000 Lowest | 5,060 ₹2,53,000 | 3,000 ₹1,50,000 |
| 6.00 | Videography of work of loading, transporting and unloading of pond ash at desired location including hiring of vehicle equipment for video shooting, titling, lightening, mixing, lettering, editing including cost of two color CDs of approved makes and quality etc. complete (one video clip should contain complete operation involved in one trip i.e. from excavation of ash from ash pond/ loading from silo up to spreading the same at desired end user sites i.e. Central/State Govt. owned/ privately owned mines/ queries/ filling of low lying areas) as per direction of Engineer-in-charge.
(a) Within 5 Km | 10 | Per day | 2,350 ₹23,500 Lowest | 4,100 ₹41,000 | 2,500 ₹25,000 |
| 7.00 | Shooting of still photograph outdoor and indoor of construction and other works of building, bridge, roads etc. at any distances (loading, transporting and unloading of pond ash at desired location)
(a) 5”x7 size | 100 | Nos. | 129 ₹12,900 Lowest | 3,200 ₹3,20,000 | 135 ₹13,500 |
| 8.00 | Dewatering and pumping the working area including all connecting operation required etc. complete. For cleanliness of working area by:-
(a) 5 hp to 10 hp diesel pump - | 5 | Hrs. | 170 ₹850 Lowest | 3,100 ₹15,500 | 186 ₹930 |
| 9.00 | Dewatering and pumping the working area including all connecting operation required etc. complete. For cleanliness of working area by:-
(b) 10 hp to 20 hp diesel pump - | 5 | Hrs. | 219 ₹1,095 Lowest | 3,300 ₹16,500 | 293 ₹1,465 |
| 10.00 | Excavation, transportation and spreading of average 25mm thick layer of excavated soil on the dry surface of Ash at Ash Dyke of Phase-II i/c cost of excavation, transportation up to ash dyke area, stacking of material for measurement & spreading of it all over the dry ash surface, below Pipe Rack of Phase-II and North side boundary wall of SSTPP making suitable approaches over ash, cost labour etc. complete to prevent air pollution after excavation of Ash from Ash Dyke Stage-II at SSTPP, Dongalia. | 750 | Cum | 185 ₹1,38,750 Lowest | 209 ₹1,56,750 | 195 ₹1,46,250 |
Tender Value
₹59.6 L
EMD Value
₹1.2 L
Closing Date
14 Feb 2023, 3:30 pmClosed
SE PURCHASE AND WORK SSTPP DONGALIA
THIRD FLOOR ADMIN BUILDING SE PURCHASE AND WORK SSTPP DONGALIA
Filling of Pond Ash in Depressions in BTG and BOP Area under Stage-II of SSTPP, Dongalia.
2023_MPPGC_243139_1
WT-1867
Open Tender
Civil Works - Others
Item Rate
90 days
SE PURCHASE AND WORK SSTPP DONGALIA
As per NIT
13 documents required · 13 mandatory
₹2,000
Yes
₹1.2 L
Yes
1 Nov 2025
21 Jan 2023
16 Feb 2023
21 Jan 2023
14 Feb 2023
21 Jan 2023
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .