Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC SHOP NO 10A NEW ANAJ MANDI ADAMPUR 125052 | ADAMPUR | HISAR | HARYANA | 125052 | ₹1.7 L | L1 | Accepted-AOC AS PER LOA |
| 2 | L2₹2.0 LRejected-Finance | ₹2.0 L | L2 | Rejected-Finance L-2 Agency |
Tender Value
₹1.7 L
EMD Value
₹4,000
Closing Date
30 Jan 2026, 5:00 pmClosed
Kulbhushan
Municipal Committee Nilokheri
Construction of Culvert Near Petrol Pump at Kali Mata Mandir Road in Ward No. 06, M.C. Nilokheri.
2026_HRY_498638_1
2026146BD122 05DC 4CED BED1 774553E0DC3D311ULB
Open Tender
Civil Works
90 days
Nilokheri
2 documents required · 2 mandatory
₹500
₹4,000
Yes
16 Mar 2026
23 Jan 2026
31 Jan 2026
23 Jan 2026
30 Jan 2026
23 Jan 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[11.11.2]12 mm cement plaster finished with a floating coat of neat cement of mix : 2. 1:4 (1 cement: 4 fine sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.13]Granular Sub-Base (Mix in place) Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[21.95.3]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 3. 450 mm [Through Rate]
[22.218.2]Providing and Supplying of class SN 8 structured wall Polyethylene Piping system (Pipe with online/ offline coupler and elastomeric sealing ring) with non smooth external annular corrugated and smooth internal surface (double wall) for non-pressure underground sewerage and drainage application as confirm to IS 16098 (part II):2013 including transportation, frieght charges, inspection charges, loading, unloading, complete as specified and directed by Engineer In-Charge. 2. 300 mm Internal Diameter [Through Rate]
[22.219.2]Lowering, Laying and jointing of class SN 8 structured wall (External Annular Corrugated and Smooth Internal Surface Polyethylene Piping and fitting with the help of coupler(online/ offline) attached with one end of pipes, sliding over the elastomeric sealing rubber ring placed on the specified valley of the corrugation at the spigot end, lowering the same into the trench, laying on the lower bedding (constructed at bottom of trenches) at prescribed gradient, depth and alignment, testing the water tightness of the joints, ensuring the continuity tests of specified pipe segment etc. complete as per drawing, specification and detailed engineering, including cartage of pipes and fitting etc. as per direction of Engineer-in-charge. 2. 300 mm Internal Diameter [Through Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [3km]
[3.1.2]By Mechanical Transport including loading, unloading and stacking 2. Earth [3km]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[6.43]Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_577202.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid