| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹43.7 LAccepted-AOC AT JHARIGUMTA PO TENTULIKHUNTI PS TENTULIKHUNTI DIST NABARANGPUR | ₹43.7 L | 1 | Accepted-AOC Selected in lottery |
| 2 | 1₹43.7 LRejected-AOC DALAI STREET BORIGUMMA DIST KORAPUT | BORIGUMMA | KORAPUT | ODISHA | ₹43.7 L | 1 | Rejected-AOC Not selected in lottery |
| 3 | 1₹43.7 LRejected-AOC | ₹43.7 L | 1 | Rejected-AOC Not selected in lottery |
| 4 | 1₹43.7 LRejected-AOC AT JHARIGUMTA PO TENTULIKHUNTI PS TENTULIKHUNTI DIST NABARANGPUR | ₹43.7 L | 1 | Rejected-AOC Not selected in lottery |
| 5 | 1₹43.7 LRejected-AOC AT PO MOHANTISAHI KOTAPAD DIST KORAPUT | KORAPUT | ODISHA | 763001 | ₹43.7 L | 1 | Rejected-AOC Not selected in lottery |
Tender Value
₹51.4 L
EMD Value
₹51,400
Closing Date
12 Dec 2025, 5:00 pmClosed
SUPERINTENDING ENGINEER
O/O S.E, Jeypore R and B Division, Jeypore Jail ROad
Civil
2025_EICCL_122094_2
SE RANDB 08/2025-26
Open Tender
Civil Works - Roads
90 days
Kotpad
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹51,400
Yes
23 Mar 2026
27 Nov 2025
15 Dec 2025
27 Nov 2025
12 Dec 2025
27 Nov 2025
Earth work in excavation of foundation in Hard soil including hard moorum, stoney earth, earth mixed with boulders (except sheet rock and boulders requiring blasting) with all leads and lifts for guard wall including dressing & levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour T&P required for the work etc. complete and as directed by the Engineer-in-charge.
Supplying & filling in foundation & plinth with sand in 23.5cm(9”) thick layers including watering & ramming with cost, conveyance, royalties, taxes of the materials & labour with T&P required for the work etc.,complete as per direction of Engineer-in-Charge. (Measurement will be taken on finished compacted section only)
Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2") size clean black broken granite metal of approved quality from approved quarry including hoisting, lowering and laying in layers not excedding 15cm. (6") thick to the required level, ramming, watering, curring including frame work etc. complete including cost, conveyance, royalties and taxes of all materials and labour with T&P required for the work etc. complete as directed by the Engineer-in-charge.
Providing, lifting, hoisting and laying Reinforced cement concrete of M-20 grade as per approved designs and drawings having a minimum compressive strength (in work test) 200 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position complete as per direction of Engineer-In -Charge. Drain Bed
Drain wall
Drain Slab
Supplying, Cutting, Straightening coiled or bent up M.S. rods or Tor steel of SAIL(HYSD Fe-415) welding or jointing if necessary, bending, binding, tying the grills and laying in position as required for R.C.C. works and hoisting, lowering and placing in position in all floors according to approved designs and drawings including cost, conveyance, taxes of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P etc. complete in all respect as directed by the Engineer-in-charge All reinforcement steel and structural steel shall be procured from primary producers of steel-SAIL/RINL/TATA/ JINDAL/SHYAM STEEL. (Ground floor)
Providing weep holes in plain cement concrete abutment, wing wall and retaining wall with 100mm dia A.C Pipe, extending through the full width of the structure with slope of 1 V : 20 H towards drawing face including cost, conveyance, royalty taxes of all materials, labour T & P etc. complete as directed by the Engineer-In-Charge
Back Filling of surplus excavated earth at work site by initial lead of 50.00mtr and initial lift of 1.50mtr including cost of all labour T&P required for the work etc. complete as directed by Engineer-In-Charge
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
DTCN_DrainAunli_merged.pdf
Tender Documents • 1.54 MB
BOQ_567517.xls
BOQ • 1.64 MB
Download all tender documents and submit your bid