Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
17 Sept 2026, 6:00 pmClosed
SUPERINTENDER ENGINEER PHED CIRCLR NAGAUR
SUPERINTENDER ENGINEER PHED CIRCLR NAGAUR
Construction and Commissioning of JJY Tube Wells by DTH/Rotary/ Comb. rig of 200 mm dia, under RWSS Jurisdiction Div. Nagaur with 24 months defect liability period (ARC)
2026_PHCJA_596632_1
Nit No 10/2026-27 SE
Open Tender
Civil Works - Water Works
Percentage
365 days
Executive Engineer PHED Div. Nagaur
As per TD
2 documents required · 2 mandatory
₹5,000
Executive Engineer
₹3.2 L
Yes
18 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
10 Sept 2026 - 15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gra vel & it's primary packing and packing during development,lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water.Rates are exclusive of GST | |||||
| 1.01 | Nominal bore 200 mm dia. | 1 | per meter | 1,290.68 | ₹1,290.68 |
| 1.02 | Add 15% extra on above item (BSR Item no 2.1.1 to 2.1.3) for drilling depth beyond 100 mtr and upto 200 mtr, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | per meter | - | - |
| 1.03 | Add 40% extra on above item (BSR Item no 2.1.1 to 2.1.3) for drilling depth beyond 200 mtr, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | per meter | - | - |
| 2Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. Rates are exclusive of GST | |||||
| 2.01 | Nominal bore 200 mm dia. | 1 | per meter | 922.88 | ₹922.88 |
| 2.02 | Add 15% extra on above item (BSR Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | per meter | - | - |
| 2.03 | Add 30% extra on above item (BSR Item No 2.4.1 to 2.4.2) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | per meter | - | - |
| 2.04 | Add 15% extra on above item (BSR Item No 2.4.1 to 2.4.4) for drilling, where strata is collapsible and lowering of casing pipe is required . The work includes lowering of casing pipe, but excluding the cost of casing pipe. The rate shall be applicable for stretch of collapsible strata only. | 1 | per meter | - | - |
| 3Construction of Tube Well from ground level and upto 100 mtr. depth to accommodate housing and assembly pipe in all type of alluvium strata, unconsolidated formation such as pebbles, boulders etc. by percussion/ rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended upto date) and technical specifications for removal of overburden. The work includes the cost of lowering of casing pipe, but excludes the cost of casing pipe. Rates are exclusive of GST | |||||
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_1058094.xls
BOQ • 0.33 MB
Tech10.pdf
Tender Documents • 4.02 MB
corr10or12.pdf
PDF • 1.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .