| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC KOHLI NO 17509 GALI KHADDAR BHANDAR WALI BHI WALA ROAD BATHINDA PB 151001 | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹23.5 L Quoted ₹24.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.5 L+₹1.6 L (6.35%)Rejected-Finance | ₹26.5 L+₹1.6 L (6.35%) | L2 | Rejected-Finance other than L1 |
| 3 | L3₹27.1 L+₹2.2 L (8.94%)Rejected-Finance | ₹27.1 L+₹2.2 L (8.94%) | L3 | Rejected-Finance other than L1 |
| 4 | L4₹27.7 L+₹2.8 L (11.2%)Rejected-Finance | ₹27.7 L+₹2.8 L (11.2%) | L4 | Rejected-Finance other than L1 |
| 5 | L5₹27.9 L+₹3.0 L (12.1%)Rejected-Finance 306 SHIV BARI MARG PANCHVATI NAGAR BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | ₹27.9 L+₹3.0 L (12.1%) | L5 | Rejected-Finance other than L1 |
| Sl No | Description | Qty | Unit | M/s Luxmi Constructions L5 | M/s BALDEV SINGH L3 | M/s BHUPINDRA ENGINEERING WORKS L1 | Rasvinderpalandco L4 | GUPTA AND ENGINEERS L2 | ANANT ENTERPRISES L6 | GARG INFRA PROJECTS L7 | REYANSH GARG AND COMPANY L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone / boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles in any description and removing/disposal off from the site to outside MOD land complete all as specified and as directed. | 17.5 | Cum | 396 ₹6,930 | 100 ₹1,750 | 350 ₹6,125 | 100 ₹1,750 | 10 ₹175 Lowest | 1,500 ₹26,250 | 500 ₹8,750 | 1,500 ₹26,250 |
| 2.00 | Material and labour for brick work with sub class ‘B’ old size burnt clay bricks, straight or curved on plan exc. 6 metre mean radius built in cement mortar (1:6) complete all as specified and as directed by Engineer-in-charge. | 17.5 | Cum | 5,400 ₹94,500 | 300 ₹5,250 | 5,000 ₹87,500 | 5,000 ₹87,500 | 20 ₹350 Lowest | 7,000 ₹1,22,500 | 7,000 ₹1,22,500 | 1,200 ₹21,000 |
| 3.00 | Taking down cement plaster/rough cast plaster from brick walls/soffits of roof projections & chajjas /ceilings etc. including racking out joints, hacking for key & scrubbing down with water etc including disposal of rubbish material to any distance out side MOD land complete all as specified and as directed. | 100 | Sqm | 22.5 ₹2,250 | 300 ₹30,000 | 50 ₹5,000 | 30 ₹3,000 | 20 ₹2,000 Lowest | 20 ₹2,000 Lowest | 50 ₹5,000 | 250 ₹25,000 |
| 4.00 | Material and labour for 15mm thick cement plastering in cement mortar (1:4) on any face of Brick walls or concrete surfaces including mixing of liquid WPC in mortar @ 200 ml per bag of cement of 50kg, finished even and fair complete all as specified and as directed.
Note :- WPC shall be measured & paid separately as Supply only under appropriate item of BOQ. | 180 | Sqm | 288 ₹51,840 | 300 ₹54,000 | 170 ₹30,600 Lowest | 300 ₹54,000 | 300 ₹54,000 | 300 ₹54,000 | 500 ₹90,000 | 350 ₹63,000 |
| 5.00 | Supply only liquid water proofing compound complete all as specified and as directed. | 6 | Ltr | 180 ₹1,080 | 100 ₹600 | 65 ₹390 | 50 ₹300 Lowest | 100 ₹600 | 150 ₹900 | 300 ₹1,800 | 120 ₹720 |
| 6.00 | Material and labour for preparation of new steel and iron surfaces of any description, not otherwise described, exceeding 10 cm in width or girth, including cleaning the surface free from dust, dirt, grease, oil and other foreign matter and surface imperfections by rubbing down with emery paper/sand paper or by other approved means to obtain a clean, smooth and even surface and further applying one coat of red oxide zinc chromate primer and two coats of first-quality synthetic enamel paint of approved brand, shade and tint, each coat applied by brush only after proper preparation and complete drying of the preceding coat, to produce a smooth, uniform, durable and aesthetically acceptable finish, complete in all respects as specified and directed by the Engineer-in-Charge. | 50 | Sqm | 63 ₹3,150 Lowest | 200 ₹10,000 | 100 ₹5,000 | 500 ₹25,000 | 2,000 ₹1,00,000 | 150 ₹7,500 | 100 ₹5,000 | 200 ₹10,000 |
| 7.00 | Material and labour for preparation of plastered surfaces of walls/pillars /cornices (on new surface ) by brooming down with using broom/sand papering or by any other mean, washing down with water and applying two coats of cement base paint as per approved tint/colour with using paint brush complete all as specified and as directed. | 180 | Sqm | 54 ₹9,720 | 300 ₹54,000 | 50 ₹9,000 Lowest | 50 ₹9,000 Lowest | 300 ₹54,000 | 80 ₹14,400 | 99 ₹17,820 | 250 ₹45,000 |
| 8.00 | Demolition of cement concrete reinforced of any description such as slab, cover slab, pillar, steps, staircase, landing chajja, staging, fins, shelves, etc, including reinforcement cut as required to facilitate demolition and prepare the surface to casting/jointing new including removing rubbish material from building and thrown in low lying empty area at any distance from the site complete all as specified and as directed. | 1 | Cum | 540 ₹540 | 100 ₹100 Lowest | 500 ₹500 | 100 ₹100 Lowest | 500 ₹500 | 1,500 ₹1,500 | 500 ₹500 | 5,000 ₹5,000 |
| 9.00 | Material and labour for reinforced cement concrete M-15 (Nominal mix) using 20mm nominal size of graded coarse aggregate as in columns, pillars, piers, posts and struts and the like complete all as specified and as directed.
(NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of BOQ. | 1 | Cum | 7,200 ₹7,200 | 5,000 ₹5,000 Lowest | 7,500 ₹7,500 | 5,000 ₹5,000 Lowest | 5,000 ₹5,000 Lowest | 8,000 ₹8,000 | 6,000 ₹6,000 | 6,500 ₹6,500 |
| 10.00 | Material and labour for reinforced cement concrete M-15 (Nominal mix) using 20mm nominal size of graded coarse aggregate as in foundations including rafts, footings, foundation beams, plinth beams, bases of columns, basement slab etc. complete all as specified and as directed.
(NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of BOQ. | 0.5 | Cum | 7,200 ₹3,600 | 5,000 ₹2,500 Lowest | 7,500 ₹3,750 | 6,000 ₹3,000 | 5,000 ₹2,500 Lowest | 8,000 ₹4,000 | 6,000 ₹3,000 | 5,500 ₹2,750 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
8 Aug 2026, 6:00 pmClosed
Garrison Engineer
Garrison Engineer AF Bhisiana Bathinda Punjab PIN 151201
REPAIR TO SECURITY FENCING, GATE, GARBAGE BINS, DRAIN, PATH, CULVERT, HARD STANDING AT OTHERS MISC WORKS IN DOMESTIC AREA (ZONE-I) AT BHISIANA UNDER GE (AF) BHISIANA
2026_MES_779134_1
GE/BHI/TOKEN-21/2026-27
Open Tender
Civil Works
Item Rate
244 days
Bhisiana
As per NIT
7 documents required · 7 mandatory
₹500
GE (AF) Bhisiana
₹50,000
Yes
GE AF Bhisiana
29 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
8 Aug 2026
1 Aug 2026
17 Jul 2026 - 29 Jul 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone / boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles in any description and removing/disposal off from the site to outside MOD land complete all as specified and as directed. | 17.5 | Cum | - | - |
| 2 | Material and labour for brick work with sub class ‘B’ old size burnt clay bricks, straight or curved on plan exc. 6 metre mean radius built in cement mortar (1:6) complete all as specified and as directed by Engineer-in-charge. | 17.5 | Cum | - | - |
| 3 | Taking down cement plaster/rough cast plaster from brick walls/soffits of roof projections & chajjas /ceilings etc. including racking out joints, hacking for key & scrubbing down with water etc including disposal of rubbish material to any distance out side MOD land complete all as specified and as directed. | 100 | Sqm | - | - |
| 4 | Material and labour for 15mm thick cement plastering in cement mortar (1:4) on any face of Brick walls or concrete surfaces including mixing of liquid WPC in mortar @ 200 ml per bag of cement of 50kg, finished even and fair complete all as specified and as directed.
Note :- WPC shall be measured & paid separately as Supply only under appropriate item of BOQ. | 180 | Sqm | - | - |
| 5 | Supply only liquid water proofing compound complete all as specified and as directed. | 6 | Ltr | - | - |
| 6 | Material and labour for preparation of new steel and iron surfaces of any description, not otherwise described, exceeding 10 cm in width or girth, including cleaning the surface free from dust, dirt, grease, oil and other foreign matter and surface imperfections by rubbing down with emery paper/sand paper or by other approved means to obtain a clean, smooth and even surface and further applying one coat of red oxide zinc chromate primer and two coats of first-quality synthetic enamel paint of approved brand, shade and tint, each coat applied by brush only after proper preparation and complete drying of the preceding coat, to produce a smooth, uniform, durable and aesthetically acceptable finish, complete in all respects as specified and directed by the Engineer-in-Charge. | 50 | Sqm | - | - |
| 7 | Material and labour for preparation of plastered surfaces of walls/pillars /cornices (on new surface ) by brooming down with using broom/sand papering or by any other mean, washing down with water and applying two coats of cement base paint as per approved tint/colour with using paint brush complete all as specified and as directed. | 180 | Sqm | - | - |
| 8 | Demolition of cement concrete reinforced of any description such as slab, cover slab, pillar, steps, staircase, landing chajja, staging, fins, shelves, etc, including reinforcement cut as required to facilitate demolition and prepare the surface to casting/jointing new including removing rubbish material from building and thrown in low lying empty area at any distance from the site complete all as specified and as directed. | 1 | Cum | - | - |
| 9 | Material and labour for reinforced cement concrete M-15 (Nominal mix) using 20mm nominal size of graded coarse aggregate as in columns, pillars, piers, posts and struts and the like complete all as specified and as directed.
(NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of BOQ. | 1 | Cum | - | - |
| 10 | Material and labour for reinforced cement concrete M-15 (Nominal mix) using 20mm nominal size of graded coarse aggregate as in foundations including rafts, footings, foundation beams, plinth beams, bases of columns, basement slab etc. complete all as specified and as directed.
(NOTE : Reinforcement and form work shall be measured and paid for separately under appropriate item of BOQ. | 0.5 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_872675.xls
BOQ • 0.29 MB
TenderDocToken21.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .