Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance GRAM DEVRADA TARABGANJ DISTRICT GONDA UTTAR PRADESH | GONDA | UTTAR PRADESH | 271001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
4 Jan 2021, 5:00 pmClosed
Superintenging Engineer
edc ayodhya
Shifting of HT/LT line from Sohwal Chauraha overbridge to Jwala Maiya Mandir Khirauni Sohawal, giving 15 H.P. Connection Payejal yojana at Vill. Sonwa Vill. Mangi Chandpur under Electricity Distribution Division Rudauli, Ayodhya
2020_MVVNL_540393_1
105 H(F)(W)/2020-21
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
as per tender specification
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, EDC
₹6,000
6 Jan 2021
26 Dec 2020
5 Jan 2021
26 Dec 2020
4 Jan 2021
26 Dec 2020
Amount
Carriage including loading, unloading & Proper stacking of following Stock materials from store/departmental store to Dump site distance 0 to 60 Kms. (distance approx)
S.T. Pole 11 Mtr. long
S.T. Pole 09 Mtr. long
PCC Pole 8.5 Mtr. Long
Three Phase ABC (3x120+1x95+1x16) sqmm
33 KV XLPE cable 3x300 sq.mm
33 KV Cable Jointing Kit 3x300 sq mm outdoor
ACSR Weasel Conductor
ACSR Dog Conductor
Three Phase Distribution Box
Transformer 25 KVA
Other matching Materials
Dragging of S.T.Pole from dump site to pit site
Dragging of PCC Pole from dump site to pit site
Fabrication and Errection of Single Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Single Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Errection of Double Pole Support on PCC Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Earthing of Poles as per RESPO Norms
Grouting and Binding of Stay with in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Hanaging Hosting & clamping and G.I. Pipe channel nut & Bolt 3 x300 mm2 XLPE 33 KV cable (cost of all accessories will be borne by contractor) as per RESSPO Norms
Installation and Fixing of 33 KV Cable Jointing Kit 3x300 mm2 Indoor XLPE Cable Box.
Stringing, Sagging, binding and jumpering of ACSR Weasel Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of ACSR dog Conductor as per RESSPO Norms
Stringing, Sagging, binding and jumpering of Three Phase ABC (3x120+1x95+1x16) sqmm as per RESSPO Norms
Mounting of 25 KVA Transformer as per RESSPO Norms.
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n Petc. complete in all respect . (all the material will be supplied by the contractor.)
Erection & Commissioning of of 3 Phase Distribution Box with help of clamps (Cost of clamp & Bolt & Nuts shall be borne by contactor ) as per Norms.
M/S ALOK CONSTRUCTION
M/s Shukla Enterprises
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .