| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹1.4 LAccepted-Finance 53 67 R N GUHA RD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹1.4 L | 1ST | Accepted-Finance 1st Lowest |
| 2 | 2ND₹1.4 L+₹2,521.35 (1.81%)Rejected-Finance B 180 B P TOWNSHIP KOLKATA 94 | 94 | ₹1.4 L+₹2,521.35 (1.81%) | 2ND | Rejected-Finance 2nd Lowest |
| 3 | 3RD₹1.4 L+₹4,583 (3.29%)Rejected-Finance | ₹1.4 L+₹4,583 (3.29%) | 3RD | Rejected-Finance 3rd Lowest |
Tender Value
₹1.4 L
EMD Value
₹3,000
Closing Date
21 Aug 2026, 11:00 amClosed
EE(C)/BR-IV
213B, C.R. AVENUE, KOL - 6
MAINTANANCE OF DAMAGED AND POT HOLES FREE ROAD BY BITUMINOUS SURFACEING TO PREVENT ROAD DUST AT A 67/50,STRAND ROAD IN WD NO-22
2026_KMC_1037480_1
KMC/EE(C)/IV/22/E26/25-26/R
Open Tender
CIVIL WORKS
Percentage
10 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,000
24 Aug 2026
11 Aug 2026
24 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 39.6 | M3 | 79.9 | ₹3,164.04 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 0.08 | %M3 | 93,621 | ₹7,723.73 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 165 | SQM | 358 | ₹59,070 |
| 4 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 165 | SQM | 188.23 | ₹31,057.95 |
| 5 | SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 680 mm X 90 mm Frame: 800 mm X 16.5 mm opening: 500mm Weight: 196 kg (approx) | 2 | EA | 3,382 | ₹6,764 |
| 6 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)) | 165 | SQM | 10.17 | ₹1,678.05 |
| 7 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Night Time ( Ref :As per KMC Rates, taxes, fees & Charges for the year 2019-2020, As per present market Price, Rate appvd. By D.G.(Civil) Circular No-21 of 2016-17 dtd-25.10.16 vide resolution MIC meeting (Item no-M-29.22 dtd-21.09.16), Mpl. Secretary Circullar no-02 of 2018-19 dtd.04.04.2018 ) | 165 | SQM | 45 | ₹7,425 |
| 8 | Sub Total | - | - | - | - |
| 9 | GST 18% | - | Nos. | - | - |
| 10 | CESS 1% | - | Nos. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2548610.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .