Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹2.1 L+₹2,035.50 (1.00%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹2.2 L+₹12,314.78 (6.05%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
12 Feb 2024, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Repair Hydraulic test and Commissioning of Lancashire Boiler No. WBL 5990 of Tilaboni Colliery under Bankola Area
2024_ECL_300214_1
ECL/GM/BA/E TENDER/23-24/EnM/291 Dt. 02.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
Tilaboni Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹2,600
26 Dec 2024
2 Feb 2024
13 Feb 2024
2 Feb 2024
12 Feb 2024
2 Feb 2024
2 Feb 2024 - 6 Feb 2024
Amount
Item Description/ Heading
Old both side fuside plug opening boring treading labour charges
New fusible plug both side & same position fitting with IBR T.C
Boiler all vale mounting repairing, overhauling & boiler inspector & inspection, with consumble & labour charges
Isolated or peeting of different shell strake to be build up by MMAW process using low hydrogen electrode and grind smooth
Complete brick work of both side flue pass, bottom of the boilerboth side furnace with materials & labour charges
Fabrication & fitting of fire bar of L/ boiler at both side furnace with cost cost & electrode
Supply & fitting 20" long 3/4 dia gauge glass tube
Laying of 2' common pipe line for both the L/boiler with flange bend, nuts & bolts etc
Lancashire boiler hydraulic test arrangment by inspector (Director of Boiler)
Lancashire boiler fitting purches materials tape joint, Cotton tape, steam joint, hole tight, nut bolt, rubber joint, fibre bush, rubber cone gauge glass etc
Lancashire boiler fitting, commissioning steaming & running condition with consmable & labour charges
Total impact of GST for the purpose of CTC
GT ENTERPRISE
NANDI ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .