| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹3.6 LAccepted-Finance VIDYASAGAR PALLY SUBUDDHIPUR P O P S BARUIPUR DISTT SOUTH 24 PARGANAS PIN 700144 | 24 PARAGANAS SOUTH | WEST BENGAL | 700144 | 1ST | Accepted-Finance 1st Lowest | |
| 2 | 2ND₹3.7 L+₹10,278.73 (2.87%)Rejected-Finance | 2ND | Rejected-Finance 2nd Lowest | |
| 3 | 3RD₹3.8 L+₹18,444.41 (5.15%)Rejected-Finance 18 1 CHANDI CHARAN GHOSH ROAD BARISHA KOLKA 700008 | KOLKATA | WEST BENGAL | 700008 | 3RD | Rejected-Finance 3rd Lowest |
Tender Value
₹3.6 L
EMD Value
₹8,000
Closing Date
16 Sept 2026, 11:00 amClosed
EE(C)/BR-IV
213B, C.R. AVENUE, KOL - 6
RESTORATION OF ASPHALTUM ROAD AND PAVER BLOCK FOOTPATH AT 12, MARCUS SQ. TO 164A, C.R AVENUE DUE TO DISTRUBED BY CESC DEPT. IN WD NO 039
2026_KMC_1041159_1
KMC/EE(C)/IV/039/E29/25-26/R
Open Tender
CIVIL WORKS
Percentage
10 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
23 Sept 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post work | 89.81 | M3 | 79.9 | ₹7,175.82 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 35.34 | %M3 | 936.21 | ₹33,080.98 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 324.1 | SQM | 358 | ₹1,16,027.8 |
| 4 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 324.1 | SQM | 188.23 | ₹61,005.34 |
| 5 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 39 | SQM | 24 | ₹936 |
| 6 | ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES | 2.93 | M3 | 5,498 | ₹16,081.65 |
| 7 | Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete | 39 | SQM | 124 | ₹4,836 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 220 | MTR | 8.17 | ₹1,797.4 |
| 9 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 90 | MTR | 8.17 | ₹735.3 |
| 10 | Supplying and laying factory made flat channel stone of cement concrete M-20 (1:1.5:3) machanicaly vibrated; size 500mm X 300mm X 100 mm; making joints with cement mortar (1:4) incldg cost of all materials and labours but excluding the cost of under bed (for road-diveder) | 140 | EA | 211.19 | ₹29,566.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2556619.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .