| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.8 LAccepted-AOC | ₹38.8 L | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | K.RAMESH BABU L2 | Bharathi Raja L1 | Amma Systems L5 | GVNs MATHURA PROPERTIES L3 | S D CONSTRUCTION L4 | E.BHARATHKUMAR L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | HSC BUILDING :Clearing jungle including uprooting of trunk vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 195 | sq.m | 5 ₹975 Lowest | 5 ₹975 Lowest | 18 ₹3,510 | 5 ₹975 Lowest | 10 ₹1,950 | 6 ₹1,170 |
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 169.82 | cu.m | 260 ₹44,152.03 | 230 ₹39,057.57 | 520 ₹88,304.06 | 246 ₹41,774.61 | 200 ₹33,963.1 Lowest | 251 ₹42,623.69 |
| 3.00 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 22.3 | cu.m | 1,700 ₹37,911.29 | 1,500 ₹33,451.14 | 2,150 ₹47,946.63 | 1,570 ₹35,012.19 | 1,200 ₹26,760.91 | 1,140 ₹25,422.87 Lowest |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 22.95 | cu.m | 5,100 ₹1,17,066.22 | 4,500 ₹1,03,293.72 | 8,200 ₹1,88,224.11 | 5,085 ₹1,16,721.9 | 3,900 ₹89,521.22 Lowest | 4,751 ₹1,09,055.21 |
| 5.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 118.47 | cu.m | 45 ₹5,331.19 | 40 ₹4,738.84 Lowest | 180 ₹21,324.77 | 42 ₹4,975.78 | 40 ₹4,738.84 Lowest | 45 ₹5,331.19 |
| 6.00 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 23.2 | cu.m | 100 ₹2,320.49 Lowest | 110 ₹2,552.54 | 950 ₹22,044.62 | 222 ₹5,151.48 | 400 ₹9,281.95 | 119 ₹2,761.38 |
| 7.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). Upto Basement | 199.84 | sq.m | 500 ₹99,919.88 | 450 ₹89,927.89 Lowest | 850 ₹1,69,863.79 | 516 ₹1,03,117.31 | 850 ₹1,69,863.79 | 521 ₹1,04,116.51 |
| 8.00 | Ground Floor | 268.64 | sq.m | 990 ₹2,65,958.3 | 750 ₹2,01,483.56 | 850 ₹2,28,348.04 | 480 ₹1,28,949.48 Lowest | 900 ₹2,41,780.27 | 521 ₹1,39,963.91 |
| 9.00 | Design Mix Concrete : Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement ratio with plasticizer using 20mm and down concrete structural elements under controlled water graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the depart- mental officers comple.-1m3 Foundation & Basement | 33.31 | cu.m | 7,500 ₹2,49,846.17 | 8,500 ₹2,83,158.99 | 9,000 ₹2,99,815.4 | 8,100 ₹2,69,833.86 | 8,000 ₹2,66,502.58 | 6,735 ₹2,24,361.86 Lowest |
| 10.00 | Ground Floor | 28.32 | cu.m | 7,700 ₹2,18,052.97 | 8,500 ₹2,40,707.82 | 9,000 ₹2,54,867.11 | 7,650 ₹2,16,637.04 | 8,200 ₹2,32,212.25 | 6,848 ₹1,93,925.55 Lowest |
Tender Value
₹45.6 L
EMD Value
₹46,000
Closing Date
22 Jul 2026, 3:00 pmClosed
BDO VP
BDO KTR
Construction of HSC(Health Sub-Centre) Building at Mannivakkam Panchayat in Kattankolathur Panchayat Union
2026_RDTN_684437_1
3/2026/A5 dt 07.07.2026
Open Tender
Civil Works
Item Rate
90 days
BDO KTR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹46,000
Yes
11 Aug 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
22 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSC BUILDING :Clearing jungle including uprooting of trunk vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 195 | sq.m | - | - |
| 2 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification. | 169.82 | cu.m | - | - |
| 3 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 22.3 | cu.m | - | - |
| 4 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 22.95 | cu.m | - | - |
| 5 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 118.47 | cu.m | - | - |
| 6 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 23.2 | cu.m | - | - |
| 7 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). Upto Basement | 199.84 | sq.m | - | - |
| 8 | Ground Floor | 268.64 | sq.m | - | - |
| 9 | Design Mix Concrete : Providing and laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of M25 grade for reinforced cement ratio with plasticizer using 20mm and down concrete structural elements under controlled water graded machine broken granite stone jelly excluding the cost of centering and shuttering and reinforcement but including curing, fixing, fan clamps etc., as per standard specification and as directed by the depart- mental officers comple.-1m3 Foundation & Basement | 33.31 | cu.m | - | - |
| 10 | Ground Floor | 28.32 | cu.m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_822751.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_822751.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .